You are on page 1of 186

STANDARD OPERATING PROCEDURES

Form No.: EHSMSM/446/4013 Form Rev. No.: 01 Effective date: 01/04/2009

SOP No. HBF/PSP-MECH/01/SOP-GCP-29 Effective Date 27/07/2020 REVISION No 2.02


SOP DESCRIPTION TRT OVERHAULING & MAINTENANCE Section MECH. / GCP
DEPARTMENT H BLAST FURNACE Page 1 to 188

Step Activity Associated Responsibility Process / tools / PPEs (HOW)


Remarks / Reference
No. (WHAT) Requirements/Hazards/Impacts (WHO)
JOB IS MENTION DAY
BY DAY GIVEN IN
SAFETY: NO IMPACT TSL AUTHORIZ E
A) TOOL BOX MEETING MUST BE DONE. MANUAL, IT WILL DONE
B) RAISE PERMIT TO WORK IN FORM MAY DELAY OR EARLIER
CLEARENCE & ENVIRONM ENT: NO IMPACT PERSON/
1 WORK PERMIT QUALITY: CLEARNACE FORM CONTRA CTOR
EHSMSM/WORKS/446/4007 AS WELL AS.
C) RAISE GAS CLEARENCE IN FORM
PROPERLY FILLED UP SUPERVISOR

O P EHSMSM/WORKS/446/4001 WORK PERMIT TAKE AND


RETURN PER DAY
BASIS.

SAFETY: FALLING HAZARD,

d S A)
B)
C)
CLOSE TEV.
CLOSE BUTTER FLY VALVE BEFORE GV # 004.
CLOSE GV # 004 AND GV # 005.

i
FINGER INJURY TSL AUTHORIZ E IT IS WORK OF MORE

l
PRE-WORK D) OPEN VENT VAVLE. THEN 1 DAY.
ENVIRONM ENT: GASEOUS, NOISY, PERSON/
2

a
BEFORE TRT E) N2 PURGING DONE.
DUSTY. CONTRA CTOR
ISOLATION. F) CLOSE ALL WATER LINE VALVE & ALL GCTK THESE JOBS DONE ONLY
QUALITY: MUST BE DONE AS PER SUPERVISOR IN SHUT DOWN DURATION.

V
LEVEL ZERO.
DOCUMENTS.
G) OIL EMERGENCY TANK MUST BE TAKE LEVEL
ZERO.
SAFETY: FALLING HAZARD,
FINGER INJURY TSL AUTHORIZ E
A) POSITIV E ISOLATION TO BE DONE AND KEEP
POSITIV E ENVIRONM ENT: GASEOUS, NOISY, PERSON/ ESI ANNEXURE
3 ISOLATION AND DUSTY. CONTRA CTOR
KEY IN PROPER POSITION.
ATTACHED
B) REFFER ESI DOUCUMENT OF DEPT
QUALITY: FORM PROPERLY FILLED SUPERVISOR
UP

O P
Name and Design –
PREPARED BY
NIRANJAN D. HONAP, Jr.Engg.
APPROVED BY
Name and Design—SUMIT RANJAN, MANAGER

d S
Signature with Date

Printed By -NIRANJAN HONAP(161030) Print valid till - 27-Aug-2020


Signature with Date

Printed on - 17-Aug-2020
a l i
SOP Valid Till - 27-Jul-2021
SAFETY: SLIP, TRIP AND FALLING
TSL AUTHORIZ E
HAZARD, FINGER INJURY OVER HAULING DONE AS PER MANUAL
START THE PERSON/
4. OVER HAULING
ENVIRONM ENT: NOISY, DUSTY.
CONTRA CTOR ATTACHED.
QUALITY: FORM PROPERLY FILLED
SUPERVISOR
UP
SAFETY: SLIP, TRIP AND FALLING
HAZARD, TSL AUTHORIZ E
FINGER INJURY PERSON/ AFTER OVER HAULING EACH PART MUST BE TRAIL
5. TRAIL TAKEN
ENVIRONM ENT: NOISY, DUSTY. CONTRA CTOR TAKEN.
QUALITY: FORM PROPERLY FILLED SUPERVISOR
UP
SAFETY: FALLING HAZARD, 1. FILL GCTK TANKS WITH WATER. ENSURE NO GAS
FINGER INJURY TSL AUTHORIZ E 2. CLOSE VENT VALVE. LEAKAGE, IF HAS
WORK AFTER
ENVIRONM ENT: GASEOUS, NOISY, PERSON/ 3. OPEN GV # 004 AND GV # 005. ARREST IT.
6. OVER
AND DUSTY. CONTRA CTOR 4. OPEN ALL WATER LINE VALVE. THIS JOB DONE IN
HAULING.
QUALITY: MUST BE DONE AS PER SUPERVISOR 5. OPEN BUTTER FLY VALVE BEFORE GV # 004. ONLY SHUT DOWN
DOCUMENTS. 6. TURBINE GEAR MOTOR ENGAUGE. CONDITION.
SAFETY: NO IMPACT TSL AUTHORIZ E
7. RETURN WORK ENVIRONM ENT: NO IMPACT
PERMIT QUALITY: FORM PROPERLY FILLED
UP
PERSON/
CONTRA CTOR
SUPERVISOR

O P RETURN WORK PERMIT IN FORM


EHSMSM/WORKS/446/4001
ENSURE NO MAN POWER
THERE.

ESI ANNEXURE
ESI DOCUMENT REFERANCE NO: HBF/PSP-MECH/01/PI/ESI.00

d S
Department – H Blast Furnace (Mechanical)
Section - GCP & WWTP

a l i 1 T

Sl.
Equipment
Details

Name
EQUIP
No
Energy source
E
L
E
G
F
L
O
T
V
Type of job
Electrical
Isolation details of Energy sources & Location of Isolation Locks

Gas Fluid
Others (Gravitational / Potential /
Locomotive / EOT crane etc.)

No C Valve / Pump /
A U H
TI Panel U – Seal Valve
S I E Method Method Method Method Location
C no / Flange Location &

P
D R
A No. No.
L

Name and Design –


PREPARED BY APPROVED BY
S O
Signature with Date
NIRANJAN D. HONAP, Jr.Engg. Name and Design—SUMIT RANJAN, MANAGER
Signature with Date

l i d
Printed By -NIRANJAN HONAP(161030) Print valid till - 27-Aug-2020 Printed on - 17-Aug-2020
a SOP Valid Till - 27-Jul-2021
CONTENTS

• MECHANICAL ACTIVITIES------------------------------------------------------------------------ 04
• DAY01 ---------------------------------------------------------------------------------04
• DAY02----------------------------------------------------------------------------------------------- 12
• DAY03 ---------------------------------------------------------------------------------24
• DAY04 ---------------------------------------------------------------------------------37
• DAY05 ---------------------------------------------------------------------------------50

O P
• DAY06 ---------------------------------------------------------------------------------64
• DAY07----------------------------------------------------------------------------------------------- 74
S
• DAY08 ---------------------------------------------------------------------------------86
d
l i
• DAY09 ---------------------------------------------------------------------------------94
a
• DAY10 ---------------------------------------------------------------------------------105
V
• DAY11 ---------------------------------------------------------------------------------120
• DAY12----------------------------------------------------------------------------------------------- 133
• DAY13 ---------------------------------------------------------------------------------146
• DAY14 ---------------------------------------------------------------------------------158
• DAY15 ---------------------------------------------------------------------------------170
O P
• ELECTRICAL ACTIVITIES --------------------------------------------------------------------- 174
d S
Printed By -NIRANJAN HONAP(161030) Print valid till - 27-Aug-2020 Printed on - 17-Aug-2020
a l i 3
SOP Valid Till - 27-Jul-2021
TRT JOB
DAY1
STEP1 : CLOSING OF GV 04(IGV) & GV 05 (OGV)

O P
d S
a l i
V

O P
FIG. LOCAL CONTROL AND ACTUATOR
d S
Printed By -NIRANJAN HONAP(161030) Print valid till - 27-Aug-2020 Printed on - 17-Aug-2020
a l i 4
SOP Valid Till - 27-Jul-2021
STEP 2 : VENTING OF TRAPPED GAS WAS DONE AND THEN NITROGEN PURGING LINE
WAS OPENNED

O P
d S
a l i
V

O P
ROOT N2 LINE VALVE
d S
Printed By -NIRANJAN HONAP(161030) Print valid till - 27-Aug-2020 Printed on - 17-Aug-2020
a l i 5
SOP Valid Till - 27-Jul-2021
STEP 3 POSITIVE ISOLATION DONE AND KEYS ARE KEPT IN ISOLATION BOX

O P
d S
a l i
V

O P
d S
Printed By -NIRANJAN HONAP(161030) Print valid till - 27-Aug-2020 Printed on - 17-Aug-2020
a l i 6
SOP Valid Till - 27-Jul-2021
STEP 4 :CO PPM WAS CHECKED THROUGH INTRUMENT PROTECTION BOX

O P
d S
a l i
V

O P
d S
Printed By -NIRANJAN HONAP(161030) Print valid till - 27-Aug-2020 Printed on - 17-Aug-2020
a l i 8
SOP Valid Till - 27-Jul-2021
STEP 5 : COVER BOLTS WERE NUMBERED IN ORDER TO AVOID MISMATCH IN LATER
STAGES

O P
d S
a l i
V

O P
d S
Printed By -NIRANJAN HONAP(161030) Print valid till - 27-Aug-2020 Printed on - 17-Aug-2020
a l i 9
SOP Valid Till - 27-Jul-2021
STEP 6: LOOSENING OF BOLTS (SPANNER SIZES USED : 65 & 75)

