TECHNOLOGICAL INSTITUTE OF THE PHILIPPINES

363. P. Casal St. Quiapo, Manila

ARCHITECTURE DEPARTMENT

VANESSA B. DELA TORRE


AR511S4 - Architectural Design 9

UP-Philippine General Hospital Diliman Project


An integrated medical and research center through adaptation of new normal

CHAPTER I: PROJECT BACKGROUND of the most important facilities and equipment for
the healthcare workers as it can help them to
A. THE PROJECT prevent from infecting a disease.
Hospitals play an important role in a health care Philippines General Hospital Main located at the
in our society. It is an institutional type of building Taft Avenue, Manila is a tertiary stated-owned
that offer different types of services such as administered and operated by the University of
generic medical, radiology, surgery, psychiatric the Philippines-Manila. Philippine General
services, dental laboratories, and emergency and hospital Main is the largest training hospital in the
other outpatients care centers. Despite the rapid whole country of the Philippines. The Philippine
growth of the population of the county, it is general hospital served more than 600,000
essential and necessary for the national patients every year annually and remains referral
government to build Hospital every Local center for tertiary care. Serving and providing
Government Unit to makes it easier and quality service for the Filipinos for the whole
convenient for the people. nation.
Due to the rapid growth of covid cases in the The Philippines general hospital main now is
Philippines, the congestion of the facilities and currently battling for covid-19 inpatients and
hospital beds are fully occupied and some outpatients who admitted for treatment. Currently,
doctors could not accommodate of some the PGH stop accepting admitted Inpatients due
patients. As covid-19 disease to continue to rise to the rapid growth of Covid Patients. The highest
in the country, it is expected that some of the previous 250 bed-capacity of Philippine General
hospital and medical could stop accepting Hospital Main has now reached to it’s 266
outpatients. Most of the hospital are at maximum admitted patients for treatments.
capacity and some of the patients who are even According to the data of Philippine General
need of treatment are being sent to home. Hospital Demographics, previous 2018 the
Community transmission are still the main effect Philippine General hospital served a 647, 773 for
of it’s continuing growth of the Disease in the the total of Patients who admitted and 699, 063
country including the hundreds of daily death. for the year 2019. The year 2020 and 2021
Physical and social distance are still not followed decreased the size of patients due to the new
by other people such as public transportations, implementation of new normal setup for the
restaurants, malls and wet markets and other hospital and since march 2020 there have been
crowding areas. As the number of cases rising limited elective admissions. The whole year of
rapidly, the government are implementing and 2020 of total data, the PGH served more than
supporting the expansion of another hospitals in 200,000 and for the first half of 2021, the PGH
the National Capital Region (NCR). Adding some
served more than 150,000 of Patients who Diliman Covers the NCR and the contiguous
admitted. provinces of Bulacan and Rizal. The scope will
be focused on designing and planning &
circulation of the spaces such as the hospital
B. PROJECT OBJECTIVES 700-beds, functional areas, research
laboratories, educational program and
The major objectives of the proposal is to reduce the emergency areas and to cater all the needs of
overcrowding hospital facilities issues in Metro the users. The project is also focusing on
Manila. designing a new flexible spaces thru adaptation
To offer more research facilities, teaching hospitals
of the new normal life.
with more innovative in medicine. And to provide
more diagnostic center and complete equipment for The target users are all people around UP-PGH
the different kinds of disease. Diliman within 30-kilometer radius. The
The minor objective of the proposal is to provide a catchment area are from the National Capital
comfortable and sustainable facility and fully Region, Bulacan and Rizal area. It projected that
equipment for the health workers. And to provide a within 2042, the increase of population with 20.2
functional and efficient space for the health workers. million. It will be available for the local
And to design and create a friendly humane community who want to admit to avoid the
environment for patients and staffs. congested facility of other hospital.
C. THE CLIENT E. PROJECT DEVELOPMENT
The project development will first start to collect any
data spaces needed for medicals, teaching and
research center spaces. Then also to collect any data
for maps, photo-documentation, and the lot-bearing or
actual lot size for the project. And also to collect data
for the density or target market for the proposal or
project. And also to gather data and design according
University of the Philippines to the legal codes of the Philippines such as National
Building Code P.D.1096, B.P. 344 and P.D. 1185.
University of the Philippines eyes on And also to come up with the ideas to meet the new
implementing a new general hospital in Diliman, rules and policy design for the new normal setup.
Quezon City that will cater a 700 bed and a The project process of the proposal is to gather data
research and teaching center to be a world class for the possible space and requirements. And to
hospital. The University of the Philippines also secure a copy of the lot bearing of the site location.
focus on including a research facility and And also to gather data for the density or target
teaching center for the students. The new project market of the proposal. And to ensure all the legal
aspects of the applicable codes are followed correctly.
will help to decongest the overcrowding of the
The project output of the collected and data gathered
facilities and beds. The private sector will be the for the conducted research will be the new UP-
responsible for design, build and finance to the Philippine General Hospital Diliman: An integrated
project and to the full equipment of the medical medical and research center through adaptation of
laboraties. new normal.

