PROJECT TITLE: SMFI 120TPH MABINI FEEDMILL PROJECT

SUJECT: OVERTIME ACCOMPLISHMENT REQUEST

DATE: APRIL 11, 2021 SUNDAY


TARGET
NO OF
POSITION NO OF HRS SCOPE OF WORK
MANPOWER
FINISHED GO

INSTALLATON OF ANCHOR BOLT AND TIES AT GL


10 STEELMAN 8 39/F FOR ACCOMPLISHMENT:4PEDESTAL
INSTALLED

1 STEELMAN
1 SCAFFOLDER
3 WELDER
1 PAINTER INSTALLATON OF ANCHOR BOLT TEMPLATE AT GL
8 39/F-M AND GL E/24-28 FOR ACCOMPLISHMENT :
3 FOREMAN 14 PEDESTAL INSTALLED
1 LEADMAN
1 PLUMBER
1 TINSMITH
1 QC AIDE INSTALLATION OF FORMWORKS FOR PEDESTAL
6 CARPENTER/MASON 8 AT GL E FOR ACCOMPLISHMENT: 9 PEDESTALS
1 HELPER WITH FORMS AND BRACING

WELDING WORKS FOR THE FIXATION OF FORM


1 LEADMAN 8 FOR ACCOMPLISHMENT:16 PEDESTAL WITH
1 WELDER BRACING
FEEDM
2 FOREMAN
10 CARPENTER/MASON FABRICATION AND INSTALLATION OF
15 HELPER 8 FORMWORKS FOR 2ND BATCH PEDESTALS (12
3 LEADMAN PEDESTALS 3 SIDE FORMWORKS)
1 PAINTER
1 FOREMAN INSTALLATION OF TIES AND HORIZONTAL BAR
1 LEADMAN 8 FOR RET WALL (FINISH FIRST LIFT OF RETAINING
29 STEELMAN WALL)

RAW MATER
1 LEADMAN
4 STEELMAN INSTALLATION OF REBARS FOR PEDESTAL AT LINE
8
1 (ADDITIONAL HEIGHT FOR P3 AT GRID 1)
2 HELPER
1 OPERATOR
8 SITE DUST CONTROL
2 SPOTTER
1 ASST MECHANIC 8 ASSIST CHIEF MECHANIC
1 FUEL ASST 8 FUEL MONITORING
1 HILUX DRIVER
8 SERVICE OF EMPLOYEES
1 NHR DRIVER
2 DT DRIVER
1 BACKHOE OPERATOR 8 HAULING OF SOIL AT SEASIDE
1 SPOTTER
MONITORING AND MAINTENANCE OF POWER
2 ELECTRICIAN 88
SUPPLY
2 WAREHOUSEMAN 8 SITE AND WAREHOUSE MONITORING
DISINFECTION AND GENERAL CLEANING AT
1 UTILITY 8
TEMFACIL
1 TIMEKEEPER 8 MONITORING OF MANPOWER
3 SURVEY AIDE 8 CHECKING OF PEDESTAL ALIGNMENT
2 SURVEY CREW 8 CLEARING AND HOUSEKEEPING AT SITE

PROJECT TITLE: SMFI 120TPH MABINI FEEDMILL PROJECT


SUJECT: OVERTIME ACCOMPLISHMENT REQUEST

DATE: APRIL 11, 2021 SUNDAY


TARGET
NO OF POSITION NO OF HRS SCOPE OF WORK
MANPOWER
FINISHED GO

FEEDM
8 STEELMAN BACKFILLING
2 AND COMPACTION FOR PERIMETER (TARGET : 1 LAY

1 LEADMAN 2 DISMANTLING OF FORMWORKS FOR PEDESTAL


3 CARPENTER/MASON (TARGET: 4 PEDESTAL)
3 WELDER 2 DISMANTLING OF BRACING FOR PEDESTAL
1 HELPER (TARGET: 4 PEDESTAL)
1 LEADMAN 2
FORMWORKS INSTALLATION FOR RET WALL
3 CARPENTER/MASON
(TARGET: 1 SPAN 6M)
1 STEELMAN
INSTALLATION OF TIES FOR 2ND LIFT (TARGET: 2
10 STEELMAN 2
PEDESTAL)
ACTUAL
NO OF
SCOPE OF WORK POSITION NO OF HRS SCOPE OF WORK
MANPOWER
FINISHED GOODS WAREHOUSE