O P
d S
a l i
V

O P
d S
Printed By -NIRANJAN HONAP(161030) Print valid till - 27-Aug-2020 Printed on - 17-Aug-2020
a l i 1
SOP Valid Till - 27-Jul-20210
STEP 7 : PLATFORM GIVEN TO APPROACH TURNING MOTOR WAS SHIFTED WITH
THE HELP OF CHAIN BLOCK SYSTEM (EOT CRANE)

O P
d S
a l i
V

O P
d S
Printed By -NIRANJAN HONAP(161030) Print valid till - 27-Aug-2020 Printed on - 17-Aug-2020
a l i 1
SOP Valid Till - 27-Jul-20211
TRT JOB
DAY2
O P
d S
a l i
V

O P
d S
Printed By -NIRANJAN HONAP(161030) Print valid till - 27-Aug-2020 Printed on - 17-Aug-2020
a l i 1
SOP Valid Till - 27-Jul-20212
STEP 8 : OPENNING OF FLANGE OF VENT & N2 PURGING LINE

O P
d S
a l i
V

O P
FIG: VENT LINE AND N2 PURGING LINE
d S
Printed By -NIRANJAN HONAP(161030) Print valid till - 27-Aug-2020 Printed on - 17-Aug-2020
a l i 1
SOP Valid Till - 27-Jul-20213
STEP 9: DISMANTLING /SHIFTING OF VENT AND N2 PIPELINES WITH HELP OF CHAIN
BLOCK (EOT CRANE)

O P
d S
a l i
V

O P
d S
Printed By -NIRANJAN HONAP(161030) Print valid till - 27-Aug-2020 Printed on - 17-Aug-2020
a l i
SOP Valid Till - 27-Jul-2021
STEP 10 : CLOSING OF HYD LUBE OIL LINE VALVES USING HANDLE

O P
d S
a l i
V

O P
d S
Printed By -NIRANJAN HONAP(161030) Print valid till - 27-Aug-2020 Printed on - 17-Aug-2020
a l i 15
SOP Valid Till - 27-Jul-2021
STEP 11 :PLACING OF GUIDE COLUMNS IN TURBINE CASING ( TO AVOID MISMATCH OF
TOP COVER AND BOTTOM PART OF CASING

O P
d S
a l i
V

O P
d S
Printed By -NIRANJAN HONAP(161030) Print valid till - 27-Aug-2020 Printed on - 17-Aug-2020
a l i 16
SOP Valid Till - 27-Jul-2021
STEP 12 : DISMANTLING OF ALL LOOSENED BOLTS OF TURBINE CASING

O P
d S
a l i
V

O P
d S
Printed By -NIRANJAN HONAP(161030) Print valid till - 27-Aug-2020 Printed on - 17-Aug-2020
a l i 17
SOP Valid Till - 27-Jul-2021
STEP 13: DISMANTLING OF DOWEL PINS (4 No.s) (SPANNER SIZE USED :85)

O P
d S
a l i
V

O P
d S
Printed By -NIRANJAN HONAP(161030) Print valid till - 27-Aug-2020 Printed on - 17-Aug-2020
a l i 18
SOP Valid Till - 27-Jul-2021
STEP 14: OPENNING OF COUPLING
GUARD

O P
d S
a l i
V

O P
d S
(SPANNER SIZE:18/19)
Printed By -NIRANJAN HONAP(161030) Print valid till - 27-Aug-2020 Printed on - 17-Aug-2020
a l i
SOP Valid Till - 27-Jul-2021
STEP 14: OPENNING OF COUPLING
GUARD

O P
d S
a l i
V

O P
d S
Printed By -NIRANJAN HONAP(161030) Print valid till - 27-Aug-2020 Printed on - 17-Aug-2020
a l i
SOP Valid Till - 27-Jul-2021
STEP 15: DISMANTLING OF TURNING GEAR MOTOR (SPANNER SIZE:36 (4 jack No.s) &
ALLEN KEY 27 )

O P
d S
a l i
V

O P
d S
Printed By -NIRANJAN HONAP(161030) Print valid till - 27-Aug-2020 Printed on - 17-Aug-2020
a l i 20
SOP Valid Till - 27-Jul-2021
STEP 16:CARBON SEAL DISMANTLING

O P
d S
a l i
V

O P
CARBON SEAL CASE LNG 10MM (4 No.S) (SLOW REMOVAL REQD.)
d S
Printed By -NIRANJAN HONAP(161030) Print valid till - 27-Aug-2020 Printed on - 17-Aug-2020
a l i 21
SOP Valid Till - 27-Jul-2021
STEP 16: CONTD..

O P
d S
a l i
V

O P
CARBON SEAL IN POSITION (4No.s)
TOP: 2 SPLITS OF CARBON SEAL
BOTTOM: SPRING WHICH HOLDS
d S
Printed By -NIRANJAN HONAP(161030) Print valid till - 27-Aug-2020
4 SPLITS TO FORM RING
Printed on - 17-Aug-2020
a
22
l i
SOP Valid Till - 27-Jul-2021
STEP 17 : JACKING BOLTS(6No.s) WERE INSERTED AND TOP COVER WAS JACKED UP
(SPANNER SIZE 85)

O P
d S
a l i
V

O P
d S
Printed By -NIRANJAN HONAP(161030) Print valid till - 27-Aug-2020 Printed on - 17-Aug-2020
a l i 23
SOP Valid Till - 27-Jul-2021
TRT JOB
DAY3
O P
d S
a l i
V

O P
d S
Printed By -NIRANJAN HONAP(161030) Print valid till - 27-Aug-2020 Printed on - 17-Aug-2020
a l i 24
SOP Valid Till - 27-Jul-2021
Step 18:Chain block arrangements were made to lift the cover

O P
d S
a l i
V

O P
d S
Printed By -NIRANJAN HONAP(161030) Print valid till - 27-Aug-2020 Printed on - 17-Aug-2020
a l i 25
SOP Valid Till - 27-Jul-2021
STEP 19: SHIFTING OF TOP COVER (BOTH SIDE EQUAL LIFTING HAVE TO BE ACHIEVED
THROUGH CHAIN BLOCKS ADJUSTMENTS)

O P
d S
a l i
V

O P
d S
Printed By -NIRANJAN HONAP(161030) Print valid till - 27-Aug-2020 Printed on - 17-Aug-2020
a l i 26
SOP Valid Till - 27-Jul-2021
STEP 20: PLACING OF TOP COVER OVER WOODEN SUPPORT

O P
d S
a l i
V

O P
d S
Printed By -NIRANJAN HONAP(161030) Print valid till - 27-Aug-2020 Printed on - 17-Aug-2020
a l i 27
SOP Valid Till - 27-Jul-2021
STEP21: MEASUREMENTS OF CLEARANCES AS PER DESIGN

O P
d S
a l i
V

O P
d S
Printed By -NIRANJAN HONAP(161030) Print valid till - 27-Aug-2020 Printed on - 17-Aug-2020
a l i 28
SOP Valid Till - 27-Jul-2021
Step 22: PLACING SHEETS OVER THE INLET AND OUTLET .

O P
d S
a l i
V

O P
d S
Printed By -NIRANJAN HONAP(161030) Print valid till - 27-Aug-2020 Printed on - 17-Aug-2020
a l i 29
SOP Valid Till - 27-Jul-2021
STEP 23:HYD. VALVES WERE OPENED AND HYD.PUMP WAS STARTED IN ORDER TO
TAKE TRIAL OF SERVO MOTOR (FOR STATOR BLADE POSITIONING)

O P
d S
a l i
V

O P
d S
Printed By -NIRANJAN HONAP(161030) Print valid till - 27-Aug-2020 Printed on - 17-Aug-2020
a l i 30
SOP Valid Till - 27-Jul-2021
STEP 24: SERVO MOTOR WAS OPERATED AND GRADUAL READING WERE NOTED

SCALE

O P
d S
a l i
V

O P
d S
Printed By -NIRANJAN HONAP(161030) Print valid till - 27-Aug-2020 Printed on - 17-Aug-2020
a l i 31
SOP Valid Till - 27-Jul-2021
VIEW OF TURBINE STARTOR BLADE WITH LINK ARRANGEMENT TO SHIELD

O P
d S
a l i
V

O P
d S
Printed By -NIRANJAN HONAP(161030) Print valid till - 27-Aug-2020 Printed on - 17-Aug-2020
a l i 32
SOP Valid Till - 27-Jul-2021
TSB POSITIONING BY SERVO MOTOR

O P
d S
a l i
V

O P
d S
Printed By -NIRANJAN HONAP(161030) Print valid till - 27-Aug-2020 Printed on - 17-Aug-2020
a l i
SOP Valid Till - 27-Jul-2021
STEP25: STATOR BLADES WERE INSPECTED IN CLOSED AND FULLY OPENED CONDITION

O P
d S
a l i
V
FOUND: 7mm
DESIGN: 0.15 - 0.3mm
O P
CLOSED STATE CLEARANCE MEASUREMENT BETWEEN STATOR BLADES (BY FEELER GUAGE)
d S
Printed By -NIRANJAN HONAP(161030) Print valid till - 27-Aug-2020 Printed on - 17-Aug-2020
a l i 34
SOP Valid Till - 27-Jul-2021
STEP25 : CONTD..

O P
d S
a l i
V
DUST ACCUMULATION ON BLADES
O P
d S
Printed By -NIRANJAN HONAP(161030) Print valid till - 27-Aug-2020 Printed on - 17-Aug-2020
a l i 35
SOP Valid Till - 27-Jul-2021
STEP 26: CLEANING OF BLADES WAS DONE

O P
d S
a l i
V

O P
d S
Printed By -NIRANJAN HONAP(161030) Print valid till - 27-Aug-2020 Printed on - 17-Aug-2020
a l i 36
SOP Valid Till - 27-Jul-2021
TRT JOB
DAY4
O P
d S
a l i
V

O P
d S
Printed By -NIRANJAN HONAP(161030) Print valid till - 27-Aug-2020 Printed on - 17-Aug-2020
a l i 37
SOP Valid Till - 27-Jul-2021
Step 27: FRONT BEARING COVER WAS OPENED & PLACED ON WOODEN SUPPORT
SPANNER USED : 36 (4 No.s JACK ) & ALLEN KEY 27

O P
d S
a l i
V

O P
d S
Printed By -NIRANJAN HONAP(161030) Print valid till - 27-Aug-2020 Printed on - 17-Aug-2020
a l i 38
SOP Valid Till - 27-Jul-2021
COUPLING at Main oil Pump

O P
d S
a l i
V

O P
d S
Printed By -NIRANJAN HONAP(161030) Print valid till - 27-Aug-2020 Printed on - 17-Aug-2020
a l i 39
SOP Valid Till - 27-Jul-2021
STEP28: TURBINE STATOR WAS SET TO FULLY OPEN FOR DISMANTLING OF MOVABLE
TOP CASE (SPANNER USED : 32/30)

O P
d S
a l i
V

O P
d S
Printed By -NIRANJAN HONAP(161030) Print valid till - 27-Aug-2020 Printed on - 17-Aug-2020
a l i 40
SOP Valid Till - 27-Jul-2021
STEP 28:CONTD.

O P
d S
a l i
V

O P
d S
Printed By -NIRANJAN HONAP(161030) Print valid till - 27-Aug-2020 Printed on - 17-Aug-2020
a l i 41
SOP Valid Till - 27-Jul-2021
VIEW OF MOVABLE TURBINE CASE & LINKS OF STATOR BLADES AFTER DISMANTLING

O P
d S
a l i
V

O P
d S
Printed By -NIRANJAN HONAP(161030) Print valid till - 27-Aug-2020 Printed on - 17-Aug-2020
a l i 42
SOP Valid Till - 27-Jul-2021
STEP 29: DISMANTLING OF SPEED SENSOR (SPANNER USED ALLEN KEY 8)

O P
d S
a l i
V

O P
d S
Printed By -NIRANJAN HONAP(161030) Print valid till - 27-Aug-2020 Printed on - 17-Aug-2020
a l i 43
SOP Valid Till - 27-Jul-2021
Step 30: Dismantling of OIL SEAL (Allen Key 16 used)

O P
d S
a l i
V

O P
d S
Printed By -NIRANJAN HONAP(161030) Print valid till - 27-Aug-2020 Printed on - 17-Aug-2020
a l i
SOP Valid Till - 27-Jul-2021
STEP 31: JOURNAL BEARING DISMANTLED FROM BOTH THE SIDES
(SPANNERS USED 65 & allen key 16)

O P
d S
a l i
V
EYE BOLT FIXING IN JOURNAL BEARING CASE
O P
d S
Printed By -NIRANJAN HONAP(161030) Print valid till - 27-Aug-2020 Printed on - 17-Aug-2020
a l i 45
SOP Valid Till - 27-Jul-2021
STEP 31 :contd..

O P
d S
a l i
V

O P
d S
Printed By -NIRANJAN HONAP(161030) Print valid till - 27-Aug-2020 Printed on - 17-Aug-2020
a l i 46
SOP Valid Till - 27-Jul-2021
STEP32: DISMANTLING OF TURNING GEAR BOLTS (BOX SPANNER :60)

O P
d S
a l i
V

O P
d S
Printed By -NIRANJAN HONAP(161030) Print valid till - 27-Aug-2020 Printed on - 17-Aug-2020
a l i 47
SOP Valid Till - 27-Jul-2021
MANUAL ROTATION OF TURNING GEAR IN ORDER TO DISMANTLE THE OTHER HALF
OF TURNING GEAR VIA SLING +HOOK(EOT CRANE)

O P
d S
a l i
V

O P
d S
Printed By -NIRANJAN HONAP(161030) Print valid till - 27-Aug-2020 Printed on - 17-Aug-2020
a l i 48
SOP Valid Till - 27-Jul-2021
Side jobs done

❖ Cleaning of all covers dismantled done

O P
d S
a l i
V
❖ Dismantling of shed guards and placing of Rotor Stand

O P
d S
Printed By -NIRANJAN HONAP(161030) Print valid till - 27-Aug-2020 Printed on - 17-Aug-2020
a l i 49
SOP Valid Till - 27-Jul-2021
TRT JOB
DAY5
O P
d S
a l i
V

O P
d S
Printed By -NIRANJAN HONAP(161030) Print valid till - 27-Aug-2020 Printed on - 17-Aug-2020
a l i 50
SOP Valid Till - 27-Jul-2021
STEP 33: DISMANTLING OF STATIONARY TOP CASING (USING HEX HEAD OF M22 &
SPANNER 41 & 32)

O P
d S
a l i
V

O P
d S
Printed By -NIRANJAN HONAP(161030) Print valid till - 27-Aug-2020 Printed on - 17-Aug-2020
a l i 51
SOP Valid Till - 27-Jul-2021
STEP34 : SHIFTING OF STATIONARY TOP CASING ( 2 NO.s M56 EYE BOLT USED)

O P
d S
a l i
V
EQUAL LIFTING ON BOTH SIDES IS REQD TO AVOID CONTACT BETWEEN TSB
O P
AND TRB , SET WITH THE HELP OF CHAIN BLOCK
d S
Printed By -NIRANJAN HONAP(161030) Print valid till - 27-Aug-2020 Printed on - 17-Aug-2020
a l i 52
SOP Valid Till - 27-Jul-2021
STEP 34 : CONTD..

O P
d S
a l i
V

O P
d S
Printed By -NIRANJAN HONAP(161030) Print valid till - 27-Aug-2020 Printed on - 17-Aug-2020
a l i 53
SOP Valid Till - 27-Jul-2021
SCALES ON STATOR BLADE

O P
d S
a l i
V

O P
d S
Printed By -NIRANJAN HONAP(161030) Print valid till - 27-Aug-2020 Printed on - 17-Aug-2020
a l i 54
SOP Valid Till - 27-Jul-2021
STEP 35: FLOAT OF THRUST BEARING CHECKED AND FOUND OK(0.4 mm)
(USING 2 No.s DIAL GUAGE & 1 No. 10T Hyd. Jack)

O P
d S
a l i
V
DIAL GUAGE ARRANGEMENT FOR FLOAT MEASUREMENT
O P
d S
Printed By -NIRANJAN HONAP(161030) Print valid till - 27-Aug-2020 Printed on - 17-Aug-2020
a l i 55
SOP Valid Till - 27-Jul-2021
STEP35 : CONTD..

HYD. JACK

O P
d S
THRUST BEARING
DIAL GUAGE
a l i GEAR
DIAL
V GUAGE

O P
d S
Printed By -NIRANJAN HONAP(161030) Print valid till - 27-Aug-2020 Printed on - 17-Aug-2020
a l i 56
SOP Valid Till - 27-Jul-2021
STEP 36 : DIAMANTLING OF THRUST BEARING WITH RTD PROBE

O P
d S
a l i
V

O P
d S
Printed By -NIRANJAN HONAP(161030) Print valid till - 27-Aug-2020 Printed on - 17-Aug-2020
a l i 57
SOP Valid Till - 27-Jul-2021
STEP 37: SHIFTING OF ROTOR OVER THE STAND (COULD’NT BE DONE USING TACKLE)

O P
d S
a l i GENERATOR

O P
EOT CRANE UPPER LIMIT WAS TOUCHED AND STILL THE ROTOR BLADE COULDN’T
d S
COME OVER GENERATOR HEIGHT
Printed By -NIRANJAN HONAP(161030) Print valid till - 27-Aug-2020 Printed on - 17-Aug-2020
a l i 58
SOP Valid Till - 27-Jul-2021
STEP 37 : contd. (DONE USING SLINGS AND CHAIN BLOCK)

O P
d S
a l i
V

O P
LIFTING WAS DONE SLOWLY IN ORDER TO MAINTAIN PARALLEL LIFT AT GEAR END
d S
Printed By -NIRANJAN HONAP(161030) Print valid till - 27-Aug-2020 Printed on - 17-Aug-2020
a l i 59
SOP Valid Till - 27-Jul-2021
STEP:37 CONTD.

