Professional Documents
Culture Documents
CONTRACTOR
NAME
RAMS Studies
PROJECT: HANOI PILOT LIGHT METRO LINE
Section Nhon - Hanoi Railway Station
PACKAGE: NAME
PACKAGE NUMBER: HPLMLP/CP-0X
Revision
1A Name Date Signature
N°:
Prepared by AUTHOR
Checked by CHECKER
Validated by DIRECTOR
Table of contents
1. INTRODUCTION..........................................................................................................................................7
1.1 PURPOSE...................................................................................................................................................7
1.2 SAFETY POLICY........................................................................................................................................7
1.3 PROJECT DESCRIPTION.............................................................................................................................9
1.4 SCOPE OF WORKS..................................................................................................................................10
2. ORGANISATION & RESPONSIBILITIES.............................................................................................11
2.1 SAFETY ORGANISATION STRUCTURE.....................................................................................................11
2.2 ROLES AND RESPONSIBILITIES...............................................................................................................12
3. SAFETY MANAGEMENT.........................................................................................................................17
3.1 STANDARDS............................................................................................................................................17
3.2 SAFETY V LIFECYCLE............................................................................................................................17
3.3 SAFETY TARGETS...................................................................................................................................17
3.4 SAFETY PROCESS...................................................................................................................................17
3.5 SOFTWARE ASSURANCE.........................................................................................................................17
4. RISK ANALYSIS AND HAZARD MANAGEMENT..............................................................................18
4.1 RISK EVALUATION AND ACCEPTANCE...................................................................................................18
4.2 RISK MITIGATION..................................................................................................................................18
4.3 PRELIMINARY HAZARD ANALYSIS (PHA).............................................................................................18
4.4 FAILURE MODE, EFFECTS & CRITICALITY ANALYSIS (FMECA)..........................................................18
4.5 SIL ALLOCATION...................................................................................................................................18
4.6 SYSTEM HAZARD ANALYSIS (SHA)......................................................................................................18
4.7 OPERATING AND SUPPORT HAZARD ANALYSIS (OSHA)......................................................................18
4.8 INTERFACE HAZARD ANALYSIS (IHA)..................................................................................................18
4.9 FAULT TREE ANALYSIS (FTA)..............................................................................................................18
4.10 DESIGN STUDIES....................................................................................................................................18
4.10.1 Fire Engineering Plan...................................................................................................................18
4.10.2 Emergency and Evacuation..........................................................................................................18
4.11 HAZARD TRANSFER...............................................................................................................................18
4.12 HAZARD LOG.........................................................................................................................................18
4.13 CIVIL WORKS FINAL SAFETY REPORT...................................................................................................18
5. SOFTWARE ASSURANCE........................................................................................................................19
6. SAFETY VERIFICATION AND VALIDATION....................................................................................20
6.1 ENGINEERING SAFETY VERIFICATION PLAN..........................................................................................20
6.2 ENGINEERING SAFETY VERIFICATION REPORT......................................................................................20
6.3 SPECIFIC COMPLIANCE MATRIX............................................................................................................20
6.4 TESTING.................................................................................................................................................20
6.5 SOFTWARE ASSURANCE.........................................................................................................................20
7. SAFETY REVIEW AND APPROVAL......................................................................................................21
7.1 INTERNAL PROCESS................................................................................................................................21
7.2 EXTERNAL PROCESS..............................................................................................................................21
7.3 TAKEOVER.............................................................................................................................................21
7.4 HANDOVER.............................................................................................................................................21
8. MANAGEMENT PROCESSES.................................................................................................................22
8.1 QUALITY MANAGEMENT........................................................................................................................22
8.1.1 Quality Organisation, Roles and Responsibilities........................................................................22
8.1.2 Implementation.............................................................................................................................22
8.1.3 Sub-Contractors............................................................................................................................22
8.1.4 Design Management.....................................................................................................................22
8.1.5 Quality Documentation.................................................................................................................22
8.1.6 Audit and Inspection.....................................................................................................................22
8.1.7 Reporting......................................................................................................................................22
8.2 REQUIREMENTS MANAGEMENT.............................................................................................................22
Doc N° XXX-XXX-XXX-XXX-XXX-XXXXX Page 4/33
Hanoi Pilot Light Metro Project Civil Work Safety Assurance Plan
8.2.1 Apportionment..............................................................................................................................22
8.2.2 Compliance...................................................................................................................................22
8.3 CONFIGURATION MANAGEMENT...........................................................................................................22
9. MANAGEMENT, CONTROL AND PLANNING...................................................................................23
9.1 MANAGEMENT OF SUB-CONTRACTORS.................................................................................................23
9.2 MODIFICATIONS AND CHANGE CONTROL..............................................................................................23
9.3 REQUIREMENTS MANAGEMENT.............................................................................................................23
9.4 CONFIGURATION MANAGEMENT...........................................................................................................23
9.5 DRACAS...............................................................................................................................................23
9.6 SAFETY REVIEWS...................................................................................................................................23
9.7 SAFETY AUDIT.......................................................................................................................................23
10. APPENDICES..........................................................................................................................................24
Abbreviations
Definitions
TERMS DEFINITION
Term used within this document Definition as described in project references
Contract Documents
Standards
Project References
1. INTRODUCTION
1.1 PURPOSE
The section should describe the high level objectives of the Civil Work Safety Assurance Plan
including reference to overall project requirements and relevant standards.
