Mechanical BoQ.

Item Description Qty Unit Unit Total Amount


Rate U.S Dollar

Mechanical And Plumbing Works

General Notes For All Mechanical And Plumbing Works


All the BoQ articles comprise supplying manpower, machinery, equipment, transportation all
1 necessary requirements to get the work done properly regardless of it's mentioned in the BoQ
articles or not.
All the BoQ articles must be carried out according to guidelines of Iraqi Technical Specifications
2 with updates And International Standard
The price includes all required materials, fittings , accessories , tools , machines , instruments,
labor works with all the requirements, installation , testing and commissioning and put in
operation to get the system work properly as per international specifications , and Iraqi regulations
3 to complete the works as stated in the contract items , design drawings , details and complete the
work in all aspects.

Supplying of materials shall not be done before obtain approval on the materials type, Brand , Color
4 also the contractor should provide certificate of origin and tests result certificate for the supplied
materials
The Contractor should Submit Builder Drawing, Shop Drawing , Coordination Drawings and Obtain
8 approval on it before start any Works in the site.
9 The Contractor should submit as built Drawings for all the works
The Contractor should Submit Material Submit for all the items mentioned in the BoQ , and Obtain
approval on it before supplying any materials , and materials submittal shall include all technical
10 data sheet , Compliance statement to Iraqi standard , specifications .

The Final Location , color , brand of All Equipment's should be coordinate and approved by
11 Engineer

Heating , Ventilations and Air Conditioning Works

General Notes for HVAC Systems


The price to be quoted in the bill will be the full inclusive cost of the work specified and will include
all items and required to complete the work fully in compliance with the requirements., Such as
Volume Control Dampers , split damper , fire damper , Support , insulation , sound attenuators ,
foundation ,...etc.

Bill of quantities will be read in Conjunction with all relative as a whole.


All the items written in this section will be complete according to specification and as shown on
drawings.
The Contractor should Take in his consideration the Following :
- Submit for approvals all submittals, samples, shop drawings, inspection and the like.
- Testing and commissioning.
- Builder's work in connection with the electrical installation, including all sleeves, fire resistant
sealant etc.
- Maintenance of complete installation as specified.

Supply, install, test and commission on the following items including connection to ductworks,
refrigeration pipes, electrical connection, thermostats, controls , drain pipes, fixing in position,
complete with all needed.

The Contractor should submit ESP calculations for approval for All HAVC Units ( Ducted Concealed ,
Package Unit , Fans , Energy Recovery Units , Pressurization Fans ,…etc. .) and shall not start any
supplying for any item without approval on these Calculations.

HVAC Ductwork complete with, Volume control damper For all branch ,turning vanes, stiffeners,
splitter dampers, test holes, branch, openings, etc.
All air Outlets and Dampers should be Flowtech - UAE origin ( Grill , Diffusers, Volume control
damper , fire Damper , Motorized Damper , Slot linear diffuser , Bar grill, Louver , sand trap ,..etc. .)

Total Carried To Collection U.S Dollars 0

Page 1 of 3
Mechanical BoQ.

Item Description Qty Unit Unit Total Amount


Ref. Rate U.S Dollar

Supply, install, test and commission Decorative split Invertor AC units and shall be reversible cycle
(heat pump) Split units Systems with Capacities as mentioned below , Tosot , complete with all
connection to refrigeration pipes, electrical connection, thermostats, controls , drain pipes, fixing in
position, flexible connection to duct,..etc.. , the Ducting size , air Outlet ,... etc. should be design
according to ASHARE and SMACNA Instruction , and the final color and shape and location of the
Air Outlet should as per Site Engineer's instructions.

1.1 Indoor /outdoor AC unit 18 MBH - Decorative split - Wall Mounted 5.0 No.
1.2 Indoor /outdoor AC unit 24 MBH - Decorative split - Wall Mounted 2.0 No.
1.3 Indoor /outdoor AC unit 24 MBH - Decorative split - Cassette type 1.0 No.
1.4 Indoor /outdoor AC unit 36 MBH - Decorative split - Cassette type 4.0 No.
1.5 Indoor /outdoor AC unit36MBH - Decorative split -Ducted type for swimming pool 1.0 No.
Dehumidefire for swimming Pool , the work include submit calculation for Dehumidifier and obtain
1.6 approval from engineer before start any supplying or work. 1.0 No.

Ventilation
Supply and install fans as specifications and as shown in the drawings and complete with all
needed. 0

2.1 Ceiling Exhaust Fan EXF-01 - 50 CFM @ 50 pa 7.0 No.


2.2 Inline Exhaust Fan 100 Cfm @75 pa 1.0 No.

2.3 Flexible Duct 6" 10.0 M.l


2.4 GI duct Gage 24 30.0 M2

Plumbing Works

Water supply installation


The work consist of PP-R water supply piping including all valves ,fitting accessories ,connection and
test from ground water tank to roof pump and from roof to pump up to inlets in the building as
shown in the drawing and local authority requirements.

