You are on page 1of 9

SHIFT REPORT (Corrective / Job Request / Projects)

DATE:March 3, 2021
TIME: 8am - 5pm
Eng'r Supervisor :

STAFF ON DUTY:
Technician : Carpenter: n/a
Plumber: n/a Painter: n/a

EQUIPMENTS STATUS:

ENGINEERING DEPARTMENT REPAIR & MAINTENANCE GUEST SERVICE CALLS (FROM ESCAP & LOGBOOK REQUEST) OTHER DEPT. SERVICE CALLS (INCLUDING SPECIAL PROJECTS JOB REQUEST) DURATION TIME
ACCOM - PLISHED BY
QTY WORK SCOPE REMARKS RM. NO. WORK SCOPE REMARKS DEPARTMENT QTY WORK SCOPE REMARKS START END
A.) ELECTRICAL WORKS (relamping, wiring works i.e.)

B.) MECHANICAL WORKS (ACU, L&K, STP, plumbing i.e.)

C.) CIVIL WORKS (painting, carpentry, masonry, i.e.)

D.) AUDIO VIDEO WORKS

E.)TELEPHONE WORKS

F.)OTHER CONCERNS
ENDORSEMENT:

Electricity (kwhr) Present Previous Consumption


Main 0
Laundry 0
Main Kitchen 0
ADD 0

LPG Present Previous Consumption


Main 0
B1 0
B2 0
LP 0

Water (cu.m) Present Previous Consumption


Hotel (Main) 0
Kitchen (Main) 0
Laundry 0

Checked by: Noted by:

________________
Eng'r Supervisor CHIEF ENGR.
SHIFT REPORT (Corrective / Job Request / Projects)
DATE:April 13, 2021
TIME: 7am - 7pm
Eng'r Supervisor : Hagie Santillan

STAFF ON DUTY:
Technician : Ritchie / Manuel Carpenter: Demie and Demie
Plumber: Rey Painter: Tony and Glenn

EQUIPMENTS STATUS:
Chiller no. 2 - ON
Cooling tower no. 2 - ON
Boiler - Off
Heat pump no. 3 / water heater no. 2 -ON

ENGINEERING DEPARTMENT REPAIR & MAINTENANCE GUEST SERVICE CALLS (FROM ESCAP & LOGBOOK REQUEST) OTHER DEPT. SERVICE CALLS (INCLUDING SPECIAL PROJECTS JOB REQUEST) DURATION TIME
ACCOM - PLISHED BY
QTY WORK SCOPE REMARKS RM. NO. WORK SCOPE REMARKS DEPARTMENT QTY WORK SCOPE REMARKS START END
A.) ELECTRICAL WORKS (relamping, wiring works i.e.)
Ritchie and Manuel Continue intalled
Ritchie and manuel
adaptor plug at Vacant room. Ongoing
Ritchie continue pullout outlet shutter
Ongoing Ritchie
at bvacnt room.
B.) MECHANICAL WORKS (ACU, L&K, STP, plumbing i.e.)
Replaced lowbat maindoor
Room 815
lockset. Hagie
Room 1009 "
Volt cut luggage
Guest in " Ritchie
Room 911 " Guest
Reset main breaker tripped
- in " Hagie
Insulation of primary fcu drain
Room 1033
line
Rey
Room 842 Fixed tissue holder detouched
Room 725 Declogged bowl slow drain.
Declogged 2 urinal at male locker DONE
Rey
Replaced defective bidet at male locker DONE

Fixed detached rubber coupler at 9th


DONE Rey
floor pipe chase no. 2.

C.) CIVIL WORKS (painting, carpentry, masonry, i.e.)


Room 842 Fixed loosed tissue holder Done
Regrout tiles under vanity and Tony
Room 1024 retouch bath room ceiling DONE
Room 1024 Installed detached vanity fitting. Rey
Continue repainting of ramp way at 2nd
DONE
floor going engg. Glenn
Rectification of ceiling at room 1023
Ongoing
and 1024 Demie
Ritchie,Heldie,Ritchie
Trransfer oven at pastry DONE
and demie
Rectify door jam at pastry DONE Demie

D.) AUDIO VIDEO WORKS

E.)TELEPHONE WORKS

F.)OTHER CONCERNS
Turn off heat pump no. and on heat
pump no. 3
Assist trisys to refocus cctv camera of
PE3 and PE4.
BRHL continue testing of fcu unit at hk
pantry at service lift landing.

ENDORSEMENT:
kindly monitor major equipment
Kindly pullout one unit lighting fixture and replaced gypsume board at cafeteria and install power outlet at ground service lift landing " IRD room"
Kindly pulout out let shutter at laundry office.

Electricity (kwhr) Present Previous Consumption


Main 0
Laundry 0
Main Kitchen 0
ADD 0

LPG Present Previous Consumption


Main 0
B1 0
B2 0
LP 0

Water (cu.m) Present Previous Consumption


Hotel (Main) 0
Kitchen (Main) 0
Laundry 0

Checked by: Noted by:

________________
Eng'r Supervisor CHIEF ENGR.
SHIFT REPORT (Corrective / Job Request / Projects)
DATE:March 3, 2021
TIME: 3pm - 11pm
Eng'r Supervisor :

STAFF ON DUTY:
Technician : Carpenter: n/a
Plumber: n/a Painter: n/a

EQUIPMENTS STATUS:

ENGINEERING DEPARTMENT REPAIR & MAINTENANCE GUEST SERVICE CALLS (FROM ESCAP & LOGBOOK REQUEST) OTHER DEPT. SERVICE CALLS (INCLUDING SPECIAL PROJECTS JOB REQUEST) DURATION TIME
ACCOM - PLISHED BY
QTY WORK SCOPE REMARKS RM. NO. WORK SCOPE REMARKS DEPARTMENT QTY WORK SCOPE REMARKS START END
A.) ELECTRICAL WORKS (relamping, wiring works i.e.)

B.) MECHANICAL WORKS (ACU, L&K, STP, plumbing i.e.)

C.) CIVIL WORKS (painting, carpentry, masonry, i.e.)

D.) AUDIO VIDEO WORKS

E.)TELEPHONE WORKS

F.)OTHER CONCERNS
ENDORSEMENT:

Electricity (kwhr) Present Previous Consumption


Main 0
Laundry 0
Main Kitchen 0
ADD 0

LPG Present Previous Consumption


Main 0
B1 0
B2 0
LP 0

Water (cu.m) Present Previous Consumption


Hotel (Main) 0
Kitchen (Main) 0
Laundry 0

Checked by: Noted by:

________________
Eng'r Supervisor CHIEF ENGR.
SHIFT REPORT (Corrective / Job Request / Projects)
DATE:April 14, 2021
TIME: 7pm - 7am
Eng'r Supervisor : CJ Jamillo

STAFF ON DUTY:
Technician : Manny (PM)/ Dave (GY) Carpenter: n/a
Plumber: n/a Painter: n/a

EQUIPMENTS STATUS:
Boiler on
Heater 2/Heat pump 3 on
Chiller on
1 cooling tower

ENGINEERING DEPARTMENT REPAIR & MAINTENANCE GUEST SERVICE CALLS (FROM ESCAP & LOGBOOK REQUEST) OTHER DEPT. SERVICE CALLS (INCLUDING SPECIAL PROJECTS JOB REQUEST) DURATION TIME
ACCOM - PLISHED BY
QTY WORK SCOPE REMARKS RM. NO. WORK SCOPE REMARKS DEPARTMENT QTY WORK SCOPE REMARKS START END
A.) ELECTRICAL WORKS (relamping, wiring works i.e.)
746 busted vanity light
825 malfunctioning thermostat
IRD GF outlet and lighting installation for continuation
laundry office removal of outlet shutter

701, 703, 705,


709-719, 721, 723,
installation of kettle adaptor
724, 726, 728,
vacant rooms
730, 731, 733,
735, 737, 739

B.) MECHANICAL WORKS (ACU, L&K, STP, plumbing i.e.)


947 clogged AC

C.) CIVIL WORKS (painting, carpentry, masonry, i.e.)


Dismantling of cafeteria lighting and Pantry ceiling for
replace acoustic from pantry area replacement
Continuation of door restoration and
done
installation at pastry area

D.) AUDIO VIDEO WORKS

E.)TELEPHONE WORKS
F.)OTHER CONCERNS
Monitoring of equipment: Chiller, CT,
OHWT, CT Make up water tank, Heat
pump/Heater
no guest
Turn off Chiller 3 at 1am-4am complain
recorded
Turn off Heat Pump #3 at 10pm, On at
5AM
Utilities Reading

ENDORSEMENT:
1. Please install T bracket for lighting panel at IRD.
2. Please continue works at IRD GF
3. Room 825 (vacant) with defective thermostat for replacement
4. Room 911 tripping of AC circuit breaker. Electromech problem. Room transferred. For further testing.

Electricity (kwhr) Present Previous Consumption


Main 193 193
Laundry 253 253
Main Kitchen 990 990
ADD 169 169

LPG Present Previous Consumption


Main 0
B1 0
B2 0
LP 0

Water (cu.m) Present Previous Consumption


Hotel (Main) 21272.3 21272.3
Kitchen (Main) 56 56
Laundry 0

Checked by: Noted by:

CJ Jamillo ________________
Eng'r Supervisor CHIEF ENGR.

You might also like