O P
d S
a l i
V

O P
ROTOR BEING PLACED OVER STAND (WITH WOODEN SUPPORT)
d S
Printed By -NIRANJAN HONAP(161030) Print valid till - 27-Aug-2020 Printed on - 17-Aug-2020
a l i 60
SOP Valid Till - 27-Jul-2021
ROTOR BLADES

O P
d S
a l i
V

O P
d S
Printed By -NIRANJAN HONAP(161030) Print valid till - 27-Aug-2020 Printed on - 17-Aug-2020
a l i 61
SOP Valid Till - 27-Jul-2021
DUST ACCUMULATION OVER BOTTOM HALF-STATOR BLADES

O P
d S
a l i
V

O P
d S
Printed By -NIRANJAN HONAP(161030) Print valid till - 27-Aug-2020 Printed on - 17-Aug-2020
a l i 62
SOP Valid Till - 27-Jul-2021
STEP 38 : CLEANING OF LINKAGES DONE FOR FREE ROTATION OF TSB (IN PROGESS)

O P
d S
a l i
V

O P
d S
Printed By -NIRANJAN HONAP(161030) Print valid till - 27-Aug-2020 Printed on - 17-Aug-2020
a l i 63
SOP Valid Till - 27-Jul-2021
TRT JOB
DAY6
O P
d S
a l i
V

O P
d S
Printed By -NIRANJAN HONAP(161030) Print valid till - 27-Aug-2020 Printed on - 17-Aug-2020
a l i 64
SOP Valid Till - 27-Jul-2021
STEP 39: CLEANING OF JOURNAL BEARING (DISMANTLING OF BEARING PADS)
(ALLEN KEY :10 & 6 USED)

O P
d S
a l i
V

O P
d S
Printed By -NIRANJAN HONAP(161030) Print valid till - 27-Aug-2020 Printed on - 17-Aug-2020
a l i 65
SOP Valid Till - 27-Jul-2021
STEP 40 : DYE PENETRANT TEST FOR JOURNAL BEARING ( FOUND OK)

CLEANER SOLUTION WAS


APPLIED TO THE PAD SURFACE

O P
d S
a l i
PENETRAT (DYE) WAS
V
APPLIED AFTER
APPLICATION OF CLEANER
O P
d S
Printed By -NIRANJAN HONAP(161030) Print valid till - 27-Aug-2020 Printed on - 17-Aug-2020
a l i 66
SOP Valid Till - 27-Jul-2021
STEP 40: CONTD..

CLEANING OF DYE WITH CLOTH

O P
d S
a l i
ANALYSED AFTER APPLICATION
OF DEVELOPER
V

O P
d S
Printed By -NIRANJAN HONAP(161030) Print valid till - 27-Aug-2020 Printed on - 17-Aug-2020
a l i
SOP Valid Till - 27-Jul-2021
STEP 40: CONTD..

O P
d S
a l i
V

O P
DYE PENETRANT SOLUTIONS(CLEANER, DEVELOPER &PENETRANT)
d S
Printed By -NIRANJAN HONAP(161030) Print valid till - 27-Aug-2020 Printed on - 17-Aug-2020
a l i 68
SOP Valid Till - 27-Jul-2021
STEP 41: CLEANING JOBS

O P
d S
a l i
V
CLEANING OF GUIDE WAY OF TSB
CLEANING OF SCALES ON
BOTTOM HALF STATOR BLADES POSITIONING
O P
d S
Printed By -NIRANJAN HONAP(161030) Print valid till - 27-Aug-2020 Printed on - 17-Aug-2020
a l i 69
SOP Valid Till - 27-Jul-2021
STEP 41 : CONTD..

ROTOR CLEANING

O P
d S
a l i
V

O P
d S
Printed By -NIRANJAN HONAP(161030) Print valid till - 27-Aug-2020 Printed on - 17-Aug-2020
a l i 70
SOP Valid Till - 27-Jul-2021
Step 42: JACKING OF BOTTOM CASE WAS DONE USING BOX SPANNER 30 WITH
EXTENSION (2 NO.s)

O P
d S
a l i
V

O P
d S
Printed By -NIRANJAN HONAP(161030) Print valid till - 27-Aug-2020 Printed on - 17-Aug-2020
a l i 71
SOP Valid Till - 27-Jul-2021
STEP 43: 4 no.s EYEBOLTS (M56) INSERTED IN BOTTOM STATOR TO LIFT IT

O P
d S
a l i
V
LIFTING OF BOTTOM STATOR BLADES WAS INHIBITED BY JAM BETWEEN STATOR
O P
AND BOTTOM CASE
d S
Printed By -NIRANJAN HONAP(161030) Print valid till - 27-Aug-2020 Printed on - 17-Aug-2020
a l i 72
SOP Valid Till - 27-Jul-2021
STEP44 :OIL FROM BOTH BEARING SHELLS WERE TAKEN OUT

O P
d S
a l i
V

O P
d S
Printed By -NIRANJAN HONAP(161030) Print valid till - 27-Aug-2020 Printed on - 17-Aug-2020
a l i 73
SOP Valid Till - 27-Jul-2021
TRT JOB
DAY7
O P
d S
a l i
V

O P
d S
Printed By -NIRANJAN HONAP(161030) Print valid till - 27-Aug-2020 Printed on - 17-Aug-2020
a l i 74
SOP Valid Till - 27-Jul-2021
Step 45: JACKING OF BOTTOM STATOR WAS DONE USING HYD. JACK (PLACED WITH THE
HELP OF ROPE)

O P
d S
a l i
V

O P
d S
Printed By -NIRANJAN HONAP(161030) Print valid till - 27-Aug-2020 Printed on - 17-Aug-2020
a l i 75
SOP Valid Till - 27-Jul-2021
STEP 46 : LIFTING OF BOTTOM STATOR (USING EYEBOLTS + SHACKLE + SLING)

O P
d S
a l i
V

O P
d S
Printed By -NIRANJAN HONAP(161030) Print valid till - 27-Aug-2020 Printed on - 17-Aug-2020
a l i 76
SOP Valid Till - 27-Jul-2021
STEP 47 : PLACING OF BOTTOM STATOR ON FLOOR IN PROPER POSITION

O P
d S
a l i
V

O P
d S
Printed By -NIRANJAN HONAP(161030) Print valid till - 27-Aug-2020 Printed on - 17-Aug-2020
a l i 77
SOP Valid Till - 27-Jul-2021
WATER ACCUMULATION ON BOTTOM COVER

O P
d S
a l i
V

O P
d S
Printed By -NIRANJAN HONAP(161030) Print valid till - 27-Aug-2020 Printed on - 17-Aug-2020
a l i 78
SOP Valid Till - 27-Jul-2021
STEP 48 : DISMANTLING OF BOTTOM CASING (SPANNER 24 & ALLEN KEY 30 USED)
(M8X100mm HT BOLTSUSED)

O P
d S
a l i
V
DISMANTLING OF GUIDE PINS USING M8X100 mm HT BOLTS
O P
d S
Printed By -NIRANJAN HONAP(161030) Print valid till - 27-Aug-2020 Printed on - 17-Aug-2020
a l i 79
SOP Valid Till - 27-Jul-2021
STEP 48 : CONTD..

O P
d S
a l i
V

O P
d S
Printed By -NIRANJAN HONAP(161030) Print valid till - 27-Aug-2020 Printed on - 17-Aug-2020
a l i 80
SOP Valid Till - 27-Jul-2021
STEP 49: CLEANING OF LINKAGE OF BOTTOM STATOR FOR FREE ROTATION

O P
d S
a l i
V

O P
d S
Printed By -NIRANJAN HONAP(161030) Print valid till - 27-Aug-2020 Printed on - 17-Aug-2020
a l i 81
SOP Valid Till - 27-Jul-2021
STEP 50 : STATOR BLADES WHOSE FREE ROTATION COULDN’T ACHIEVED BY CLEANING
WERE OPENED AND O-RING(5mm) WAS CHANGED (SPANNER USED 46 & 30)

SPANNER 30

O P
d S
a l i SPANNER 46

O P
d S
Printed By -NIRANJAN HONAP(161030) Print valid till - 27-Aug-2020 Printed on - 17-Aug-2020
a l i 82
SOP Valid Till - 27-Jul-2021
STEP 50: CONTD..

O P
d S
a l i
V

O P
d S
Printed By -NIRANJAN HONAP(161030) Print valid till - 27-Aug-2020 Printed on - 17-Aug-2020
a l i
SOP Valid Till - 27-Jul-2021
STEP 50: CONTD..

O P
d S
a l i
V

O P
O-RING SLOT AND O-RING
d S
Printed By -NIRANJAN HONAP(161030) Print valid till - 27-Aug-2020 Printed on - 17-Aug-2020
a l i 84
SOP Valid Till - 27-Jul-2021
STEP 51: CHECKING OF WATER SPRAYING NOZZLES

O P
d S
a l i
V

O P
d S
Printed By -NIRANJAN HONAP(161030) Print valid till - 27-Aug-2020 Printed on - 17-Aug-2020
a l i 85
SOP Valid Till - 27-Jul-2021
TRT JOB
DAY8
O P
d S
a l i
V

O P
d S
Printed By -NIRANJAN HONAP(161030) Print valid till - 27-Aug-2020 Printed on - 17-Aug-2020
a l i 86
SOP Valid Till - 27-Jul-2021
STEP 52: HOLES MADE ON BOTTOM CASING TO AVOID WATER LOGGING (4 No.s)

O P
d S
a l i
V

O P
d S
Printed By -NIRANJAN HONAP(161030) Print valid till - 27-Aug-2020 Printed on - 17-Aug-2020
a l i 87
SOP Valid Till - 27-Jul-2021
STEP 53:DYE PENETRANT TEST OF BOTTOM STATOR BLADES (FOUND OK)

CLEANER PENETRANT DEVELOPER

O P
d S
a l i
V

O P
d S
Printed By -NIRANJAN HONAP(161030) Print valid till - 27-Aug-2020 Printed on - 17-Aug-2020
a l i 88
SOP Valid Till - 27-Jul-2021
STEP 54: APPLICATION OF MOLYKOTE PASTE IN THE SLOT (BOTTOM CASING)
(ANTI-CORROSION )

O P
d S
a l i
V

O P
d S
Printed By -NIRANJAN HONAP(161030) Print valid till - 27-Aug-2020 Printed on - 17-Aug-2020
a l i 89
SOP Valid Till - 27-Jul-2021
STEP 55 : ASSEMBLY OF BOTTOM HALF STATOR OVER BOTTOM CASING

Crank slide block • POSITIONING OF STATOR


BLADE OVER THE
CASING

• ADJUSTMENT OF SLIDE BLOCK


OF STATOR BLADES IN
ALIGNMENT WITH SLOT OF

O P BOTTOM CASING

d S
a l i • GRADUAL LOWERING OF

V STATOR WITH HELP OF


(CHAIN
BLOCK+EOT CRANE ) WITH
VISUAL INSPECTION
(PRECISION REQD.)
O P
d S
Printed By -NIRANJAN HONAP(161030) Print valid till - 27-Aug-2020 Printed on - 17-Aug-2020
a l i 90
SOP Valid Till - 27-Jul-2021
STEP 55:CONTD..

O P
d S
a l i
V

O P
d S
Printed By -NIRANJAN HONAP(161030) Print valid till - 27-Aug-2020 Printed on - 17-Aug-2020
a l i 91
SOP Valid Till - 27-Jul-2021
STEP 54: CONTD..

O P
d S
a l i
V
PLACING OF FIXTURE OVER THE ASSEMBLY OF BOTTOM CASING & STATOR
O P
d S
Printed By -NIRANJAN HONAP(161030) Print valid till - 27-Aug-2020 Printed on - 17-Aug-2020
a l i 92
SOP Valid Till - 27-Jul-2021
STEP 55: CONTD..

FIXTURE WAS

O P BOLTED UP TO
ROOT THE SLIDE

d S BLOCKS INTO THE

a l i SLOT

O P
d S
Printed By -NIRANJAN HONAP(161030) Print valid till - 27-Aug-2020 Printed on - 17-Aug-2020
a l i 93
SOP Valid Till - 27-Jul-2021
TRT JOB
DAY9
O P
d S
a l i
V

O P
d S
Printed By -NIRANJAN HONAP(161030) Print valid till - 27-Aug-2020 Printed on - 17-Aug-2020
a l i 94
SOP Valid Till - 27-Jul-2021
REMOVAL OF GUIDE PIN BROKEN PIECE USING MAGNETIC DRILL

O P
d S
a l i
V

O P
d S
Printed By -NIRANJAN HONAP(161030) Print valid till - 27-Aug-2020 Printed on - 17-Aug-2020
a l i 95
SOP Valid Till - 27-Jul-2021
CONTD..

O P
d S
a l i
V

O P
d S
Printed By -NIRANJAN HONAP(161030) Print valid till - 27-Aug-2020 Printed on - 17-Aug-2020
a l i 96
SOP Valid Till - 27-Jul-2021
STEP 56 : DEDICATED STAND WAS FABRICATED AND TOP COVER WAS PLACED OVER IT

O P
d S
a l i
V

O P
d S
Printed By -NIRANJAN HONAP(161030) Print valid till - 27-Aug-2020 Printed on - 17-Aug-2020
a l i 97
SOP Valid Till - 27-Jul-2021
STEP 57 : CLEANING OF PARTING SURFACE OF TOP COVER

O P
d S
a l i
V

O P
d S
Printed By -NIRANJAN HONAP(161030) Print valid till - 27-Aug-2020 Printed on - 17-Aug-2020
a l i 98
SOP Valid Till - 27-Jul-2021
STEP 58 : DYE PENETRANT TEST OF ROTOR BLADES (FOUND OK)

O P
d S
a l i
V

O P
d S
Printed By -NIRANJAN HONAP(161030) Print valid till - 27-Aug-2020 Printed on - 17-Aug-2020
a l i 99
SOP Valid Till - 27-Jul-2021
STEP 59 : (BOTTOM CASING+ BOTTOM STATOR) ASSEMBLY WAS ASSEMBLED OVER THE
TURBINE BODY

O P
d S
a l i
V

O P
d S
Printed By -NIRANJAN HONAP(161030) Print valid till - 27-Aug-2020 Printed on - 17-Aug-2020
a l i 100
SOP Valid Till - 27-Jul-2021
STEP 59: CONTD..

O P
d S
a l i MOLYKOTE PASTE

V COATING
(Anti-Corrosion)
OVER THE RESTING
SURFACES

O P
d S
Printed By -NIRANJAN HONAP(161030) Print valid till - 27-Aug-2020 Printed on - 17-Aug-2020
a l i 101
SOP Valid Till - 27-Jul-2021
STEP 59: CONTD..(ALLEN KEY 22 mm Used)

O P
d S
a l i
V
GUIDE PINS M16 BOLTS OF GUIDE FIXTURES WERE REMOVED AFTER
O P
WAY OF TSB HYD. WERE PLACED PLACEMENT

d S
Printed By -NIRANJAN HONAP(161030) Print valid till - 27-Aug-2020 Printed on - 17-Aug-2020
a l i 102
SOP Valid Till - 27-Jul-2021
STEP 60: CLEARANCE BETWEEN BOTTOM STATOR BLADES IN CLOSED CONDITION WAS
CHECKED (AFTER POWER GETTING OF HYD. FOR TSB POSITIONING SERVO MOTOR )

CLEARANCES WERE FOUND IN


RANGE 0.12-0.5 mm
ALLOWED UPTO 2.2mm

O P
d S
a l i
V

O P
d S
Printed By -NIRANJAN HONAP(161030) Print valid till - 27-Aug-2020 Printed on - 17-Aug-2020
a l i 103
SOP Valid Till - 27-Jul-2021
STEP 61: MEASUREMENT WAS TAKEN BETWEEN THE BODY AND MOVABLE BOTTOM
CASE IN FULLY CLOSED CONDITION (TOWARDS INLET AREA)

TRYSQUARE

O P
d S
a l i
V
USE OF TRYSQUARE & INNER VERNIER FOR MEASUREMENT FOUND AS (29+2)mm

O P
d S
Printed By -NIRANJAN HONAP(161030) Print valid till - 27-Aug-2020 Printed on - 17-Aug-2020
a l i 104
SOP Valid Till - 27-Jul-2021
TRT JOB
P
DAY10
O
d S
a l i
V

O P
d S
Printed By -NIRANJAN HONAP(161030) Print valid till - 27-Aug-2020 Printed on - 17-Aug-2020
a l i 105
SOP Valid Till - 27-Jul-2021
STEP 62 :PLACING OF OIL SEAL OVER THE SEATING

APPLICATION OF HYLOMAR BLUE PASTE ON THE


SEATING OF OIL SEAL

O P
d S
a l i
V

O P
d S
Printed By -NIRANJAN HONAP(161030) Print valid till - 27-Aug-2020 Printed on - 17-Aug-2020 l i
OIL SEAL RING BOTTOM HAL1 F0 6
a SOP Valid Till - 27-Jul-2021
STEP 62: CONTD..

O P
d S
a l i
V

O P
d S
Printed By -NIRANJAN HONAP(161030) Print valid till - 27-Aug-2020 Printed on - 17-Aug-2020
a l i 107
SOP Valid Till - 27-Jul-2021
STEP 63: CLEANING OF JOURNAL SURFACE WITH OILSTONE

O P OIL-STONE

d S
a l i
V

O P
d S
Printed By -NIRANJAN HONAP(161030) Print valid till - 27-Aug-2020 Printed on - 17-Aug-2020
a l i 108
SOP Valid Till - 27-Jul-2021
STEP 64: CHECKING OF JOURNAL BEARING SEATING CONTACT
OIL PAINT

O P
d S
a l i
V
CONTACT AREA OF JOURNAL BEARING
APPLICATION OF OIL PAINT OVER THE SEATING WAS CHECKED (BLUE IMPRESSION
O P
AREA OF JOURNAL BEARING APPEARED AFTER PLACING BEARING
OVER THE SEATING) (FOUND OK)
d S
Printed By -NIRANJAN HONAP(161030) Print valid till - 27-Aug-2020 Printed on - 17-Aug-2020
a l i 109
SOP Valid Till - 27-Jul-2021
STEP 65 : RTD CONNECTION OF JOURNAL BEARING

O P
d S
a l i
V

O P
d S
Printed By -NIRANJAN HONAP(161030) Print valid till - 27-Aug-2020 Printed on - 17-Aug-2020
a l i 110
SOP Valid Till - 27-Jul-2021
STEP 66 : DYE PENETRANT TEST OF TOP STATOR BLADES

CLEANER PENETRANT DEVELOPER

PENETRANT
SPRAYING OVER
STATOR BLADES

O P
d S
a l i
V

O P
d S
Printed By -NIRANJAN HONAP(161030) Print valid till - 27-Aug-2020 Printed on - 17-Aug-2020
a l i 111
SOP Valid Till - 27-Jul-2021
STEP 67 : STROKE OF SERVO MOTOR FOR TSB POSITIONING CHECKED

ACTUAL
FULLY CLOSED : 28-29
FULLY OPEN : 116-
117 STROKE :88

AS PER MANUAL
O P
FULLY CLOSED:30.26
d S
FULLY OPEN:117.8
STROKE :87.8
a l i
V

O P
d S
Printed By -NIRANJAN HONAP(161030) Print valid till - 27-Aug-2020 Printed on - 17-Aug-2020
a l i 112
SOP Valid Till - 27-Jul-2021
STEP 68 : WATER SPRAYING NOZZLE CHECKED

O P
d S
a l i
V

O P
d S
Printed By -NIRANJAN HONAP(161030) Print valid till - 27-Aug-2020
DAMAGED GASKET
Printed on - 17-Aug-2020
a l i 113
SOP Valid Till - 27-Jul-2021
STEP 68 : CONTD..

O P
d S
a l i CHOKED
V NOZZLE

O P
d S
Printed By -NIRANJAN HONAP(161030) Print valid till - 27-Aug-2020 Printed on - 17-Aug-2020
a l i 114
SOP Valid Till - 27-Jul-2021
STEP 69: LIFTING OF ROTOR AND INSTALLING OVER THE TURBINE BODY

O P
d S
a l i
V

O P
d S
Printed By -NIRANJAN HONAP(161030) Print valid till - 27-Aug-2020 Printed on - 17-Aug-2020
a l i 115
SOP Valid Till - 27-Jul-2021
STEP 70 : INSTALLING OF THRUST BEARING

O P CLEANING OF THRUST PADS


WITH SRUBBER

d S
a l i
V

O P
d S
Printed By -NIRANJAN HONAP(161030) Print valid till - 27-Aug-2020 Printed on - 17-Aug-2020
a l i 116
SOP Valid Till - 27-Jul-2021
STEP 70: CONTD..

O P ASSEMBLING OF THRUST

d S PADS OVERBEARING

a l i
V

O P
d S
Printed By -NIRANJAN HONAP(161030) Print valid till - 27-Aug-2020 Printed on - 17-Aug-2020
a l i 117
SOP Valid Till - 27-Jul-2021
STEP 70: CONTD..

INSTALLING OF BOTTOM HALF


OF THRUST BEARING WITH THE
HELP OF ALLEN KEY 8mm

O P TO ROTATE THE BEARING

d S
a l i
V

O P
NOTE ALL THE THRUST PADS ARE IN BOTTOM HALF (AT EXTREME LEFT (VIEWED
FROM TURBINE END)& ATBOTTOM)
d S
Printed By -NIRANJAN HONAP(161030) Print valid till - 27-Aug-2020 Printed on - 17-Aug-2020
a l i 118
SOP Valid Till - 27-Jul-2021
STEP 70: CONTD..

O P
d S
a l i
V
TOP & BOTTOM HALVES HAVE TO BE ATTACHED THROUGH THE CIRCLED
O P
SLOT AND PAD (TO BE DONE PRECISION AFTER PLACING BOTH HALVES OVER
TURBINE
d S
Printed By -NIRANJAN HONAP(161030) Print valid till - 27-Aug-2020 Printed on - 17-Aug-2020
a l i 119
SOP Valid Till - 27-Jul-2021
TRT JOB
P
DAY11
O
d S
a l i
V

O P
d S
Printed By -NIRANJAN HONAP(161030) Print valid till - 27-Aug-2020 Printed on - 17-Aug-2020
a l i 120
SOP Valid Till - 27-Jul-2021
STEP 71 : CLEARING OF CHOKAGE OF NOZZLE FOUND CHOKED

O P
d S
a l i
V
(ARGON WELDING)

O P
CHECKED WITHWATER
d S
Printed By -NIRANJAN HONAP(161030) Print valid till - 27-Aug-2020 Printed on - 17-Aug-2020
a l i
SOP Valid Till - 27-Jul-2021
STEP 72: CHECKING OF CLEARANCE BETWEEN ROTOR & OIL SEAL (BY OIL PAINT)

O P
d S
a l i
V

O P
d S
Printed By -NIRANJAN HONAP(161030) Print valid till - 27-Aug-2020 Printed on - 17-Aug-2020
a l i 122
SOP Valid Till - 27-Jul-2021
STEP 73 : CHECKING OF DIFFERENT CLEARANCES WITH FEELER GUAGE

LABYRINTH AND CARRIER

O P
d S
a l i
V
BP SEAL AND CARRIER

O P
d S
Printed By -NIRANJAN HONAP(161030) Print valid till - 27-Aug-2020 Printed on - 17-Aug-2020
a l i 123
SOP Valid Till - 27-Jul-2021
STEP 73 : CONTD..

O P
d S
a l i
V
• STAGE 1 STATOR BLADE TO ROTOR
• STAGE 1 ROTOR BLADE TO STATOR CASING
O P
• STAGE 2 STATOR BLADE TO ROTOR
• STAGE 2 ROTOR BLADE TO STATOR CASING
d S
Printed By -NIRANJAN HONAP(161030) Print valid till - 27-Aug-2020 Printed on - 17-Aug-2020
a l i 124
SOP Valid Till - 27-Jul-2021
STEP 74 : MEASURING OF ROTOR TO OIL SEAL SEATING WITH INSIDE MICROMETER WITH
BOTH SIDES (FOUND OK)

O P
d S
a l i
V

O P
d S
Printed By -NIRANJAN HONAP(161030) Print valid till - 27-Aug-2020 Printed on - 17-Aug-2020
a l i 125
SOP Valid Till - 27-Jul-2021
STEP 75 : STAG-B PASTE APPLIED AT PARTING SURFACE OF BOTTOM STATOR HALF
BEFORE INSTALLING THE TOP STATOR HALF

O P
d S
a l i
V

O P
d S
Printed By -NIRANJAN HONAP(161030) Print valid till - 27-Aug-2020 Printed on - 17-Aug-2020
a l i 126
SOP Valid Till - 27-Jul-2021
STEP 76: INSTALLING OF TOP STATOR HALF

O P
d S
a l i
V PLACING OF TOP HALF STATOR OVER
BOTTOM HALF WITH PRECISION

O P
d S
Printed By -NIRANJAN HONAP(161030) Print valid till - 27-Aug-2020 Printed on - 17-Aug-2020
a l i 127
SOP Valid Till - 27-Jul-2021
STEP 76 : CONTD..

MOLYKOTE PASTE WAS APPLIED TO THE


BOLTS AND WERE TIGHTENED WITH THE
HELP OF SPANNER 41 & 4 No.s DOVEL
PIN WERE INSERTED

O P
d S
a l i
V

O P
LOCKING OF BOLTS DONE WITH WIRE
d S
Printed By -NIRANJAN HONAP(161030) Print valid till - 27-Aug-2020 Printed on - 17-Aug-2020
a l i 128
SOP Valid Till - 27-Jul-2021
STEP 77 : JOURNAL BEARING INSTALLATION (MOP SIDE)

O P
d S
a l i
V
ALLEN KEY 10 & 12 USED TO TIGHTEN THE JOURNAL BEARING TOP HALF OVER
O P
BOTTOM HALF
d S
Printed By -NIRANJAN HONAP(161030) Print valid till - 27-Aug-2020 Printed on - 17-Aug-2020
a l i 129
SOP Valid Till - 27-Jul-2021
STEP 78: INTERFERENCE TEST BETWEEN BEARING HOUSING AND BEARING

O P HALF

d S
a l i
V

O P
d S
Printed By -NIRANJAN HONAP(161030) Print valid till - 27-Aug-2020 Printed on - 17-Aug-2020
a l i 130
SOP Valid Till - 27-Jul-2021
STEP78 : CONTD..

PLACING OF SS SIM OVER THE

O P HOUSING SEATING

d S
a l i
V

O P
d S
Printed By -NIRANJAN HONAP(161030) Print valid till - 27-Aug-2020 Printed on - 17-Aug-2020
a l i 131
SOP Valid Till - 27-Jul-2021
STEP78 : CONTD..

PLACING OF HOUSING OVER THE


SEATING AND TIGHTENING WITH
SPANNER 65

O P
d S
a l i
MEASUREMENT OF LEAD WIRE TAKEN AFTER
V
TAKING OFF THE HOUSING

O P
d S
INTERFERENCE=SIM THICKNESS – LEAD WIRE THICKNESS (FOUND 0.02mm & 0.03mm13O2 K)
Printed By -NIRANJAN HONAP(161030) Print valid till - 27-Aug-2020 Printed on - 17-Aug-2020
a l i
SOP Valid Till - 27-Jul-2021
TRT JOB
P
DAY12
O
d S
a l i
V

O P
d S
Printed By -NIRANJAN HONAP(161030) Print valid till - 27-Aug-2020 Printed on - 17-Aug-2020
a l i 133
SOP Valid Till - 27-Jul-2021
STEP 79 :CLEARANCE CHECK OF JOURNAL BEARING

MOP side :0.4mm


Generator side :0.5
mm
Dial guage for checking lifting of housing

O P
d S Clearance between rotor & journal

a l i bearing

V Dial guage for measuring rotor lifting

Rotor was lifted with help of sling and O P


S
EOT crane hook till the journal was
d
Printed By -NIRANJAN HONAP(161030) Print valid till - 27-Aug-2020
touched
Printed on - 17-Aug-2020
a l i 134
SOP Valid Till - 27-Jul-2021
STEP 80: INSTALLING OF MOVABLE TOP CASING OVER TOP STATOR

O P
d S
a l i
V
INTERLOCKING OF BOLTS WITH HELP OF
O P
Spanner used :28-30 & 4 No.s of dovel pin
WIRE
d S
Printed By -NIRANJAN HONAP(161030) Print valid till - 27-Aug-2020 Printed on - 17-Aug-2020
a l i 135
SOP Valid Till - 27-Jul-2021
STEP 81: CLEARANCE BETWEEN TOP STATOR HALF AND 2ND STAGE ROTOR BLADE BY
FEELER GAUGE (FOUND ~ 1.8 mm)

O P
d S
a l i
V

O P
d S
Printed By -NIRANJAN HONAP(161030) Print valid till - 27-Aug-2020 Printed on - 17-Aug-2020
a l i 136
SOP Valid Till - 27-Jul-2021
STEP 82: CLEARANCE BETWEEN 1st STAGE TOP STATOR BLADES IN FULLY CLOSED
CONDITION BY FEELER GUAGE

O P
d S
a l i
V

O P
d S
Printed By -NIRANJAN HONAP(161030)
(FOUND 0.3 mm – 1.1 mm)
Print valid till - 27-Aug-2020 Printed on - 17-Aug-2020
a l i 137
SOP Valid Till - 27-Jul-2021
STEP 83 : COUPLING INSTALLATION AT MOP SIDE (SPANNER 36 & Allen key: 4mm used)

O P
d S
a l i
V

O P
INSTALLING OF COUPLING ON ROTOR (ALLEN KEY 4 mm USED)
d S
Printed By -NIRANJAN HONAP(161030) Print valid till - 27-Aug-2020 Printed on - 17-Aug-2020
a l i 138
SOP Valid Till - 27-Jul-2021
STEP 83 : CONTD..