The management and staff of contractor are committed to satisfy in their Occupational Health &
Safety interests at all times.
Contractor shall work as a team to constantly maintain and continually improve the effectiveness for
better Occupational and Health & Safety performance beyond compliance to the current legal and
customer requirements.
One of the most important aims of Contractor for the project is focusing on Health and Safety
management Plan as a top priority. Conscious of the risks inherent to the Project; Contractor will fully
commit to implement an Occupational Safety management system covering all of our activities during
execution of the Project based on the principles of continuous improvement of system. Contractor
encourages a “zero incident mindset” in all employees, Subcontractors, lower-tier Subcontractors,
Suppliers and all related sides in this project. This means that we will not be satisfied until we achieve
zero incidents in the field of safety during the execution of the Project.
The Contractors working on this project and all subcontractors and other contractors working on the
site, shall comply with this Project Health and Safety management Plan, whether contracted to the
Contractor or not.
The scope of the Contractor’s Health and Safety management Plan shall include the Project site,
contractors Work site and works areas outside the Works construction limits, such as, equipment and
material storage sites, waste areas, and temporary plant sites and areas of the Project site impacted by
the Contractor’s construction activity.
The scope covers the Contractor responsibilities for overall site Health and Safety management of
construction safety, including plans and procedures for health, safety and emergency response, as
outlined in this Plan.
Our objectives are to:
Safeguard the Safety of all personnel and communities who may be affected by the
construction activities of Project,
Mitigate the opportunity of exposure to risks in all areas of construction activities with a faith
that any incident is preventable,
Promote a culture awareness regarding risks associated with the construction activities,
Plan and implement response measures dealing with safety hazards and emergencies.
Contractor’s Project Manager shall personally commit to implement and maintain a Health and Safety
management system and comply with applicable regulations and Health and Safety management Plan
rules.
Our objective is "NO accident" and "Don't waste time for accident"
Hanoi Pilot Light Metro Line, section Nhon - Hanoi Railway Station is a major project for Hanoi City.
According to the Hanoi Transportation Master Plan until 2020, total length of HPLML (Line 3) shall
reach 21,5km from Nhon to Hoang Mai. The first phase of this line, and part of this Contract is from
Nhon to Hanoi Railway Station, with about 8.5 km elevated section and 4.0 km underground section.
This line includes 12 stations as presented in Figure 1.1 (with 8 elevated and 4 underground stations).
The Depot is located at Nhon with area of 150,550m2.
The CP01 Contract’s work scope is Viaduct Line at Elevated Section, including the construction of
viaduct structures, which link along the National Road No32, Ho Tung Mau, Xuan Thuy, Cau Giay
and interfaces with underground section at the beginning of Kim Ma Street. The contract shall be
completed and within 30 months from the date of the Commencement Date.
Both metro and structure alignment follow the current and/or planned median road. Viaduct structures
are divided into standard viaducts which cover most of the elevated section and special viaducts where
long or special spans are required to pass over major constraints (2nd Ring Road, 3rd Ring Road,
Nhue River). Other non-typical structure consists in Crossover (metro line requires switches), ramps to
depot and underground sections and Y-bridge (branches off to depot). The overview of the project is
shown in Figure 1.1
French Government (DGTPE), French Agency for Development (AFD), Euro Investment
Bank (EIB) and Asian Development Bank (ADB).
GLOSSARY
The Contractor shall establish a H&S Management System (HSMS) for all the Contractor’s works.
The HSMS shall be capable of demonstrating that all the H&S requirements of the Contract and all
relevant standards, regulations and consents are being met.
ORGANIZATION CHART
PROJECT MANAGEMENT
HEAD OFFIC ↑
S ITE OFFICE ↓
PROJECT MANAGER
HS E DEPARTMENT QA / QC DEPARTMENT
(Security, health and safety (Security, health and safety (Traffic, health and safety (115 Emergency and Safety CHIEF OF
QC CHIEF ENGINEER QC CHIEF ENGINEER
control) control) control) (Environment Control) Training) LABORATORY
CONTRACT S taff
DESIGN M ANAGER WORK PROGRAM M E ADM .M ANAGER CHIEF ACCOUNTANT
M ANAGER S taff
M ANAGER COST CONTROL
M ANAGER S taff
HSE Manager
Daily TBM
Installs. Facility Rest spots
Induction
Check equip/tool Waste/ Env test
S. Training
Check worker’s act Environment
Fire plan/drill
Warning/reward monitoring
Security
The Contractor shall develop and maintain a management list of roles and responsibilities. Roles and
responsibilities shall not be restricted to H&S staff but shall also include other members of the
Contractor’s team who have H&S responsibilities e.g. Risk Manager, Managers, Foremen, Engineers,
and Agents. The Contractor’s General H&S Plan and the associated Procedures shall define the
responsibilities in detail.
Be responsible to provide full co-operation and assistance in all safety surveillance carried out
by the Employer, Authorized personnel and Government agencies;
Instruct all Workers or Sub-contractor(s) of any tier to cease operation and take urgent
appropriate action to make safe the Site and prevent unsafe working practices or other
infringements of the Health & Safety Plan or Statutory Regulations;
Prepare the safety criteria for the Monthly Progress Report and submit to the Contractor's
Project Manager;
Immediately inform the Contractor's Project Manager to notify the Engineer of any incidents
that are obliged to be reported to the relevant Government Agency;
Review safety issues and any techniques that may be available to improve safety performance
both prior to its introduction and throughout its use;
Establish and chair regular meetings to review and update all Health & Safety Procedures with
his Health & Safety Officer(s) and Health & Safety Staff;
Inform and advise the Engineer and seek the Engineer's Approval of any changes to Health &
Safety Procedure(s) or Processes - especially regarding any inter organisational;
Upon receipt of the Engineer's Approval to change a Health & Safety Procedure or Policy - especially
regarding an inter-organisational Health & Safety Procedure, ensure all his documentation is updated,
released, and disseminated to the workforce via his Health & Safety Officer(s).
Supply the Health & Safety Manager with statistics and attendance lists;
Ensure that the accidents/incidents have been reported, recorded and that a thorough investigation has
been completed and corrective action undertaken;
Collate accident and incident statistics and ensure that this information is disseminated to the
organisation(s) requiring it;
Doc N° XXX-XXX-XXX-XXX-XXX-XXXXX Page 13/33
Hanoi Pilot Light Metro Project Civil Work Safety Assurance Plan
Together with the Health & Safety Staff, ensure that adequate safety equipment and PPE (personal
protective equipment) is available and used correctly;
Ensure that an adequate first aid service and appropriately trained staff are provided;
Ensure that all Sub-contractors have copies of the current Health & Safety Plan and incorporate it into
their document to ensure compliance with the current plan at all tiers of Sub-contracting;
Ensure that all Sub-contractors are aware of the Contractor's Health & Safety Programme and their
responsibilities within the programme ensure that safety, rescue and industrial health matters are given
a high degree of publicity to all personnel on Site. Posters, both in Vietnamese and English, drawing
attention to Site safety, rescue and health matters shall be made or obtained from appropriate sources
and shall be prominently displayed in relevant areas of the Site;
Ensure to conduct regular Health & Safety training and rescue training courses in accordance with the
Site Health & Safety Plan and with the Hanoi Urban Authorities, the Police and Fire Departments;
Ensure that all activities undertaken on the Site are recorded in a Site Health &Safety Diary for each
day. The Site Health & Safety Diary shall be available at all times for inspection;
Immediately inform the Contractor's Health & Safety Manager to notify the Contractor's Project
Manager of any accidents that are obliged to be reported to the relevant Government Agency via the
Employer;
2.2.9 Workers
Wearing proper PPE for specific jobs
Using the correct equipment and tools for the job
Doing nothing to endanger himself or other workers
Keeping his tools in good condition and not using when damaged
Refraining from abuse of safety devices, equipment, and welfare facilities
Keeping his workplace in safe and tidy and preventing environmental pollution
Observing all relevant H&S rules applied in this project
(2) For all workers who involve to the work permit shall be provided by a special safety training
focusing on task specific risks before the work is initially commenced. For following subjects:
Confined space work
Work at high.
Education and training result for workers shall be recorded and maintained on the form of “Education
and Training Record”
2.2.13
3. SAFETY MANAGEMENT
3.1 STANDARDS
This section should detail the standards to be applied to the safety management process. Typically, this
will include EN50126, EN50128 and EN50129 as a minimum.
3.1.1 Standards
OHSAS 18001: Occupational Health and Safety Management System
ISO 14001: A series of Environmental Management System’
Client’s Health, Safety, Security & Environmental (HSE) Requirements
Any other relevant codes, standards and regulations that, Contractor will be required must
applied.
Remember that your activities may endanger fellow workers or nearby equipment and
material. Take necessary steps to safeguard them.
Review the hazards and risks of the work with your supervisor.
Remember that safety rule can be changed only when a person’s life or property is in
immediate danger and when permission is received from your supervisor.
It is necessary to understand emergency instructions and anticipate what you will do in case of
an emergency. Above all, be calm.
It is not allowed to wear jewellery i.e., rings, bracelets, or neck chains on the job.
Report to your supervisor if there are unsafe tools, equipment, hazardous condition, or unsafe
acts before and during your job
Use the PPE and/or safety facility as they are specified for the job. Such things are available
through H&S team or your supervisor at all time.
Practice good housekeeping in your work area. Pick up your tools. Do not leave or scrap
materials where they will be hazardous to others.
To protect yourself, obey all warning signs such as “Keep Out,” “No Smoking”, “Eye
Protection required”, “Authorized Personnel Only”, etc.
Do not take shortcuts. Use appropriate ladder, ramps, stairways, and paths, and do not use compressed
air or oxygen to blow dust or dirt from clothing or skin.
H&S Policy
Implementation Planning
PLAN
H&S Policy
OHS (Occupational Health &
Safety) Hazard & Risk
Legal Requirements DO
Objectives, Targets, and
programs Resources, roles
Act/Improve Responsibility and authority
Competence, Training and
Management Awareness
review Consultation & communication
CHECK/CORRECT Documentation
Control Documents
Monitoring/Measurement Operational control
Evaluation of compliance Emergency preparedness
Non conformance
Incident/Accident
Corrective/preventive
Control of records
Internal HSE Management
system Audits
The scope of the Contractor’s Health and Safety management Plan shall include the Project site,
contractors Work site and works areas outside the Works construction limits, such as, equipment and
material storage sites, waste areas, and temporary plant sites and areas of the Project site impacted by
the Contractor’s construction activity.
The scope covers the Contractor responsibilities for overall site Health and Safety management of
construction safety, including plans and procedures for health, safety and emergency response, as
outlined in this Plan.
Our objectives are to:
Safeguard the Safety of all personnel and communities who may be affected by the
construction activities of Project,
Mitigate the opportunity of exposure to risks in all areas of construction activities with a faith
that any incident is preventable,
Promote a culture awareness regarding risks associated with the construction activities,
Plan and implement response measures dealing with safety hazards and emergencies.
To achieve these objectives, Contractor’s actions shall be based on the following
principles:
Planning, implementing, reviewing and continually improving our Safety
management system in compliance with Vietnam laws, Health and Safety management Plan
regulations and codes of practice,
Developing a systematic identification and assessment of risks, as well as means for
mitigation and control safety,
Providing necessary resources to implement the Health and Safety management Plan,
Promoting pro-active management structure through active participation, feedback,
commitment and involvement on all safety related programs and activities.
Contractor’s Project Manager shall personally commit to implement and maintain a Health and Safety
management system and comply with applicable regulations and Health and Safety management Plan
rules.
3.4 SAFETY PROCESS
This section should describe the overall process that will be applied throughout the project to manage
safety activities and ensure safety objectives are achieved. A more detailed explanation of each step
may be provided in relevant sections throughout this plan.
According to the progress of construction work, the location of posters and warning signs will be
changed to secure visibility and effectiveness.
3.4.4.3 Barricades
Hard barricades to restrict access to work area or certain parts of the plant such as lifting area, power
supply facility, etc., Will be installed.
All barricades are required to have signs on all side’s denoting the owner, reason for being there,
contact number, and dated. As usual, purpose of tape barricades shall be divided into such as follows;
Red tape may be utilized in certain situations, but must be limited in use.
Red & white barricade tape for storage of material
Black & yellow barricade tape for hoisting or working areas
Blue & white barricade tape for marking process areas
3.4.5.1 General
A copy of driver license, vehicle registration, insurance certificate and other information shall
be submitted to H&S team for review and acceptance.
A safety check shall be performed for all motor vehicle or heavy equipment to verify the
integrity and maintenance status of engine, truck, tires, etc.
When all above are acceptable, the vehicle, or equipment shall be registered with in the form
of Vehicle Registration Card
A fire extinguisher, rated at least the 5BC, shall be located in each vehicle cab.
Parking brake must be set whenever the vehicle is parked. Equipment parked on must have the wheels
checked.
3.4.6 Ladders
There is no excuse for using a makeshift means of access to a work area, and the Job-made
ladders must be constructed to conform to safety standard.
All manufactured ladders used on the job shall be of the heavy-duty industrial type. Broken or
damaged ladders must not be used. Repair or destroy them -immediately. Ladders to be
repaired must be tagged as “DO NOT USE".
Ladders should not be placed against movable objects. The base of the ladder must be set
back a safe distance from the vertical - approximately one fourth of -the working length of the
ladder.
Ladders used for access to a floor or platform must extend at least two (2) meters. The areas
around the top and base of ladders must be free of tripping hazards such as loose materials,
trash, and electric cords.
Ladders, which project into passageways or doorways, where they could be struck by
personnel, moving equipment, or materials being handled, must be protected by barricades or
guards.
Be sure that shoes are free of mud, grease or other substances, which could cause a slip or fall.
Do not carry materials up a ladder use a hand line. Always -move the ladder to avoid
overreaching.
Stepladders must be fully opened to permit the spreader to lock. Employees-are prohibited from
standing on the top two steps of a stepladder.
3.4.7 Scaffolding
When height of work place is two (2) meter and above, safety scaffoldings, of which safety
check has been made by H&S team, shall be installed.
A scaffold tagging system will be used for identifying the result of safety check i.e., “Green”
for use, “Red” for do not use, etc.
Guardrails must be installed on all open sides of scaffolds more than 0.9 meter-in height and
be constructed from components furnished by a maker. Where this is not possible, sound
50cm x 100cm, lumber must be used.
Scaffold planks must have in excess strength of retaining the capacity of workers;
All scaffolds must be at least two planks wide; no employees may work from a single plank unless
otherwise authorized.
Width of each plank used for platform and ramp shall not be less than 30cm.
Planks shall be supported on at least two frame connectors and tied firmly to prevent excessive
springing, deflection, loosening, or displacement.
Access ladders must be provided for each scaffold. Climbing off the end frames-is prohibited
unless their design incorporates an approved ladder.
Adequate mudsills or other rigid footing, capable of withstanding the maximum intended load,
must be provided.
Scaffolds must not be loaded in excess of their capacity and must be tied on to the structure at
intervals, which do not exceed 90cm horizontally, and 8m vertically.
Barrels, boxes, kegs or unstable objects must never be used as work platforms or to support
-scaffolds. Overhead protection is required where employees working on scaffolds are
exposed -to overhead hazards.
Access ladders must be provided for each scaffold. Climbing off the end frames-is prohibited
unless their design incorporates an approved ladder.
Adequate mud sills or other rigid footing, capable of withstanding the maximum intended
load, must be provided.
Scaffolds must not be loaded in excess of their capacity and must be tied on to the structure at
intervals which do not exceed 90cm horizontally and 8m vertically.
Barrels, boxes, kegs or unstable objects must never be used as work platforms or to support -scaffolds.
Overhead protection is required where employees working on scaffolds are exposed -to overhead
hazards.
3.4.8.1 General
Protection of property from theft and the prevention of unauthorized personnel from entering
the project site are the main goals of security control.
A specific security arrangement plan that conforms to local regulations and Client’s security
requirements will be provided to the Client for review and acceptance.
All workers, visitors, and the operation of equipment and heavy equipment must follow the
designated access path from the gate to work area.
No intoxicating or alcoholic liquors or substances must be allowed to bring into the project
site and any unconscious drivers and personnel under the effect of alcohol or narcotics are not
allowed to enter.