ON OF ANCHOR BOLT AND TIES AT GL


INSTALLATION OF ANCHOR BOLT A
R ACCOMPLISHMENT:4PEDESTAL 9 STEELMAN 8
INSTALLED FIXATION OF STIRRUPS AT GL 39/F

1 STEELMAN

3 WELDER
N OF ANCHOR BOLT TEMPLATE AT GL 1 PAINTER INSTALLATON OF ANCHOR BOLT TEM
GL E/24-28 FOR ACCOMPLISHMENT : 8
14 PEDESTAL INSTALLED 1 FOREMAN AT GL 39/F-M; GL E/24-28; GL N/31

1 PLUMBER
1 TINSMITH
ION OF FORMWORKS FOR PEDESTAL 1 FOREMAN
5 CARPENTER/MASON FORM PEDESTAL INSTALLATION AT G
OR ACCOMPLISHMENT: 9 PEDESTALS 8
39
WITH FORMS AND BRACING 1 HELPER
WORKS FOR THE FIXATION OF FORM 1 FOREMAN
1 LEADMAN FORM PEDESTAL FIXATION BRACING
OMPLISHMENT:16 PEDESTAL WITH 8
E/31-39
BRACING 2 STRUCTURAL FITTER
FEEDMILL TOWER

CATION AND INSTALLATION OF


RKS FOR 2ND BATCH PEDESTALS (12
ESTALS 3 SIDE FORMWORKS)

TION OF TIES AND HORIZONTAL BAR


INSTALLATION OF TIES AND HORIZO
ALL (FINISH FIRST LIFT OF RETAINING 16 STEELMAN 2
BAR FOR RET WALL
WALL)
1 LEADMAN/MC
5 CARPENTER/MASON RECTIFICATION OF ALIGNMENT F
2
PEDESTAL PRIOR TO CONCRETE POU
6 HELPER
1 LEADMAN/MC
5 CARPENTER/MASON 2 RECTIFICATION OF ALIGNMENT F
PEDESTAL PRIOR TO CONCRETE POU
6 HELPER
RAW MATERIALS WAREHOUSE

ON OF REBARS FOR PEDESTAL AT LINE


TIONAL HEIGHT FOR P3 AT GRID 1)
SITE DUST CONTROL

ASSIST CHIEF MECHANIC


FUEL MONITORING

SERVICE OF EMPLOYEES

AULING OF SOIL AT SEASIDE

NG AND MAINTENANCE OF POWER


SUPPLY
ND WAREHOUSE MONITORING
TION AND GENERAL CLEANING AT
TEMFACIL
ONITORING OF MANPOWER
KING OF PEDESTAL ALIGNMENT
NG AND HOUSEKEEPING AT SITE

ACTUAL
SCOPE OF WORK NO OF POSITION NO OF HRS SCOPE OF WORK
MANPOWER
FINISHED GOODS WAREHOUSE

FEEDMILL TOWER
MPACTION FOR PERIMETER (TARGET : 1 LAYER)

ING OF FORMWORKS FOR PEDESTAL


(TARGET: 4 PEDESTAL)
TLING OF BRACING FOR PEDESTAL
(TARGET: 4 PEDESTAL)
ORKS INSTALLATION FOR RET WALL
(TARGET: 1 SPAN 6M)

ON OF TIES FOR 2ND LIFT (TARGET: 2


PEDESTAL)
REMARKS
SCOPE OF WORK

ATION OF ANCHOR BOLT AND


2 PEDESTAL
ON OF STIRRUPS AT GL 39/F-M

ON OF ANCHOR BOLT TEMPLATE


11 PEDESTAL
9/F-M; GL E/24-28; GL N/31-32

ESTAL INSTALLATION AT GL E/31-


7 PEDESTAL
39

DESTAL FIXATION BRACING AT GL


7 PEDESTAL
E/31-39

TION OF TIES AND HORIZONTAL 8 SPAN-REBAR INSTALLATION


BAR FOR RET WALL FOR RETWALL

ICATION OF ALIGNMENT FOR


2 SPAN ALIGNED
L PRIOR TO CONCRETE POURING

ICATION OF ALIGNMENT FOR 1 SIED=5 SPAN FORMWORKS


L PRIOR TO CONCRETE POURING
REMARKS
SCOPE OF WORK