Professional Documents
Culture Documents
HIGHER COLLEGES OF
TECHNOLOGY
FACULTY OF ENGINEERING
TECHNOLOGY AND SCIENCE
(FETS)
WORK PLACEMENT
General Log Book
Student Name: Reem Mohammed Alhosani
*All Students completing this logbook will be eligible for the Bachelor Program Industrial
Engineering Technology work experience.
Definitions:
1. Cheating:
Cheating is deliberately attempting to gain marks or academic credit dishonestly. It is also cheating to help someone
else to gain marks or academic credit.
Examples of Cheating:
Copying anything done by another student and submitting it as your own.
Giving another student access to your electronic files. And allowing them to use your work as their
own.
Allowing another student/person to take your test/assessment or do your project for you.
2. Plagiarism:
Plagiarism is deliberately presenting another person’s work as your own without acknowledgement or reference.
Examples of Plagiarism:
Using the work of someone else, or changing some words and keeping the same structure and the
same meaning without noting the source(s), and submitting it as your own work.
Taking text from many other sources and putting the pieces together as one document and
submitting it as your own work, without noting the source(s).
Downloading information, pictures or charts from the internet and inserting the material into your
own document and submitting it as your own work without noting the sources(s).
If you copy from someone else or allow another student to copy from you, or if you cheat in any other way, you may
be dismissed from the course and college. Any books, company brochures or other materials (such as photos, charts
or information from the Internet) which you have used to help you complete this work must be clearly referenced in
the work itself. To present material copied from books or other sources without referencing will be regarded as
plagiarism.
I verify that I have not plagiarized or copied this work بيان األمانة الدراسية
from another person and submitted it as my own work ) رقم الشعبة ( الطالب في الشعبة )أنا الموقع أدناه ( اسم الطالب ورقمه
أثبت أنني لم أنقل نصا ً مؤلفا ً وجاهزاً كما أنني لم أنسخ عمل شخص آخر ونسبته لنفسي.
ID: H00349486
التاريخ: __________________________
Signature: Reem
When I begin work experience, I will become an employee of the company, and will work the timings
as specified by my employer.
I will not try to change my hours or days of work with the company, my faculty supervisor, or anyone
else.
I will follow all the rules and regulations of that employer during the period of the Work Experience.
I will respect the confidentiality of the work that I do with the company
If for any reason I am unable to go to work any day during my work experience placement, I will phone and advise
my company supervisor at work and my faculty mentor before 10.00 a.m. If my faculty supervisor is not available, I
will leave a voicemail or send an SMS.
ID: H00349486
Signature: Reem
Company Name: Abu Dhabi Distribution Company Company Supervisor: Ms. Lateefa Ahmed Alremeithi
Company
Week # Department/ Work Assignment Company Evaluation / Comments Supervisor
Supervisor Signature
Section
Familiarization with Company, HR and Engineering Safety Training & Ahmed demonstrated enthusiasm and willingness to
Procedures learn about the company and its stakeholders. He
Week 1
HR Tour of facilities and introduction to key stakeholders
Mr. A proposed a few changes to the work plan to challenge
Example
himself further, which we were happy to
Training Review of the work plan Safety Officer
accommodate.
Write a short report on the Company, it’s departments, product /
services (for the purposes of the logbook and final report)
Have a background about the company, vision, mission, Ms. Lateefa
strategy, and operations they make. Also, have enough Ahmed Alremeithi
information about the health, safety, and environment for the
employee.
HR Sr. Learning &
1 See the required plan for the work placement
Department Complete the work should be done during the meeting
Development
Write and submit the daily logbook for week 1 by writing what Analyst
we had in meetings.
Collecting data for the final report
ER & CR
CR & ER
Attend the meetings daily
Department Ms. Lateefa
Give a brief about myself for engineers Ahmed
ADF & Write and submit the daily logbook for Alremeithi
Connection
week 4 by writing the important points in
Projects
4 meeting Sr. Learning &
Department
Taking notes to help me writing the report Development
Asset Clarify all doubts by asking the engineers Analyst
Commissioning
for explanation
& Control
Department
CR & ER Water
Division
CR & ER
Operation
Department Attend the meetings daily
Write and submit the daily logbook for
CR & ER Ms. Lateefa
Network week 5 by writing the important points in Ahmed
Department meeting Alremeithi
Taking notes to help me writing the
5 Recycled report Sr. Learning &
Water O&M Development
Clarify all doubts by asking the engineers
Department Analyst
for explanation
Leak Detection Know each department role and benefit
Department from them
Water
Planning &
Maintenance
Department.
Electricity
Maintenance
Write and submit the daily logbook for
Planning
week 6 by writing the important points in
Department.
meeting Alremeithi
Electricity & Taking notes to help me writing the
Sr. Learning &
Water report
Development
Operations Clarify all doubts by asking the engineers Analyst
for explanation
Department –
Know each department role and benefit
Reporting
Section. from them to have more knowledge
Control Centre
Department.
Dispatch &
Logistics
Department.
Water Quality
Assurance
The log book will be handed to you separately by the Work Experience Coordinator or Faculty Mentor.
The following information is a guide to what you should write in your log book:
Reflective feedback
o What you liked the work/tasks you did
o Things you liked about your job/Company
o How you felt about your work performance
o Comment on alignment between college knowledge and skills and workplace
needs / demands
o Recommendations for yourself, the College and the Company
Amendment /Revision: Issue No 1 24
Date: 7 May 2019
o Areas for personal development
Department: Date: 11/July/2021
Location: Abu Dhabi Distribution Company, Abu Dhabi Day number: 31
Details: Use this form to complete a daily record of activities
For Sunday, the meeting was cancelled so I continue doing my work for the final report
and presentation.
Every engineer in ADDC departments has a role, so the Water Quality Assurance engineer
has the responsibility of reviewing the water quality test results, preparing the
correspondence for SPS and letters to RSB and other bodies, assuring the test results entered
in Water Quality Regulations Reporting System (WQRRS), and checking the water quality
parameters compliance & sampling compliance by generating reports from WQRRS.
After that, they discussed about the recycled water, there are three major sewerage
treatment plants producing recycled water for ER&ER and they are Mafraq, Al Wathba 1 & 2.
Distribution network can be divided into different water quality regions based on population
and quantity of water being distributed. The regions are Central that has 27 distribution
zones, Eastern that has 43 distribution zones, and Western with 13 zones with a total of 83
distribution zones.
Department of Energy is look for the GCC Standardization Organization (GSO) standards of
drinkable water that made by the Emirates Authority for Standardization and Metrology
(ESMA) or World Health Organization’s water quality recommendations.
Next, they presented for us about the jet pipe servo valve operating principle. The
hydraulic oil enters the spray pipe through the filter directs the small fluid flow to the two
receivers, and each receiver is connected to one end of the second stage reel. All forces on
the second reel of stages are equal and it remains at the zero position. When the electrical
input signal is applied to the torque motor coil, electromagnetic force is generated. This force
causes the armature and jet tube assembly to rotate about the armature's pivot point,
causing more fluid to impinge on one receiver than the other. The pressure difference
generated between the end chambers of the spool activates the movement of the spool,
which in turn opens the second-stage port, causing fluid to flow into and out of the dual-port
control valve (A and B) according to the direction of the spool. The direction of movement of
the spool is opposite to the direction of rotation of the injection pipe. When the spool moves,
the feedback spring generates a force in the injection tube that is opposite to the force of the
torque motor.
The spool continues to move until the force generated by the feedback spring equals the
force generated by the torque motor. Then the position of the jet tube returns to the center
of the two receivers. Typically, a small pressure difference is maintained at both ends of the
spool to overcome the Bernoulli flow force that tends to close the valve and the force of the
feedback spring. The spool displacement is proportional to the control current in the torque
motor. As the spool moves, fluid is proportionally in and out of the second stage control ports
(A and B). When the input signal to the torque motor changes in amplitude and polarity, the
second stage valve core precisely follows the signal and measures the fluid accordingly.
The last meeting of this week was with Telecommunication and Hardware Department. It
was about the activities of the department. Preparing the online data from the field
equipment related to the maintainability and expandability of the SCADA components is the
responsibility of Hardware Department. In addition, it forms the interface with the network
department and expansion projects, when necessary, with the boards, consultants and
contractors related to ADWEA, TRANSCO, ADDC. The hardware part also maintains SCADA
components such as RTU, DC system and SCMS by performing regular preventive and
corrective maintenance. SCMS all work related to the SCMS system in the initial stage. RTU
All work related to the following RTUs: Master Station, Switch Station, Substation, and RMUs.
Attachment No 4 Pt 2
Work Placement Attendance Record
Date Hrs Signature Date Hrs Signature
Please include the Proof/Evidence for the Work Placement activities (for each day):
Day 1: Day 2:
Day 5: