Hazard Identification Plan

DISPLAY THIS HIP ON SITE. DISCUSS IT WITH THE WORKFORCE PRIOR TO THE START OF EACH NEW ACTIVITY.
Activity Hazard Identification RAM Control Action Contingency
Job Stages What could go wrong? How serious (Risk How to prevent it? All alternatives considered? Party Even with this controls in place, if the hazard still happens how can
would that be? Consider the impact on Assessment Procedures? Safety equipment? PPE? Qualified Responsible consequences be limited?
personnel, on local site assets and on the Matrix) Personnel? Certified equipment? Liaison parties? Person
environment

11. Road Cutting - Improper use of Sharp cutting tools for - Assign experience personnel to do the task Supervisor & - First aid box, first Aider & standby vehicle must be available on
raise floor can cause cut wounds. P-2B (L) correctly and safely workers site
A-2B (L) - Ensure that Cutting tools are checked properly
R-2C (L) and in good condition with valid inspection tag. - Emergency telephone numbers must be displayed on site
- Unidentified pinch points and sharp
edges of materials can cause hand and - Be aware and properly identify the pinch points - If incident occurs, report immediately to the following :
finger injury. - Ensure that materials to be installed are properly - HSSEO
piled and no sharp edges (Tel no. +673 7169062)
- Use the proper hand protection (non-slip hand
gloves) - Project Engineer
- Maintain the buddy system (Tel No. +673 8607080)
- Do not lift materials beyond the body capability
- Dust and small particles can cause eyes Emergency telephone numbers must be displayed on site.
and respiratory irritation - Maintain cleanliness on the worksite use vacuum o Ambulance 991
cleaner if necessary, to prevent the accumulation o Police 993
of dust and small particles. o Fire Brigade 995
- Use dust mask, clear eye spectacle o Search & Rescue 998
- Tool box talk to be conducted before the work will o Emergency Commence Center – (+673) 3372999
start.
- Ensure that PAUSE Process, intervention and
safety & quality at work are included in the tool
box talk.

HIP Description: MCY Phase 1 Upgrade Project (Generic)


Location: MCY, Kuala Belait HIP No.001 Prepared by: HSEO/Supervisor Reviewed by: Project Engr. Approved by: BSP Rep.
Revision: No.0 Page 11 of 11 Date: Date: Date:
Hazard Identification Plan
DISPLAY THIS HIP ON SITE. DISCUSS IT WITH THE WORKFORCE PRIOR TO THE START OF EACH NEW ACTIVITY.
Activity Hazard Identification RAM Control Action Contingency
Job Stages What could go wrong? How serious (Risk How to prevent it? All alternatives considered? Party Even with this controls in place, if the hazard still happens how can
would that be? Consider the impact on Assessment Procedures? Safety equipment? PPE? Qualified Responsible consequences be limited?
personnel, on local site assets and on the Matrix) Personnel? Certified equipment? Liaison parties? Person
environment

HIP Description: MCY Phase 1 Upgrade Project (Generic)


Location: MCY, Kuala Belait HIP No.001 Prepared by: HSEO/Supervisor Reviewed by: Project Engr. Approved by: BSP Rep.
Revision: No.0 Page 11 of 11 Date: Date: Date: