You are on page 1of 7

INDUSTRIAL PRACTICE REPORT (PRAKERIN)

REPAIR ON THE CONVENTIONAL IGNITION SYSTEM OF TOYOTA KIJANG


5K CARS

Report

Submitted to complete the final grade of the activity

Field Work Practice (PKL)

Academic Year 2020/2021

ARRANGED BY: XII TKRO A


Bagus Gimastiar
Niko Alpianyah
Jeri Ripkih
Moh Yasin Arip. S
Thoriq Aufaa Ahdan
Syahrul Tamam

PEMERINTAH PROVINSI JAWA BARAT


DINAS PENDIDIKAN
SMK NEGERI 1 JAPARA
Jl. Raya Puskesmas Kec. Japara Telp/fax. (0232) 616363– Kuningan 45555
Website: www.smkn1japara-kng.sch.idEmail : info@ smkn1japara-kng.sch.id
2021
VALIDITY SHEET

BENGKEL DD MOTOR ANCARAN


Jl. RE. Martadinata No.2, Ancaran, Kec. Kuningan, Kabupaten Kuningan, Jawa Barat 45514

Has been checked and validated on:

Kuningan, 10 November 2021

Leader, Advisor

Dadi Sutardi Ikin

ii
SCHOOL CERTIFICATION SHEET

Has been checked and validated on:

Kuningan, 10 November 2021

Head of Skills Competence Advisor


TKRO

Vini Deliana, S.T. Vini Deliana, S.T


NIP. NIP.

Knowing,
Principal of SMK Negeri 1 Japara

Ibnu Udy Prasetyo, M.Eng


NIP. 19670507 199403 1 011

iii
THE IDENTITY OF THE BUSSINESS WORLD

1. Company name : DD MOTOR ANCARAN


2. Company's address : Jl. RE. Martadinata No.2, Ancaran
Kec.Kuningan
: Kabupaten Kuningan, Jawa Barat 45514
3. Phone number :-
4. Company Email :-
5. Leader Name : Dadi Sutardi
6. Name of Company Advisor : Ikin
: Solihin
: Abdul

Kuningan, 10 November 2021


Leader,

Dadi Sutardi

iv
FOREWORD
All praise and thanks be to Allah SWT, who has bestowed His grace and
guidance to all of us. So that the compiler can make a report and the compiler is
also aware that there are still many shortcomings in this Industrial Work
Practices Report (PRAKERIN). However, the authors have tried their best for the
perfection of the preparation of this report, both from the results of teaching
and learning activities in schools, as well as in carrying out work practices in the
industrial world. Constructive suggestions and criticisms are expected by the
authors for perfection in writing the next report.
On this occasion, the authors would like to thank all those who have assisted in
the preparation of this Industrial Work Practice Report, including:
1. Mr. Ibnu Udy Prasetyo, M.Eng as Principal of SMKN 1 JAPARA
2. ms. Vini Deliana, S.T. As the head of TKRO Expertise Competen
3. Mr. Dadi Sutardi as DD MOTOR ANCARAN Workshop Leader
4. All friends who have helped create this report
5. My beloved parents who never stop fighting and giving encouragemen
and praying for the writer.
Finally, the authors hope that this report can be useful for readers and can help
for the progress and development of SMK Negeri 1 Japara. Once again, the
authors say many thanks to all those who have helped, may Allah SWT repay all
of your kindness. Amen.
Kuningan, 10 November 2021
Compiler

All friends

TABLE OF CONTENTS

v
WORKSHOP APPROVAL SHEET ............................................................................... i
SCHOOL CERTIFICATION SHEET ............................................................................. ii
STUDENT IDENTITY ............................................................................................... iii
BUSINESS WORLD IDENTITY ..................................................................................
iv
FOREWORD ............................................................................................................ v
TABLE OF CONTENTS ............................................................................................ vi
ABSTRAK ..............................................................................................................
vii
CHAPTER 1 INTRODUCTION
A. BACKGROUND ............................................................................................ 1
B. OBJECTIVE OF INDUSTRIAL WORK PRACTICES (PRAKERIN) ........................ 1
C. REASONS FOR SELECTING PRACTICE PLACE ............................................... 1
CHAPTER 2 SPECIAL DESCRIPTION
A. THEORY DESCRIPTION OF THE IGNITION SYSTEM IN KIJANG CARS .......... 3
B. ANALYSIS AND DAMAGE ........................................................................... 9
C.TOOLS AND MATERIALS ............................................................................. 9
D. WORK STEPS ............................................................................................
10
CHAPTER 3 CLOSING
A. CONCLUSION ........................................................................................... 11
B. REFERENCE .............................................................................................. 11
C. APPENDICES .............................................................................................
11

vi
ABSTRAK
Writing this final project report aims to determine the components and
functions of components, know specifications, can understand how it works and can
explain how to care for a conventional ignition system on a Kijang car.

The analysis of the existing data can be concluded from the results of the inspection of
the conventional ignition system components on the Kijang car that it is still within the
specifications or has to replace components.

Inspection of components includes checking battery voltage, checking spark plug gap
gap, checking spark plug flame jump distance, checking ignition coil resistance. Toyota
Kijang conventional ignition system service.

Keywords: Conventional ignition system on toyota kijang 5k

vii

You might also like