1. Bridge overview Pylon Height


400 ft 17 main-span
cable pairs

17 back-span
cable pairs

The main span cables are initially stressed


in Stage DSX.4*, and stressed again in DS
X.7 (where X varies from 1 to 17 for each
Abut cable pair).

Cross-section

3
Civil 2018

* Unknown Load Factor w/o Construction Stages

4
Civil 2018

* Unknown Load Factor with Construction Stages

5
Civil 2018

2. Composite section with three parts

Stage 1

Stage 2

Stage 3

6
Civil 2018

3. Erection Sequence

Pylon First Segment Back Span Cable Main Span Cable


Temporary Support

Final Stage
7
Civil 2018

4. Main factors to be included for cable optimization


• Creep, Shrinkage
• Large displacement effect
• Multiple tensioning
• Constraints based on real displacements

8
Civil 2018

Tip 1. Initial pretension


• Unit pretension is not a good choice.
• Creep results due to unit pretension would be much different
from those due to the optimized pretension.
• Use cable pretensions optimized without considering erection
sequence.

9
Civil 2018

Tip 2. Multiple tensioning


• Each main cable is tensioned two times.
• ULF does not support multiple tensioning.
• Divide the pretension into two, i.e. first, second tensioning.
• First : Second = 80% : 20% or 70% : 30%
• Assign first tensioning to ‘Unknown’.

10
Civil 2018

Tip 3. Large Displacement Effect


• Do not apply creep/shrinkage and large displacement together
from the beginning.
• Start with creep/shrinkage only.
• When optimized pretension is obtained for the creep/shrinkage
, then add the large displacement effect.

11
Civil 2018

Tip 4. ULF Iteration


• Perform ULF with iteration number = 1.
• Check the changes of load factors.
• Perform ULF again until all the factors are close to 1.0.

12
Civil 2018

Tip 5. Real Displacement


• Create dummy deck along the main span.
• Activate all dummy deck elements at the beginning before
actual main deck elements are activated.
• Actual deck element and dummy deck element share same
node. Actual deck element
Node Node

Dummy deck element

Deformed shape of dummy deck elements.


13
Civil 2018

Constraints
Horizontal displacements of pylon: Within ±0.5 in at final stage

Vertical displacements of main deck: Within ±2 in at final stage

14
Civil 2018

Change of vertical displacements after iterations

15
Civil 2018

Change of horizontal displacement after iterations