You are on page 1of 1

9/27/21, 11:07 AM Segment Cage Checklist

Edit Segment Cage Checklist Back

Project: RRTS-P3L1- RRTS-Miscellaneous works Version: 1.0

Client: National Capital Region Transport Corporation

Contractor:L&T Construction(Infrastructure IC) FORMAT: NCRTC/PKG P3 L1/L2/QC

Site/Location: SPMN Station Yard: YardOne Mould: B Date: 13/09/2021

Span ID: P268-293 Segment ID: P268-293-S1-01

Drawing No: AZ1829030

SEGMENT CAGE REINFORCEMENT CHECKLIST


Status
Items to be checked Remarks
Yes No NA
Is drawing status good for
construction
Rebar dimension(dia, length
and shape)
Position and spacing of
bars checked
Provision of earthing T-20
bar at the upper portion of
the Segment

Action By On Attachment General Remarks Signature

Generation Site Egr 13/09/2021 12:16

Planning Manager
Project Mgr 13/09/2021 13:30
Approval

QC Manager
Quality Mgr. 13/09/2021 13:31 SegmentCageChecklist_02_triple_save.pdf
Approval

Client Approval Client Mgr 13/09/2021 13:31

125.18.139.17/SegmentCageChecklist/Edit/33 1/1

You might also like