D. PROJECT SCOPE AND LIMITATIONS CHAPTER II: SITE JUSTIFICATION

The proposed project will be a tertiary general A. SITE SELECTION CRITERIA


hospital to be located in the Arboretum Site. The For the selection site criteria, it is important to
target will be the admitted Inpatients and choose an appropriate site that will be feasible for
Outpatients within the catchment area of PGH the project.
For the General Site Criteria, the Lot Size and City, Las Pinas City, Malabon City, Navotas City,
Area is 20 points because the lot size is suitable Marikina City, Pasig City, Mandaluyong City,
and the 4.2 hectares is pass to the tertiary Muntinlupa City, San Juan City and as well as
hospital design project. The Vehicular Valenzuela City.
Accessibility is 20 points because the site is Metro Manila has many central business districts
accessible to any type of vehicle. The pedestrian such as Makati Central Business District,
accessibility is 10 because the site location has Bonifacio Global City, Ortigas Center and
existing pedestrian walkways that is suitable for Alabang. Metro Manila is home of the tallest
the transportation travel and existing traffic skyscrapers in the whole country and include
control system. The vulnerability to natural many Landmarks such as Shangri-La Plaza,
hazard is 5 because the site location is 5 EDSA Shrine and SM Megamall.
kilometers away to the active west valley fault Metro Manila main transportation is Jeepneys,
line of Marikina. The Climate is 5 because the followed by Railway Train, and Buses. The roads
site location has an irregular dry season and wet of metro manila are built from the city of manila
season. The availability of Utilities is 20 because that connects to each cities and metropolis
the quezon city supplied by the meralco power composed of 10 radials and 6 circumferential
company and Maynilad water services. The major roads.
existing of hospitals is 3 points because the site
location is mostly surrounded by hospitals within TOWN MAP
2 kilometers away. The total points for the Quezon City’s is a larger area of government-
general site criteria is 83. owned land for the development of public
For the specific site criteria, the target community improvements and for the local community.
is 30 points because it is near to the residentials Quezon City has six districts, among the six
and commercials. The vulnerable to man-made districts, Districts II has the most largest
hazard is 20 because the site location is free population with a 688, 773 or 23.46% of the total
from the smoke hazard of industrial population. While District V, has the most fastest
establishment. The site potential is 30 because with 1.79% which is even higher than the city’s
the location of the site is a tourism development, growth rate of 1.17%.
business sectors and agencies, job opportunities Quezon City is borded by Manila to the
and rationalized residential planning. The Southwest, and Caloocan and Valenzuela to the
property land use & zoning is 3 because the lot of west and northwest. San juan and Mandaluyong
the site is an open space & park and it is not by south lies. Marikina and Pasig to the
intended for institutional, but the site is not part of Southeast. While Marilao River lies San Jose del
the protected forest area of arboretum. The total Monte in the province of Bulacan.
points for the specific site criteria is 83. The Quezon City name after the former President
Manuel Luis Quezon select the city, it was
established during commonwealth period and
B. MACRO-MESO SITE ANALYSIS: REGION/ then replaced Manila in 1948. After the World
PROVINCE/ TOWN War from 1939-1945 the construction begin again
on capitol site. There are many historical
REGIONAL landmarks that can be seen around in Quezon
Metro manila or officially a National Capital City including the EDSA People Power
Region (NCR), is located at Southwestern portion Revolution and the site of Unang Sigaw ng
of Luzon and also one of the largest Regional in Balintawak.
the Philippines. Composed of 16 cities which is
City of Manila, Quezon City, Caloocan City, ROAD NETWORK
Taguig City, Makati City, Paranaque City, Pasay
Based on the traffic survey conducted by MMDA Silangan, and Batasan Hills. Followed barangays
Traffic engineering Center, EDSA was the most are Barangay White Plains, Blue Ridge B,
heavily used road in the National Capital Region Kaligayahan, Libis and Commonwealth are the
(NCR) with a total of 2.06 million vehicle per day. barangay who are constitute to a second tier for
As the types of vehicles, Jeepneys comprise 9% prioritizing emergency management planning and
of the total traffic volume of the EDSA Road while preparedness actions.
buses make up to 4%. 70% of cars comprises One of the most longest and active faults in the
while trucks represents 4%. Philippines is West Valley Fault, a 100 kilometer
According to QCPDO, as of 2009 the total road long. Quezon city is the second most affected
length of Quezon City is 2, 247.75 kilometers, it area by West valley fault (WVF) that runs from
