BALAGTAS STATION

CONSTRUCTION ACTIVITY AT CONCOURSE LEVEL


As of 2021-05 (May)
LEGEND:

CONSTRUCTION: COMPLETED
Concourse Slab Floor, Beams, & Girders
Slab on Grade, Columns, & Pile Cap

CONSTRUCTION: UNSTARTED
Concourse Slab Floor

NOTES:
1. COMPLETED CONCRETE WORKS DATED AS PER ACTUAL FINISH OF CONCRETE POURING.
2. INFORMATION APPLIED IN THE MODEL ARE GATHERED FROM THE ACTUAL SITE ACTIVITY.
3. INFORMATION APPLIED IN THE MODEL ARE REFERENCED TO SHOP DRAWINGS APPROVED
BY THE ENGINEER; IN LINE WITH SHOP DRAWINGS FOR APPROVAL.
4. INFORMATION OF THE MODEL SHOWN INDICATED AS PER DATE OF PREPARATION.

DATE PREPARED: MAY 18, 2021

BALAGTAS STATION - CONCOURSE LEVEL (FFL±0.00 = EL. +4.100M)


1 SCALE(A1):
BALAGTAS STATION
CONSTRUCTION ACTIVITY AT CONCOURSE LEVEL
As of 2021-05 (May)
LEGEND:

CONSTRUCTION: COMPLETED
Concourse Slab Floor, Beams, & Girders
Slab on Grade, Columns, & Pile Cap

CONSTRUCTION: UNSTARTED
Concourse Slab Floor

NOTES:
1. COMPLETED CONCRETE WORKS DATED AS PER ACTUAL FINISH OF CONCRETE POURING.
2. INFORMATION APPLIED IN THE MODEL ARE GATHERED FROM THE ACTUAL SITE ACTIVITY.
3. INFORMATION APPLIED IN THE MODEL ARE REFERENCED TO SHOP DRAWINGS APPROVED SUSPENDED SLAB
BY THE ENGINEER; IN LINE WITH SHOP DRAWINGS FOR APPROVAL. (CONCOURSE LEVEL)
4. INFORMATION OF THE MODEL SHOWN INDICATED AS PER DATE OF PREPARATION. Date of Actual Finish
Feb. 21, 2021
COMPLETED
DATE PREPARED: MAY 18, 2021

SUSPENDED SLAB
(CONCOURSE LEVEL)
Date of Actual Finish
Jan. 30, 2021
COMPLETED

SUSPENDED SLAB
(CONCOURSE LEVEL)
Date of Actual Finish
SUSPENDED SLAB Mar. 23, 2021
(CONCOURSE LEVEL) COMPLETED
Date of Actual Finish
Mar. 16-17, 2021
COMPLETED

SUSPENDED SLAB
(CONCOURSE LEVEL)
Date of Actual Finish
Feb. 07, 2021
COMPLETED

BALAGTAS STATION - CONCOURSE LEVEL @ GRID LINE 8 - 14 / A - D


SUSPENDED SLAB
(CONCOURSE LEVEL)
1 SCALE(A1):
Date of Actual Finish
Apr. 17, 2021
COMPLETED

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19