You are on page 1of 1

VIMAL MOULDERS INDIA PVT. LTD. Doc.No.

:VMIPL/F/QAD/09
Rev.No.:00
FIRST/LAST PART APPROVAL INSPECTION REPORT Effect :20.12.2020

Raw Material &


PART NAME :
Grade

PART NO. : Master Batch -

CUSTOMER : M/C NO.

FPA Date -
SAMPLE STATUS
S. NO. DESCRIPTION SPECIFICATION INSPECTION METHOD Remarks
X1 X2 X3 X4 X5 OK/NG
A Moulding Defects
1 Short fill Not allowed Visual
2 Flash Not allowed Visual
3 Warpage Not allowed Visual
4 Shrinkage Not allowed Visual
5 Ejector impression Not allowed Visual
6 Burn marks Not allowed Visual
7 Silver marks Not allowed Visual
8 Crack Not allowed Visual
9 Scratches Not allowed Visual
Bosh Broken ( Boshes should
10 be as per Limit Sample & Broken Not allowed Visual
drawing) 1
Part colour should be match
11 Colour 2 with Master sample Visual

Weight

Weight (As per standard) Weight Machine

Dimensions

LPA
Raw Material
Master batch Date -
& Grade

A Moulding Defects

1 Short fill Not allowed Visual

2 Flash Not allowed Visual

3 Warpage Not allowed Visual

4 Shrinkage Not allowed Visual

5 Ejector impression Not allowed Visual

6 Burn marks Not allowed Visual

7 Silver marks Not allowed Visual

8 Crack Not allowed Visual

9 Scratches Not allowed Visual


Bosh Broken ( Boshes should
10 be as per Limit Sample &
1
Broken Not allowed Visual
drawing)

Part colour should be match


11 Colour 2 with Master sample Visual

Weight
Weight ( As per standard weight
sheet)

Dimensions

C Packing Check Point

1 Packing Visual

Rev. No. Rev. Date Rev Detail.


1 06.03.2021 Bosh Broken Check point added in Checkpoint No. 10 of FPA /LPA against customer Complain.

2 19.03.2021 colour check point added in checkpoint No. 11 against inhouse colour mismatching complain at Assy line.

Prepared By:- Approved By:-

You might also like