Calculate ST sheet:10 Model ANT A51- Efficiency (90%)

Plan/ Day 21000 10 HOURS


Process
Efficiency UPH Plan Current(현재 ) Man power Man power
No S/T (s) UPH (1 H) 7.5 7.5 Jig Spare Final Man power
(90%) (10H) Jig -Machine Q'ty Jig Machine Q'ty (Predictions) actual

Assy1: ANS+PET
1 2.00 0.90 1620 12150 16200 13 1.7 3 0 1.3 1

Assy2: TOP ANS + FPCB


2 2.90 0.90 1117 8379 11172 19 2.5 3 1.9 1

Assy3: Assy1+Assy2
4 2.89 0.90 1122 8412 11215 19 2.5 3 0 1.9 2

Assy4:Remove film
5 2.83 0.90 1144 8576 11435 18 2.4 - 1.8 2

Assy5: Assy 5+Ferrite


6 3.00 0.90 1080 8100 10800 19 2.6 3 0 1.9 2

Assy6: Remove film


7 2.67 0.90 1215 9113 12150 17 2.3 - 1.7 1

Assy7:Assy 7+ Grapheshite
8 3.20 0.90 1013 7594 10125 21 2.8 3 0 2.1 2

Assy8: Remove film


9 2.78 0.90 1165 8741 11655 18 2.4 - 1.8 2

Assy9:Assy9+Adhesive tape
10 3.10 0.90 1045 7839 10452 20 2.7 3 2.0 2

Assy10: Remove film


11 2.00 0.90 1620 12150 16200 13 1.7 - 1.3 1

Function MST+NFC
12 2.65 0.90 1223 9170 12226 17 2.3 3 0 1.7 2

Visual
13 3.99 0.90 812 6090 8120 26 3.4 - 2.6 3

Packing
14 - - 1.0 1

Total 23 22
Calculate ST sheet:10 Model ANT A426N MST- Efficiency (90%)
Plan/ Day 40000 7.5 HOURS
Process
No S/T (s)
Efficiency UPH UPH UPH Plan Current(현재 ) Request (요청) Jig Spare Total Request (요청)
Man power
(90%) (1 H) (7.5H) (10H) Jig -Machine Q'ty Jig Machine Q'ty Jig Machine Q'ty Jig Machine Q'ty (Predictions)

Assy 1
1 (FPCB + ANS Front) 3.38 0.90 959 7189 9586 5.6 6 6 0 6 5.6

Assy 2
2 (Assy 1 +ANS Rear) 3.45 0.90 939 7043 9391 5.7 6 6 0 6 5.7

3 Removel Film 3.55 0.90 913 6845 9127 - 0 0 5.8

7 Visual 1 3.30 0.90 982 7364 9818 - 0 0 0 5.4

8 Function 2.48 0.90 1306 9798 13065 4.1 4 4 4 4.1

9 Visual 2 2.80 0.90 1157 8679 11571 - 0 4.6

10 Packing - - 1.0

Total 32
ANT A426N MST- Efficiency (90%)
7.5 HOURS

Man power
Final Man power
actual

15
ANT A426B-NFC-
Calculate ST sheet:10 Model
Efficiency (90%)
Plan/ Day 42000 10 HOURS
Process Jig Jig
No S/T (s)
Efficiency
UPH (1 H) 7.5
UPH Plan Current(현재 ) Man power
Final Man power
Man power
Supplier Supplier
(90%) (10H) Jig -Machine Q'ty Jig Machine Q'ty (Predictions) actual
Korea Việt Nam

1 Assy 1: 2.03 0.90 1596 11970 15961 3.5 4 3.5 2

2 Assy 2: 2.25 0.90 1440 10800 14400 3.9 4 3.9 2


Remove film
4 1.80 0.90 1800 13500 18000 3.1 3.1

5 Function check 2.40 0.90 1350 10125 13500 4.1 6 4.1 1

6 Visual 2.80 0.90 1157 8679 11571 4.8 4.8

Total 19 12
ANT A516V-
Calculate ST sheet:10
Efficiency (90%)
Plan/ Day 10000 7.5 HOURS
Process
Efficiency UPH UPH UPH Plan Man power Man power
No S/T (s) Final Man power
(90%) (1 H) (7.5H) (10H) Jig -Machine Q'ty (Predictions) actual

Assy 1
1 (Bot ANS+Black PET) 4.30 0.90 753 5651 7535 1.8 1.8 3

Assy 2
2 (TOP ANS+ Ferite+ Graphite) 7.50 0.90 432 3240 4320 3.1 3.1 3

Assy3
3 (FPCB + Assy2) 8.70 0.90 372 2793 3724 3.6 3.6 4

Assy 4
4 (Assy 3+ Assy1) 6.90 0.90 470 3522 4696 2.8 2.8 3

Assy 5
5 Remove Film 4.30 0.90 753 5651 7535 1.8 2

Assy6
6 (Assy5 + Adhesive) 6.00 0.90 540 4050 5400 2.5 2.5 2

Assy 7:
7 Remove film 3.00 0.90 1080 8100 10800 1.2 1

8 Function 2.90 0.90 1117 8379 11172 1.2 1.2 1

9 Visual 6.60 0.90 491 3682 4909 2.7 2.7 3

10 Packing - 1.0 1

Total 22 23
Calculate ST sheet:10 Model ANT CANVAS 2- Efficiency (90%)

Plan/ Day 50000 7.5 HOURS

Process

No S/T (s)
Efficiency UPH UPH UPH Plan Current(현재 ) Request (요청) Jig Spare Total Request (요청)
Man power
(90%) (1 H) (7.5H) (10H) Jig -Machine Q'ty Jig Machine Q'ty Jig Machine Q'ty Jig Machine Q'ty (Predictions)

1 Assy 1 ( ANS +Graphite sheet) 4.10 0.90 790 5927 7902 8.4 7 3 3 8.4

Assy 2
2 4.80 0.90 675 5063 6750 9.9 7 3 3 9.9
(Cushion +FPCB)
Assy3
3 4.75 0.90 682 5116 6821 9.8 7 3 3 9.8
( Assy1 + Assy2)
Assy 4
4 5.40 0.90 600 4500 6000 11.1 7 3 3 11.1
(Assy 3+ Top Adhesive)
Assy 5
5 4.80 0.90 675 5063 6750 9.9 7 3 3 9.9
(Assy 4+ Bottom Adhesive)
Assy6
6 5.00 0.90 648 4860 6480 10.3 7 3 3 10.3
(Assy5 + Carrier)
Assy 7
7 4.00 0.90 810 6075 8100 0 8.2
Remove film

9 Marking 1.70 0.90 1906 14294 19059 3.5 3 0 3.5

Function 1 2.90 0.90 1117 8379 11172 6.0 6 0 6.0

Function 2 3.40 0.90 953 7147 9529 7.0 6 0 7.0

Function 3 3.50 0.90 926 6943 9257 7.2 6 0 7.2

10 CCD 4.20 0.90 771 5786 7714 8.6 0 8.6

11 Visual 8.50 0.90 381 2859 3812 17.5 0 17.5

Total 117
ANT CANVAS 2- Efficiency (90%)

7.5 HOURS

Man power
Final Man power
actual

10

10

11

11

12

11

10

19

127
ANT TXR 15inch- Efficiency
Calculate ST sheet:10 Model
(90%)
Plan/ Day 10000 10 HOURS
Process
Efficiency UPH Plan Current(현재 ) Man power Man power
No S/T (s) UPH (1 H) 7.5 Jig Spare Final Man power
(90%) (10H) Jig -Machine Q'ty Jig Machine Q'ty (Predictions) actual

1 Assy1: ANS+Grapheshite 4.98 0.90 651 4880 6506 2.0 0 1.5 2 2

2 Assy2: Assy 1 + FPCB 5.31 0.90 610 4576 6102 2.2 2 1.6 2 2
Assy3: Adheshive tape
4 +Assy2 4.80 0.90 675 5063 6750 2.0 0 0 1.5 2 2

5 Assy4:Remove film+Lami 3.80 0.90 853 6395 8526 1.6 - 1.2 2 2

6 Assy5: Remove film 3.51 0.90 923 6923 9231 1.4 - 0 1.1 2 2

12 Marking 1.92 0.90 1689 12666 16888 0.8 1 0 0.6 1 1

13 Function 5.71 0.90 567 4256 5674 2.3 - 1.8 2 2

14 Visual 7.5 0.90 432 3240 4320 3.1 - 2.3 2 2

Total 12 15 15
4.5
Calculate ST sheet:10 Model ANT Bloom 5G- Efficiency (90%)
Plan/ Day 10000 7.5 HOURS
Process
Man power
No S/T (s)
Efficiency UPH UPH UPH Plan Current(현재 ) Request (요청) Total Request (요청) (Predictions)
(90%) (1 H) (7.5H) (10H) Jig -Machine Q'ty Jig Machine Q'ty Jig Machine Q'ty Jig Machine Q'ty 7.5h