O P
d S
a l i
V

O P
COUPLING INSTALLATION OVER SHAFT OF MOP (MOLYKOTE SPRAY USED )
d S
Printed By -NIRANJAN HONAP(161030) Print valid till - 27-Aug-2020 Printed on - 17-Aug-2020
a l i 139
SOP Valid Till - 27-Jul-2021
STEP 83 : CONTD..

O P
d S
a l i
V

O P
d S
MOP LIFTED AND COUPLING HALVES WERE ENGAGED
Printed By -NIRANJAN HONAP(161030) Print valid till - 27-Aug-2020 Printed on - 17-Aug-2020
a l i 140
SOP Valid Till - 27-Jul-2021
STEP 84: CHECKING OF METAL-METAL GAP OF COUPLING

GAP WAS
FOUND LESS SO
GASKET OF 1.5
mm WAS
INSTALLED TO
MAINTAIN

O P PROPER GAP

d S (5-7 mm)

a l i
V GASKET

O P
d S
Printed By -NIRANJAN HONAP(161030) Print valid till - 27-Aug-2020 Printed on - 17-Aug-2020
a l i 141
SOP Valid Till - 27-Jul-2021
STEP 85: ALIGNMENT OF MOP SHAFT- ROTOR (DIAL GUAGE USED)

DIAL GAUGE WAS


INSTALLED ON ROTOR AND
STYLE (INDICATOR) OVER
MOP SHAFT

READING WERE TAKEN BY

O P ROTATING THE ROTOR AT


EVERY 90 DEG.

d S
a l i
V ADJUSTMENT MADE IN MOP
FIXING BOLTS AND
ALIGNMENT TOLERANCE WAS
BROUGHT 0.05 (V) & 0.5(H)

O P
d S
Printed By -NIRANJAN HONAP(161030) Print valid till - 27-Aug-2020 Printed on - 17-Aug-2020
a l i 142
SOP Valid Till - 27-Jul-2021
STEP 85: INSTALLATION OF TOP HALF OF OIL SEAL (ALLEN KEY 12 USED)

O P
d S
a l i
V

O P
d S
Printed By -NIRANJAN HONAP(161030) Print valid till - 27-Aug-2020 Printed on - 17-Aug-2020
a l i 143
SOP Valid Till - 27-Jul-2021
STEP 85 : CLEARANCE BETWEEN OIL SEAL AND ROTOR BY FEELER GAUGE

FOUND AS

O P 0.25mm

d S
a l i
V

O P
d S
Printed By -NIRANJAN HONAP(161030) Print valid till - 27-Aug-2020 Printed on - 17-Aug-2020
a l i 144
SOP Valid Till - 27-Jul-2021
STEP 86: INSTALLATION OF SPEED SENSOR ATMOP SIDE (ALLEN KEY 8 USED)

O P
d S
a l i
V

O P
d S
Printed By -NIRANJAN HONAP(161030) Print valid till - 27-Aug-2020 Printed on - 17-Aug-2020
a l i 145
SOP Valid Till - 27-Jul-2021
TRT JOB
P
DAY13
O
d S
a l i
V

O P
d S
Printed By -NIRANJAN HONAP(161030) Print valid till - 27-Aug-2020 Printed on - 17-Aug-2020
a l i 146
SOP Valid Till - 27-Jul-2021
STEP 87 : INSTALLATION OF CARBON SEAL BOTH SIDES
(SPANNER 18 &ALLEN KEY 10 USED)
SPRINGS WERE FIRST INSERTED INTO THE
SLOTS OF BOTTOM HALF CARBON
SEAL
OVER THE SPRING THE CARBON SEAL
BUSHES WERE INSERTED INTO THE
SLOTS (4 in no.)

O P BOTTOM HALF WAS PLACED WITH


GASKET AND BOLTED WITH SPANNER 18

d S
a l i
V

O P
d S
Printed By -NIRANJAN HONAP(161030) Print valid till - 27-Aug-2020 Printed on - 17-Aug-2020
a l i
SOP Valid Till - 27-Jul-2021
STEP 87 :CONTD…

FOR TOP HALF CARBON SEAL CARBON


BUSHES WERE PLACED AND SPRING
WAS PLACED OVER THE SLOT
PROVIDED ON BUSHES

O P
d S
TOP CARBON SEAL CASING WAS
a l i
THEN PLACED OVER BUSHES WITH
SPRING AND SET TO MATCH THE
V
SLOTS
AND BOLTED TO BOTTOM HALF WITH
ALLEN KEY 10
O P
d S
Printed By -NIRANJAN HONAP(161030) Print valid till - 27-Aug-2020 Printed on - 17-Aug-2020
a l i
SOP Valid Till - 27-Jul-2021
STEP 88 : LOCATING PIN OF MOP ( ROUND FILE USED 10mm TO SET AFTER ALIGNMENT)

O P
d S
a l i
V

O P
d S
Printed By -NIRANJAN HONAP(161030) Print valid till - 27-Aug-2020 Printed on - 17-Aug-2020
a l i 149
SOP Valid Till - 27-Jul-2021
STEP 89: PLACING OF CASING BOLTS (SPANNER 32 USED)

MOLYKOTE APPLICATION
OVER THE THREADS

TIGHTENED WITH HELKP OF

O P SPANNER 32 & HAMMER

d S
a l i
V

O P
d S
Printed By -NIRANJAN HONAP(161030) Print valid till - 27-Aug-2020 Printed on - 17-Aug-2020
a l i 150
SOP Valid Till - 27-Jul-2021
STEP 89 : APPLICATION OF STAG-B PASTE ON PARTING SURFACE (FOR SEALING)

O P
d S
a l i
V

O P
d S
Printed By -NIRANJAN HONAP(161030) Print valid till - 27-Aug-2020 Printed on - 17-Aug-2020
a l i 151
SOP Valid Till - 27-Jul-2021
STEP 90 : LIFTING OF TOP CASING ( EOT CRANE + 4 SLINGS + 2No.s 10T CHAIN BLOCK)

EQUAL LIFTING OF

O P BOTH SIDES WAS


DONE WITH HELP

d S OF CHAIN

a l i BLOCKS

O P
d S
Printed By -NIRANJAN HONAP(161030) Print valid till - 27-Aug-2020 Printed on - 17-Aug-2020
a l i 152
SOP Valid Till - 27-Jul-2021
STEP 90 : CONTD..

O P
d S
a l i
V

O P
d S
Printed By -NIRANJAN HONAP(161030) Print valid till - 27-Aug-2020 Printed on - 17-Aug-2020
a l i 153
SOP Valid Till - 27-Jul-2021
STEP 91 : INSTALLING OF TOP CASING (SPANNER USED : 65,75,85)

GUIDE COLUMN
POSITIONING

O P
d S
a l i
V

O P
d S
Printed By -NIRANJAN HONAP(161030) Print valid till - 27-Aug-2020 Printed on - 17-Aug-2020
a l i 154
SOP Valid Till - 27-Jul-2021
STEP 91: CONTD..

4 NO.s OF DOWEL
PIN WERE PLACED
(SPANNER 85)
O P
d S
a l i
V

O P
d S
Printed By -NIRANJAN HONAP(161030) Print valid till - 27-Aug-2020 Printed on - 17-Aug-2020
a l i 155
SOP Valid Till - 27-Jul-2021
STEP 91: CONTD..