Security guards shall fully cover the whole area of the project site 24 hours (3 shifts of 8 hours) and 7
days a week regardless of holidays or non-working hours.
At each gate, the Security Guard shall maintain a log sheet for entry/leaving of the vehicles
and heavy equipment to/from the project site.
Cranes and Lifting Equipment
a) General Requirements
All cranes and lifting equipment will be maintained and inspected with manufacturer’s
recommendation, the Client’s requirement, and applicable regulation by the law.
To maintain and inspect cranes and lifting equipment to ensure their safe condition is heavy
equipment superintendent / related section superintendent's responsibility with the assistance
of a H&S supervisor at each level (Daelim and sub-contractor).
b) Inspection
Step Inspection
When any crane or lifting equipment is mobilized to site it will be checked and
Initial Inspection inspected by Daelim’s heavy equipment superintendent / related section
superintendent in witness of site H&S Engineers.
Operator for each crane and lifting equipment will check his equipment prior to
Daily Checking by
start work using prearranged checklist and maintain the record with his
Operator
equipment.
Daelim’s heavy equipment superintendent / related section superintendent will
Monthly Inspection inspect all equipment on a monthly basis with the assistance of the Client and
keep the record.
c) Maintenance
Heavy equipment superintendent / related section superintendent is responsible for
maintenance of cranes and lifting equipment.
Heavy equipment superintendent / related section superintendent will keep maintenance
record for all equipment.
d) Operator
All operators of cranes and lifting equipment will have a valid operator license with at least 5
years of experience and will be fully competent to the particular type of crane to which he is
assigned.
Heavy equipment superintendent / related section superintendent will ensure that all operators
are physically fit and mentally sound with assistance of each supervisor. If any operator shows
any sign of illness, he will be removed from crane and/or lifting equipment.
A crane operator can operate the crane that he has been authorized to operate by Heavy
equipment superintendent / related section superintendent.
List of crane operators with relevant information will be maintained and will be provided to
the Client’s supervisor every month.
All mobile crane and lifting equipment will be in compliance with the manufacturer’s
recommended safety device.
All mobile cranes will be fitted with the manufacturer’s loading chart inside the cab where it
can be easily found.
The Construction Engineer shall provide a copy of the list of tools, materials, and equipment
to Safety Engineer to identify if any safety check is required.
Once a safety check is completed, a copy of the list shall be given to the Security Guard so
that he checks the entry of those items.
b) Materials Exit
No tools, materials, or equipment allowed to be taken out of the project site without written
authorization by responsible personnel.
Subcontractor shall submit the Material Outgoing Permit to the responsible Construction
Engineer and take his signature on the permit.
Once signed off, a copy of the outgoing permit shall be provided to Safety Engineer to
compare with entry list and let the Security Guard checks.
3.4.9.1 Smoking
Smoking is not permitted except in specified areas and smoking inside vehicles on the site is
not permitted.
Strike anywhere matches and lighters are not allowed in the construction area of our Project.
Cigarette butts should be discarded only in proper receptacles.
Smoking is not permitted anywhere
5. SOFTWARE ASSURANCE
This section should provide a description of the software assurance process that will be applied in
relation to any safety related software. Cross references may also be provided where applicable to
define where detailed processes and procedures are available. As a minimum, this section should
contain the following information:
- A list of software documents to be submitted throughout the project lifecycle
- TBD
8. MANAGEMENT PROCESSES
8.1 QUALITY MANAGEMENT
This section should state the Contractor’s Quality Policy and Objectives. The quality certificate of the
organisation (and any subcontractors) should be attached.
8.1.2 Implementation
This section should provide information on audits carried out and status of corrective actions and
observations.
8.1.3 Sub-Contractors
This section should describe the processes for selection, monitoring and control of suppliers, in
accordance with the approved plan and procedures.
8.1.7 Reporting
This Section should describe how regular reporting on safety will be undertaken by the Contractor.
8.2 REQUIREMENTS MANAGEMENT
8.2.1 Apportionment
8.2.2 Compliance
8.3 CONFIGURATION MANAGEMENT
This section should describe:
- The Contractor's Configuration Management system, such as processes for ensuring all
changes to design baselines are controlled and authorised.
- Change control processes.
10. APPENDICES
List of Safety deliverables
PHA table format
FMECA table format
OSHA table format
IHA document format
FMECA document format
Hazard Log document format