HWA LUN SAFETY DAILY ACTIVITY MONITORING AND MANPOWER HEADCOUNT

CORPORA TION 安全日常活动监控 和人力资源


2705 Bandong Tower, 366 Barraca San Nicolas Manila - Tel No.: 83612710

DATE :Augus 03, 2021 INCHARGE : gubing


DURATION : 7am to 5pm TOTAL MANPOWER : Filipino workers 23 / Chinese 3 / staff 3

ACTIVITY LOCATION MANPOWER REMARKS POSITION HEADCOUNT


th
Replace of broken glass 10 floor 5 PROJECT MANAGER 1
nd
Installation of veneer bracket & cladding 2 floor rear 3 PROJECT IN CHARGE 1
Sealant application Rear & Front Elevation 8 SITE ENGINEER / QA QC 1

VIP installation of main keel Roof deck 5 SAFETY & HEALTH OFFICER 1
Housekeeping 0 0 FOREMAN 1

Chinese monitoring X 3 SUPERVISOR X

Chinese translator X 1 TRANSLATOR X

SITE SECRETARY X

WELDER 3

INSTALLER / HELPER 21

TOTAL

NOTE :

THIS ACTIVITY IS VALID ONLY ON THE DATE & TIME IT WAS APPROVED. ANY EXTENSION SHOULD BE COORDINATED WITH THE MANAGEMENT. WORK
LOCATION SPECIFIED ON THIS DOCUMENT IS SAFE TO PROCEED. ALL NECESSARY SAFETY PRECAUTIONED WAS INITIATED.

PREPARED BY : APPROVED BY :

You might also like