CAP BOLTS TIGHTENING


SPANNER 65 & 75

O P
d S
a l i
V

O P
d S
Printed By -NIRANJAN HONAP(161030) Print valid till - 27-Aug-2020 Printed on - 17-Aug-2020
a l i 156
SOP Valid Till - 27-Jul-2021
STEP 92: PROPER LIFTING ARRANGEMENT WELDED ON PIPES

O P
d S
a l i
V

O P
d S
Printed By -NIRANJAN HONAP(161030) Print valid till - 27-Aug-2020 Printed on - 17-Aug-2020
a l i 157
SOP Valid Till - 27-Jul-2021
TRT JOB
P
DAY14
O
d S
a l i
V

O P
d S
Printed By -NIRANJAN HONAP(161030) Print valid till - 27-Aug-2020 Printed on - 17-Aug-2020
a l i 158
SOP Valid Till - 27-Jul-2021
STEP 93: INSTALLING OF BEARING GUARD AT MOP SIDE (ALLEN KEY 27mm USED)

O P
d S
a l i
V
HYLOMAR BLUE APPLICATION
O P
d S
Printed By -NIRANJAN HONAP(161030) Print valid till - 27-Aug-2020 Printed on - 17-Aug-2020
a l i 159
SOP Valid Till - 27-Jul-2021
STEP 94 : INSTALLING OF PIPINGS (N2 & VENT)

O P
d S
a l i
V

O P
d S
Printed By -NIRANJAN HONAP(161030) Print valid till - 27-Aug-2020 Printed on - 17-Aug-2020
a l i 160
SOP Valid Till - 27-Jul-2021
STEP 95: FLOAT CALCULATION OF ROTOR ( DIAL GUAGE AND HYD. JACK)

O P
d S
a l i
• DIAL GUAGE WAS SET OVER THE
V
BARRING GEAR
• JACKING WAS DONE FROM BOTH SIDES
TILL EXTREMITIES REACHED
O P
• TOTAL FLOAT : FOUND AS 0.65mm

d S
Printed By -NIRANJAN HONAP(161030) Print valid till - 27-Aug-2020 Printed on - 17-Aug-2020
a l i 161
SOP Valid Till - 27-Jul-2021
STEP 96: INSTALLING OF VIBRATION PROBE

O P
d S
a l i
V

O P
d S
Printed By -NIRANJAN HONAP(161030) Print valid till - 27-Aug-2020 Printed on - 17-Aug-2020
a l i 162
SOP Valid Till - 27-Jul-2021
STEP 97 :BOLTING UP ROTOR WITH GENERATOR AT BARRING GEAR (BOX SPANNER 60)

O P
d S
a l i
V

O P
d S
Printed By -NIRANJAN HONAP(161030) Print valid till - 27-Aug-2020 Printed on - 17-Aug-2020
a l i 163
SOP Valid Till - 27-Jul-2021
STEP 98:DISMANTLING OF COUPLING GUARD (BOTTOM HALF) FOR ALIGNMENT

O P
d S
a l i
V

O P
d S
Printed By -NIRANJAN HONAP(161030) Print valid till - 27-Aug-2020 Printed on - 17-Aug-2020
a l i 164
SOP Valid Till - 27-Jul-2021
STEP 99: ALIGNMENT CHECKED

O P
d S
a l i
V
ANGULAR MISALIGNMENT AT BOTH PLANES=0.00mm O P
PARALLEL MISALIGNMENT AT BOTH PLANES=0.02mm
d S
Printed By -NIRANJAN HONAP(161030) Print valid till - 27-Aug-2020 Printed on - 17-Aug-2020
a l i 165
SOP Valid Till - 27-Jul-2021
STEP 100: WORM GEAR CHECK OF TURNING GEAR MOTOR

O P
d S
a l i
V
DISENGAGED ENGAGED

O P
d S
Printed By -NIRANJAN HONAP(161030) Print valid till - 27-Aug-2020 Printed on - 17-Aug-2020
a l i 166
SOP Valid Till - 27-Jul-2021
STEP 100: BEARING GUARD AT GENERATOR SIDE ( ALLEN KEY 27)

LIFTING AND INSTALLING

O P
d S
a l i
V
HYLOMAR BLUE PASTE APPLICATION
O P
d S
Printed By -NIRANJAN HONAP(161030) Print valid till - 27-Aug-2020 Printed on - 17-Aug-2020
a l i
SOP Valid Till - 27-Jul-2021
STEP 101: COUPLING GUARD INSTALLED

O P
d S
SILICONE SEALANT APPLICATION a l i
V

O P
d S
Printed By -NIRANJAN HONAP(161030) Print valid till - 27-Aug-2020 Printed on - 17-Aug-2020
a l i 168
SOP Valid Till - 27-Jul-2021
STEP 102 : APPROACH TO TURNING GEAR MOTOR INSTALLED

O P
d S
a l i
V

O P
d S
Printed By -NIRANJAN HONAP(161030) Print valid till - 27-Aug-2020 Printed on - 17-Aug-2020
a l i 169
SOP Valid Till - 27-Jul-2021
TRT JOB
P
DAY15
O
d S
a l i
V

O P
d S
Printed By -NIRANJAN HONAP(161030) Print valid till - 27-Aug-2020 Printed on - 17-Aug-2020
a l i 170
SOP Valid Till - 27-Jul-2021
STEP 103 : LUBE OIL CIRCULATION STARTED

O P
d S
a l i
V

O P
d S
Printed By -NIRANJAN HONAP(161030) Print valid till - 27-Aug-2020 Printed on - 17-Aug-2020
a l i 171
SOP Valid Till - 27-Jul-2021
STEP 104: N2 PURGING DONE

O P
d S
a l i
V

O P
d S
Printed By -NIRANJAN HONAP(161030) Print valid till - 27-Aug-2020 Printed on - 17-Aug-2020
a l i 172
SOP Valid Till - 27-Jul-2021
STEP 105: IGV AND OGV OPERATED AFTER ENSURING CLOSE OF VENT VALVES

O P
d S
a l i
V

O P
d S
Printed By -NIRANJAN HONAP(161030) Print valid till - 27-Aug-2020 Printed on - 17-Aug-2020
a l i 173
SOP Valid Till - 27-Jul-2021
Electrical activities
O P
d S
a l i TRT-IBF
V

O P
d S
Printed By -NIRANJAN HONAP(161030) Print valid till - 27-Aug-2020 Printed on - 17-Aug-2020
a l i 174
SOP Valid Till - 27-Jul-2021
TRT-Transformer
At 33KV side oil leakage noticed It can be seen that the middle cable was wet
from bushing, same arrested with oil while other two cables are dry

O P
d S
a l i
V

O P
d S
Printed By -NIRANJAN HONAP(161030) Print valid till - 27-Aug-2020 Printed on - 17-Aug-2020
a l i 175
SOP Valid Till - 27-Jul-2021
TRT-Transformer
At two more place (cooling fins) there Primary side connection tightened
was oil leakages same arrested and temperature stickers pasted.

O P
d S
a l i
V

O P
d S
Printed By -NIRANJAN HONAP(161030) Print valid till - 27-Aug-2020 Printed on - 17-Aug-2020
a l i 176
SOP Valid Till - 27-Jul-2021
TRT-Transformer
Neutral switch connection tightness Neutral connection at transformer
checked. Marking done end checked.

O P
d S
a l i
V

O P
d S
Printed By -NIRANJAN HONAP(161030) Print valid till - 27-Aug-2020 Printed on - 17-Aug-2020
a l i 177
SOP Valid Till - 27-Jul-2021
TRT-Transformer

O P
d S
a l i
V

O P
d S
Printed By -NIRANJAN HONAP(161030) Print valid till - 27-Aug-2020 Printed on - 17-Aug-2020
a l i 178
SOP Valid Till - 27-Jul-2021
TRT-Generator
Generator stator connections (Located at bottom side) checked for
any heating found all tape in good condition.

O P
d S
a l i
V

O P
d S
Printed By -NIRANJAN HONAP(161030) Print valid till - 27-Aug-2020 Printed on - 17-Aug-2020
a l i 179
SOP Valid Till - 27-Jul-2021
TRT-GIS breaker panel

Panel open parts at back


side and front side control
section blown and cleaned.

O P
d S
a l i
V

O P
d S
Printed By -NIRANJAN HONAP(161030) Print valid till - 27-Aug-2020 Printed on - 17-Aug-2020
a l i 179
SOP Valid Till - 27-Jul-2021
TRT-CRP panel for GIS

Panel back side control


connections tightened,
blown and cleaned.

O P
d S
a l i
V

O P
d S
Printed By -NIRANJAN HONAP(161030) Print valid till - 27-Aug-2020 Printed on - 17-Aug-2020
a l i 180
SOP Valid Till - 27-Jul-2021
TRT- SPP & LSP panel

All power connections


tightened and temperature
stickers provided.

O P
d S
a l i
V

O P
d S
Printed By -NIRANJAN HONAP(161030) Print valid till - 27-Aug-2020 Printed on - 17-Aug-2020
a l i 181
SOP Valid Till - 27-Jul-2021
TRT-Exciter on Generator
Exicter diode chamber connection tightened and blowned.

O P
d S
a l i
V

O P
d S
Printed By -NIRANJAN HONAP(161030) Print valid till - 27-Aug-2020 Printed on - 17-Aug-2020
a l i 182
SOP Valid Till - 27-Jul-2021
INSTALATION OF SPEED SENSOR

*3 SPEED TRANSMITTER
• GAP SETTING IS 50 mil
(=1.27 MM)
Special procedure to measure
Gap by measuring voltage at
transmitter. ( 10 V at 1.27 mm)

O P
d S
a l i
V

O P
d S
Printed By -NIRANJAN HONAP(161030) Print valid till - 27-Aug-2020 Printed on - 17-Aug-2020
a l i 183
SOP Valid Till - 27-Jul-2021
THRUST BEARING PAD

Heat shrinkable tube fixing for


protection of RTD wire of
Thrust bearing Pad ,
( 1 No. pad replaced as RTD
was faulty)

O P
d S
a l i
V

O P
d S
Printed By -NIRANJAN HONAP(161030) Print valid till - 27-Aug-2020 Printed on - 17-Aug-2020
a l i 184
SOP Valid Till - 27-Jul-2021
Rotor Shaft Displacement Sensor
*Total Float of shaft is 0.6 mm
*Sensor is set zero, when Rotor
is at mid position i.e. 0.3 mm.
* Gap between Rotor and sensor
is set 1.27 mm by adjusting
transmitter voltage -10V

O P
d S
a l i
V

O P
d S
Printed By -NIRANJAN HONAP(161030) Print valid till - 27-Aug-2020 Printed on - 17-Aug-2020
a l i 185
SOP Valid Till - 27-Jul-2021

You might also like