Professional Documents
Culture Documents
Inspection Closed-Out Form: Ships Name Ship Owner/Operator Date - Port of Inspection
Inspection Closed-Out Form: Ships Name Ship Owner/Operator Date - Port of Inspection
Contoh peta yang digunakan untuk pelayaran no. 3729 (Tg. Priok ke Cirebon)
ditemukan tidak dikoreksi. Tinjauan List Kumulatif dari NTM menunjukkan 2 urutan
koreksi tidak di koreksi selama bulan September 2021.
Root Cause The new chart just received on board and NTM just received in 2 days.
(Akar Masalah) Miss 1 chart to correction. Inspector need to fully corrected the chart.
Peta baru, baru saja diterima diatas kapal dan NTM baru diterima dalam 2 hari.
1 peta terlewat untuk dikoreksi. Inspector mengharuskan peta terkoreksi.
Corrective Action Chart No. 3729 has been completed up-date correction NTM weekly 38/21.
(Tindakan Perbaikan)
Peta no. 3729 telah selesai diperbaharui untuk koreksi NTM mingguan 38/21.
Preventive Action Regularly update Notice To Marine chart & publication correction every weekly.
(Tindakan Pencegahan) Monitoring of voyage chart corrections by the Master.
For Improvement Action to avoid this deficiency in the future, Master gave a training
for all officer on board as follow:
Perbaharui secara teratur NTM untuk koreksi peta & publikasi setiap minggu.
Memantau koreksi peta pelayaran oleh Nakhoda.
Untuk Aksi Perbaikan guna menghindari temuan ini dimasa yang akan datang,
Nakhoda memberikan beberapa pelatihan kepada seluruh perwira diatas kapal
sebagai berikut:
Page 1 of 2
INSPECTION CLOSED-OUT FORM
Ships Name GAS SUASA
(Nama Kapal)
Ship Owner/Operator SUASA BENUA SUKSES
(Pemilik/Pengelola Kapal)
Date | Port of Inspection 20 September 2021 SEMARANG
(Tanggal | Pelabuhan Inspeksi)
Close-Out evidence might be; documents, procedures, photos, certificate, service report, delivery order, etc.)
(Bukti tindak lanjut dapat berupa; dokumen, prosedur, poto, sertifikat, laporan kerja, bukti pengiriman, dll.)
CLOSED
Page 2 of 2