2.4 LAYOUT 3
2.9 ROUTES 4
4.1 MAPS 4
ACCOMMODATION
2.4 LAYOUT
2.4.1 Accommodation layout to scale showing major components and overall dimensions.
2.5 ACCOMMODATION FOR COMPANY PERSONNEL
2.5.1 Accommodation to be provided for COMPANY and OTHER CONTRACTOR personnel in
accordance with Section IV – Scope of Work in sufficient detail to show layout, size and contents,
including details of facilities such as telephone, air conditioning, heaters, toilets and washroom,
etc.
2.6 MUD SYSTEM
2.6.1 Mud system flow diagram showing the direction of flow and all equipment associated with mud
mixing, storage and treatment and their capacities / outputs.
2.7 BOP STACK AND GAS HANDLING SYSTEMS
(a) BOP stack drawing(s) showing frame, valve outlet locations, mud boost line inlet, etc;
(b) detailed drawing(s) (preferably 3D) showing surface diverter system. Control schematic
should be included with the drawing;
(c) drawings of choke manifold, gas separator and riser gas separator;
(d) BOP Stack up for each BOP configuration showing heights of each component; and
(e) wellhead drawings showing heights of each component.