increase from 32.34 from 2003. There are Barangay Bagong Silangan, Batasan Hills,
existing and inter-connection of main road and Matandang Balara, Pansol, Blue Ridge B, White
these are Katipunan Avenue, Nagkaisang Nayon, Plains, Bagumbayan and Ugong Norte. The west
South Zuzuarregui Street in Old Balara, valley fault roughly move 4 times in the last year
Congressional Avenue in Culiat. The road are and may be possible trigger within the next few or
also provided with alternate route to avoid ten years.
congested and traffic volume issues.
FLOOD HAZARD
POPULATION Quezon City have also a higher risk of Flood due
According to Philippine Statistics Authority, to the Monsoon rains or such typhoons in some
Quezon City has the most high total population particular areas of Quezon City. The city of
rate and from 2000-2020. With the rapid increase Quezon have a five catchment area river system,
of population in the city and the result of growth these are: San Juan River, Tullahan River,
population, every district demand for additional Marikina River, Pasig River and Meycauayan
institutions, health care and and the like. River and their tributaries and creeks with a total
The city of Quezon has surpassed the record length of 200 kilometer.
from 1980 with a one million mark and a total There are top three (3) barangay that have a
population of 1,165,865 and then to 2000 hit the greater risk of high flood susceptibility, these are:
two million population with 2,173,931 and then to Barangay Capri, Talayan and Katipunan.
2015 the Quezon City has hit three million mark According to Japan international corporation
population in the latest Philippine Statistics agency (JICA), climate change have a greater
Authority Census. impact that can cause the increase of affected
According to the Philippine Statistics Authority, areas in Quezon City by 2050 as much as 7%.
among the six districts of Quezon City, District II
remains the largest and most populous districts CLIMATE
with a total population from 2010 at 635,967 with According to PAGASA Climatology and
23.03 % and to 2015, it increase in 688,773 with Agrometeorology, Quezon City, it shows that
23.46% and a total of growth rate with 1.53. rainy season is from May to November with peak
Followed by District V who has the 2 nd most between July to September.
populous district and District VI. District V has the 175.5 in Novaliches drops to 42.9 in December.
largest and fastest growth rate population with a From July to September, the mean was 364.3,
total of 1.79 followed by District VI with 1.67. 492,1 and 664, 6 respectively. It was when
typhoon Ondoy in September 2009 hit metro
NATURAL HAZARDS Manila, the recorded rainfall volume was 1,123.5
There are top five (5) barangays are prioritize for mm almost twice more than the average 440 mm
earthquake impacts, these are: Barangay for the same month in 2007 and 2008.
Bagumbayan, St. Ignacius, Ugong Norte, Bagong
In terms of temperatures, the average high is 34’ Quezon City has five river system within
0 degree Celsius in April and May, 30’0 degree catchment area. First, the San Juan River which
Celsius in December and January while the collects surface run-off in 46% of the City’s
average low for the same months is 24’0 degree territory has the largest coverage. It is a major
Celsius to 25’0degree celsium from April and tributary of the Pasig River. It begins as La Mesa
May and 22’0 degree Celsius to December and Dam then officially takes San Juan name when it
January. meets with Mariblo Creek in Quezon City.
Second, the Tullahan River covers the next
SOIL DESCRIPTION largest area at 34% of the City. 28 kilometers of
Quezon City’s has a prevalent tuff layer. Quezon creeks acts as tributaries to this 12 kilometer
city have soils with high bearing capacities at main waterway. Third, is the Marikina River that
shallow depths. It is recommended to place on covers the city’s territory for 15%. Of 9%
foundations so it has more capable of carrying kilometers of Marikina River serves as the city’s
loads that are suited for shallow depths. natural boundary into which 25 kilometers of
creeks and canals directly flow. Fourth, is the
UTILITIES Meycauayan River, it is a 5.11 kilometer and
POWER SUPPLY serves 3% of the city’s territory.
Manila electric company (MERALCO) serves as
the main power supply for the city of Quezon PROPERTY LAND USE & ZONING
City. The three transmission line coming from the The full map of Quezon City is dominated by
North Luzon and South Luzon pass within the different types of Land Use and Zoning. In 2009,
city. Quezon City has twelve (12) MERALCO changes in residential development increased
sub-stations. with the opening of new subdivisions in District II
and in some particulary area in Quezon City.
WATER SUPPLY Some notable changes is the deterioration of
Quezon City is provided by two concessionaires some of the city’s old residential area located in
of the Metropolitan Waterworks and Sewerage Galas, Laloma and Project 4. Second, the
System (MWSS). commercial land use, some commercial