Assy 1 (TOP ANS 3N +Graphite


1 4.00 0.90 810 6075 8100 1.6 1 1 1 1.6
sheet)

2 Assy 2 (TOP ANS 2N +Assy 1) 4.00 0.90 810 6075 8100 1.6 1 1 1 1.6

3 Assy 3(BOT ANS 1N+BOT ANS 2N) 3.90 0.90 831 6231 8308 1.6 1 1 1 1.6

4 Assy 4 (FPCB+ Assy 2) 5.38 0.90 603 4521 6028 2.2 2 0 2.2

5 Assy 5(Assy 4+Assy 3) 5.70 0.90 568 4263 5684 2.3 1 1 1 2.3

6 Assy 6 (Assy 5 +Black Pet) 5.00 0.90 648 4860 6480 2.1 1 1 1 2.1

7 Remover film 9.83 0.90 330 2473 3298 0 4.0

8 Assy 7 (Assy 6+ Poron) 4.38 0.90 741 5554 7406 1.8 1 1 1 1.8

9 Assy 8 (Assy 7 +Adhesive tape) 5.95 0.90 545 4084 5445 2.4 1 1 1 2.4

10 Lami 5.25 0.90 617 4629 6171 2.2

Thêm công đoạn


11 Remove
Lami Film
do NG 4.37 0.90 742 5564 7418 1.8
nguyên liệu

11 Function 1 3.30 0.90 982 7364 9818 1.4 3 1 1 1.4

12 Function 2 2.80 0.90 1156 8671 11561 1.2 3 0 1.2

13 Function 3 3.50 0.90 926 6943 9257 1.4 3 1 1 1.4

14 CCD 4.67 0.90 694 5207 6943 1.9 2 0 1.9

15 Visual 7.92 0.90 409 3069 4093 3.3 0 3.3

Total 33
ANT Bloom 5G- Efficiency (90%)
7.5 HOURS

Man power
Final Man power
actual

31
Calculate ST sheet:10 Model ANT P3- Efficiency (90%)
Plan/ Day 70000 7.5 HOURS
Process
Current( Request Total
Plan
Efficiency UPH Jig 현재 ) (요청) Request (
Man power Final Man
No S/T (s)
(90%) (1 H)
UPH (7.5H) UPH (10H)
-Machine Jig Jig Jig Spare 요청) (Predictions) power( 7,5h)
Q'ty Machine Machine Jig Machine
Q'ty Q'ty Q'ty

1
Assy 1 4.04 0.90 802 6015 8020 11.6 1 10.6 10.6 11.6 10
(Graphite sheet + ANS sheet) Đối với Jig máy tự động : 1 bộ
bao gồm 2 Jig.

2
Assy 2 4.52 0.90 717 5376 7168 13.0 14 -1.0 4 3.0 13.0 13
(Cushion Tape +FPCB)

3
Assy 3 4.60 0.90 704 5283 7043 13.3 12 1.3 4 5.3 13.3 13
(Assy 1 +Assy 2)

4
Assy 4 3.25 0.90 997 7477 9969 9.4 9.4 9.4 9.4 9
(Remove film tape+ép lami)

5
Assy 5 4.55 0.90 712 5341 7121 13.1 12 1.1 4 5.1 13.1 13
(Assy 3 +Adhesive Tape)

6
Assy 6 2.72 0.90 1191 8934 11912 7.8 0 7.8 8
(Remove film tape+ ép lami)

7
Assy 7 3.50 0.90 926 6943 9257 10.1 0 10.1 10
(Nhặt xếp sản phẩm )
Maarking Machine 1 1.24 0.90 2616 19623 26164 3.6 3.6

Marking Machine 2 1.01 0.90 3195 23961 31947 2.9 2.9


8
Marking Machine 3 1.70 0.90 1908 14312 19082 4.9 4.9

Avg Marking Machine 1.32 0.90 2460 18454 24605 3.8 3 3 3.8 8

9 Function 3.45 0.90 939 7043 9391 9.9 10 -0.1 -0.1 9.9 10

10 CCD Visual 4.13 0.90 785 5884 7845 11.9 18 0 11.9 11

11 Check Tape in backside 4.05 0.90 800 6000 8000 11.7 0 11.7 12

12 Visual 2 6.22 0.90 521 3905 5207 17.9 1 17.9 18

Total 127 117


ANT P3- Efficiency (90%)
10.HOURS

Man power
(10h)