Packaged cold water lifting pump set 32 IMP.GPM @ 25 M Head comprising one duty and one
standby pumps including all pipework, interconnections, valves, drains and electrical connections
1 as detailed in the specification and shown on drawings. 1.0 Set

Supply and install Insulated Pressed Sectional GI tanks 3.0X1.0X1.0 With insulation 20-30 MM as
specification and Site engineer instructions and shown on the drawings ,complete with all
2 connection, inlet, outlet, vent and cover, shaded, , etc. … all as specification and shown on the 1.0 No.
drawings .

Supply, install, connect and test for Booster Pump Set ( 1.4 l/s @ 20 M head ) one duty and one
stand by ,complete with piping system, valves ,strainer, electrical panel and electrical connections,
3 steal base plate and Alum. Louvered box for pump protection, complete as specification and 1.0 Set
drawings.

Supply, install, connect and test Hot Water Circulation Pump Set (0.35 l/s @ 15 m head) one duty
and one stand by ,complete with piping system, valves ,strainer, electrical panel and electrical
4 connections, steal base plate as specification and drawings. 1.0 Set

Supply, install, connect and test Electrical Heater (400 liter , 3kw ) according to standard
specification ,complete with piping system, Safety valve s, valves ,strainer, electrical panel and
5 electrical connections, steal base as specification and drawings. 1.0 No.

Supply, install, connect, insolate and test PPR for cold and hot water system including all fittings
and valves , Insulations according to the Standard Specifications , accessoieries and support 0

7 PPR pipe PN20 (20mm) 1.0 Item


8 PPR pipe PN20 (25mm) 1.0 Item
9 PPR pipe PN20 (32mm) 1.0 Item
10 PPR pipe PN20 (40mm) 1.0 Item
11 PPR pipe PN20 (50mm) 1.0 Item

Water meter as shown in the drawing complete with water meter chamber , valve , accessories
12 ,..etc. 1.0 no.

Total Carried To Collection U.S Dollars 0

Page 2 of 3
Mechanical BoQ.

Item Description Qty Unit Unit Total Amount


Ref. Rate U.S Dollar

Drainage System
Construct solid blocks Sewerage manhole complete with waterproofing and 40x40 cm Heavy duty
1 cover 40x40 cm as shown on the drawings. 1.0 no
Construct solid blocks Sewerage manhole complete with waterproofing and 60x60 cm Heavy duty
2 cover 60x60 as shown on the drawings. 4.0 no
Construct Gully trap manhole complete with waterproofing and 30x30 cm Heavy duty cover 30x30
3 as shown on the drawings. 2.0 no
Construct Pressure manhole complete with waterproofing and 60x60 cm Heavy duty cover 60x60
4 cm as shown on the drawings. 1.0 no
Construct solid block cesspol according to muncipilaty's Instructions complete with all connection,
5 inlet, outlet, vent and cover, etc … with dimesnions as shown in the drawings 1.0 No.
supply,install,connect and test internal drainage system (soil, waste ,vent) from UPVC pipes and
fittings from all sanitary fixtures upto manholes including all pipes and fittings as specified and as
shown on drawings.

6 Upvc pipe PN16 (2 inch) 70.0 M.l


7 Upvc pipe PN16 (3 inch) 80.0 M.l
8 Upvc pipe PN16 (4 inch) 120.0 M.l
9
Supply ,install ,connect and test floor drain trap with chrome platted, brass cover & strainer with all
10 needed clean out points as specified and as shown on the drawings. 8.0 No.
Supply ,install ,connect and test floor Clean out with chrome platted, brass cover & strainer with all
11 needed clean out points as specified and as shown on the drawings. 2.0 No.
Supply ,install ,connect and test Clean out with chrome platted, brass cover & strainer with all
12 needed clean out points as specified and as shown on the drawings. 4.0 No.
Supply ,install ,connect and test balcony drain 100x100 x 3inch with chrome platted, brass cover &
13 strainer with all needed clean out points as specified and as shown on the drawings. 1.0 No.

Supply ,install ,connect and test rain water outlet RWO 200x200 x 4inch with chrome platted, brass
14 cover & strainer with all needed clean out points as specified and as shown on the drawings. 2.0 No.

Supply ,install ,connect and test rain water outlet RWO 100x100 x 3inch with chrome platted, brass
15 cover & strainer with all needed clean out points as specified and as shown on the drawings. 1.0 No.

Fixture :

Install ,connect and test the below mentioned fixture complete with all required works and
accessories , Mixer , angle valves , flexible pipe , bottle trape , pipes,...etc , to connect it to the
water supply and drainage networks and as specified and as shown on the drawings.

The Fixtures and Mixers should be Supplied By Owner , the Contractor to supply all required
accessories , Piping , Valves ,..etc.

16 Wash Basin 5.0 No.


17 Shower 2.0 No.
18 Bath Tub 2.0 No.
19 Kitchen Sink 1.0 No.
20 WC 5.0 No.
21 Hand Spray 5.0 No.

FIRE PROTECTION WORKS


Portable Extinguishers 0
1 Co2 extinguisher (2Kg) 2.0 No.

Total Carried To Collection U.S Dollars 0