Quezon city’s north and west parts are within the establishment have the tendency to locate in
concession area of Maynilad Water Services, Inc. residential concentrations. Some particular part in
while the southeast is under the Manila Water Quezon city area such as Cubao could be
Co., Inc., considered a more prominent in commercial node
Some of the older residential communities are in the City. The commercial development in the
mostly developed by then the PHHC (now NHA) city increase it’s land use share from 5.93% in
are: Roxas District, Quirino 2 and 3, project 4, 6, year 2003 to 6.26% in 2009. Third, the Industrial
and 7, Malaya Housing project (UP Village, land use, it was observed that from 1995-2000,
Teachers Village, Central, Pinyahan and there is a decreased in industrial development in
Sikatuna village) GSIS Village, Congressional the city due to the national policy on dispersion of
Village, South Triangle, Kamuning, Heroes Hill, big industries to areas outside Metro Manila.
and Philam Subdivision. Industrial development in Balintawak area will
But some particular of Quezon City are not yet however continue for some more time due to the
covered by the supply of Maynilad, these are: several major roads that links to the seaport.
Payatas, Holy Spirit, North Fairview and in
Kaligayahan. C. MICRO SITE ANALYSIS: THE SITE AND ITS
IMMEDIATE ENVIRONS
DRAINAGE SYSTEM
THE SITE
The site is located beside at Arboretum Forest of a designer to manipulate it’s design concept. And
Diliman, Quezon City. The site has approximately to use and maximize the spaces needed for the
4.2 hectares fronting Central Avenue Road. The proposal.
site has an existing hospitals/medicals nearby
and institutionals. The site can be easily SWOT ANALYSIS
accessed by PUVs, private Vehicles, PUBs and One of the most important when analyzing a site
Tricycles. condition is the S.W.O.T Analysis. It helps what is
more needed and the strength of the project site,
SITE ANALYSIS to address what is the lacking and what are to
SUN AND WIND PATH ANALYSIS minimize.
Quezon City has an average wind speed of 7.5 The strength of the site is very accessible to all
miles per hour. The windiest day of the year is types of vehicle. And the site has low terrain
December 18 with an average hourly wind speed slope that can be easily to manipulate design.
of 9.5 miles per hour. The calmest day of the And the site is nearby to the residentials,
year is May 31, with an average hourly wind commercials and the like so people can easily
speed of 5.5 miles per hour. The predominant access to the site.
average hourly wind direction in quezon city The weakness of the site is that the site is
varies throughout the year. The wind is most vulnerable to natural hazard because the site
often from the west for 4.0 months from may to location is 5 kilometers away to the west valley
September. The wind is most often from the east fault line in Marikina. And since the site is fronting
for 8.0 months from September to may. central avenue road, the site is more prone to
The Quezon city during December to January is activity surrounding noise and vehicle noise.
a moderately hot winter with an average The opportunity of the site is that the site is
temperature ranging between min 22.9 degree nearby to the other research institutional and it
Celsius and maximum of 28.3 degree Celsius. can be a great opportunity for the medical
January is the coldest month due to the northeast students.
monsoon coming from the Siberia. The threats of the site location is that the
proposal is nears to the health care building and
ACTIVITY AND NOISE can increase the competition with other health
The site is surrounded mostly by residentials, care providers. And since the site is intended for
commercials and institutionals. it is expected that open space & parks, the site is beside to the
the activity noise and natural noise coming from protected forests of the Philippines.
the arboretum forest. And the two red dot in the
major road showing the vehicular noise and D. INITIAL SITE SCHEMATIC DIAGRAM
traffic noise. The site is beside at the Arboretum The initial schematic design for the site is based
Forest, the vegetation of the forest can help to on the design guidelines of the Department of
reduce the noise and to clean the air of dust and health, and also planning & circulation for the
other pollutants. surrounding to the proposed site tertiary health care.
project. The zoning will be divided into three buildings,
the main hospital with 700-bed and the
SITE PHOTO administration offices. The next building will be
The current for the proposed site project is still for the medical teaching for the medical students.
subject in proposal for the future development of And the next building will be for the research
Philippine General Hospital. The site is clearly institutional to focus on research initiatives that
has a lot of vegetation within the inside. Since the impact on national health policies. And the
slope is flat in terrain, it will be a big advantage to utilities building will be for maintenance and STP.