10

10

10

10

10

10

13

99
Calculate ST sheet:10 Model
Plan/ Day 40000
Process Plan Current(현재
Efficiency UPH )
No S/T (s) UPH (7.5H) UPH (10H) Jig -Machine
(90%) (1 H) Jig Machine
Q'ty
Q'ty
Assy 1
1 3.80 0.90 853 6395 8526 4.7 8
(ANS + Gray Pet)
Assy 2
2 4.25 0.85 720 5400 7200 5.6 4
(Graphite +FPCB)
Assy 3
3 4.15 0.85 737 5530 7373 5.4 4
(Cushion Tape+ Assy 2)
Assy 4
4 4.50 0.85 680 5100 6800 5.9 4
(Assy 3+Assy 1
Assy 5
5 4.78 0.85 640 4801 6402 6.2 4
(Assy4 + Black Pet)
Assy6
6 4.16 0.85 736 5517 7356 5.4 4
(Assy5 + Adhesive)
Assy 7
7 3.95 0.90 820 6152 8203 4.9
Remove film

10 Function 3.00 0.90 1080 8100 10800 4.9 5

11 CCD Visual 4.30 0.90 753 5651 7535 7.1

12 Remove Tape 2.28 0.90 1421 10658 14211

13 Check Tape in backside 2.30 0.90 1409 10565 14087

14 Visual 5.70 0.90 568 4263 5684 9.4

Total LINE MÁY TỰ ĐỘNG


ANT R8- Efficiency (90%)
7.5 HOURS
Request (요청)
Jig Total Request (요청) Man power
Jig Machine Spare Final Man power
Jig Machine Q'ty (Predictions)
Q'ty

-3 -3.3 6.3 6

2 1.6 7.4 7

1.4 1.4 7.2 7

1.9 1.9 7.8 8

2.2 2.2 8.3 8

1.4 1.4 7.3 7

0 6.5 7

-0.1 -0.1 4.9 5

0 7.1 7

3.8 4

3.8 4

0 9.4 9

TỰ ĐỘNG 80 80
Calculate ST sheet:10 Model
Plan/ Day 40000
Plan Current(현재
Process Efficiency UPH )
No S/T (s) UPH (7.5H) UPH (10H) Jig -Machine
(90%) (1 H) Jig Machine
Q'ty
Assy 1 Q'ty
1 3.80 0.90 853 6395 8526 4.7 8
(ANS + Gray Pet)
Assy 2
2 4.63 0.85 661 4956 6608 6.1 8
(Graphite +FPCB)
Assy 3
3 4.60 0.85 665 4986 6648 6.0 8
(Cushion Tape+ Assy 2)
Assy 4
4 4.80 0.85 638 4781 6375 6.3 8
(Assy 3+Assy 1
Assy 5
5 4.95 0.85 618 4636 6182 6.5 8
(Assy4 + Black Pet)
Assy6
6 4.00 0.85 765 5738 7650 5.2 8
(Assy5 + Adhesive)
Assy 7
7 3.95 0.90 820 6152 8203 4.9
Remove film
10 Function 3.00 0.90 1080 8100 10800 4.9 5
11 CCD Visual 4.30 0.90 753 5651 7535 7.1
12 Remove Tape 2.28 0.90 1421 10658 14211
13 Check Tape in backside 2.30 0.90 1409 10565 14087
14 Visual 5.70 0.90 568 4263 5684 9.4
Total LINE JIG THỦ CÔNG
ANT R8- Efficiency (90%)
7.5 HOURS
Request (요청) Jig Man power
Total Request (요청)
Jig Machine Spare Final Man power
Jig Machine Q'ty (Predictions)
Q'ty
-3 -3.3 6.3 6

-2 -1.9 8.1 8

-2.0 -2.0 8.0 8

-1.7 -1.7 8.4 8

-1.5 -1.5 8.6 9

-2.8 -2.8 7.0 7

0 6.5 7

-0.1 -0.1 4.9 5


0 7.1 7
3.8 4
3.8 4
0 9.4 9
HỦ CÔNG 82 82