PACKAGE SYSTEM UPGRADES

PREPARED FOR:

PETROCI CI 11 LTD
at

GULF TIDE

Submitted on Jan 20th, 2021 by:

Camille Akoun

Solar Turbines Inquiry Number WA21-32644_1

Solar considers the information included in this proposal to be confidential. As such, this proposal is submitted subject to the terms and conditions regarding
"CONFIDENTIALITY". None of the information included in this proposal shall be disclosed to any non-customer employee, unless they agree to be bound by the
CONFIDENTIALITY agreement between Solar and PETROCI CI 11 LTD. Under no circumstances should any part of this proposal leave PETROCI CI 11 LTD offices.

Caterpillar is a registered trademark of Caterpillar Inc. Solar, Titan, Mars, Taurus, Mercury, Centaur, Saturn, SoLoNOx, and TurbotronicTM are trademarks of Solar Turbines
Incorporated. Specifications are subject to change without notice. ©2020 Solar Turbines Incorporated. All rights reserved.

Caterpillar: Confidential Green


WA21-32644 - Installation

Centaur 40 Compressor Set

TABLE OF CONTENTS
1.0 INTRODUCTION .......................................................................................................................................... 3
1.1 PRICE BREAKDOWN .............................................................................................................................. 3
1.2 PROJECT BENEFITS ................................................................................................................................ 4
2.0 COMMERCIAL ............................................................................................................................................. 5
2.1 PROJECT TIMELINE ................................................................................................................................ 5
2.2 PAYMENT MILESTONES ....................................................................................................................... 5
2.3 PURCHASE ORDER ISSUANCE GUIDELINES .................................................................................... 6
3.0 TECHNICAL .................................................................................................................................................. 7
3.1 SOLAR TURBINES SCOPE OF SUPPLY ............................................................................................... 7
SITE INTEGRATION (Base Scope) .......................................................................................................... 7
PROJECT DOCUMENTATION................................................................................................................ 7
3.2 CUSTOMER SCOPE OF SUPPLY ........................................................................................................... 8
SITE INTEGRATION ................................................................................................................................ 8
3.3 ROLES AND RESPONSIBILITIES TABLES .......................................................................................... 9
INSIDE TURBOMACHINERY PACKAGE AND CONTROL CONSOLE ............................................ 9
BALANCE OF PLANT .............................................................................................................................. 9
4.0 TERMS AND CONDITIONS ...................................................................................................................... 10

Inq No: WA21-32644_1 Page 2


Confidential: Do Not Forward Without Solar's Written
Approval
WA21-32644 - Installation

Centaur 40 Compressor Set

1.0 INTRODUCTION
Solar Turbines has prepared the following proposal in response to your requirements. This proposal, as applied to the
packages listed below, has been established using specific knowledge provided by the Customer Services Account
Manager and information available in our records.

PACKAGE SERIAL ENGINE SERIAL PACKAGE MODEL PACKAGE TYPE CUSTOMER TAG
NUMBER (PSN) NUMBER (ESN) NUMBER (TAG)
WG2516 OHI18-C8844 Centaur 40 Compressor Set

1.1 PRICE BREAKDOWN


The Price Breakdown table shows the proposed upgrades that meet the technical requirements of your project.

Pricing valid to 28-february-2020

SELL PRICE
(USD)
BASE SCOPE
Site Integration: Consultant Service as defined in 3.1 $85,000.00
Lump sum for:
One (1) mobilization for site survey (including travel)
Up to 80 hours of remote assistance

GRAND TOTAL $85,000.00

* Prices do not include sales, use or excise taxes, import or export duties, special financing fees, value added taxes,
income or royalty taxes, consular fees, special permits or licenses or similar charges (collectively, "taxes").

Inq No: WA21-32644_1 Page 3


Confidential: Do Not Forward Without Solar's Written
Approval
WA21-32644 - Installation

Centaur 40 Compressor Set

1.2 PROJECT BENEFITS


The solutions presented below meet the technical requirements of your project and are designed to be compatible with
your existing turbomachinery configuration. These solutions also meet Solar's current level of safety standards and have
been developed under Solar's life cycle support strategy.

Site Integration
Solar Turbines offers worldwide, regionally based, pre-installation consultation for package system upgrade or controls
system retrofit projects. The purpose of Site Integration is to work with Customer and contractors to develop a field
execution plan to ensure the smooth installation of the project work scope in an effort to minimize turbine
downtime. Solar utilizes highly trained and experienced Field Project Engineers (FPE) to provide this consultation
services.

Solar gas turbines, compressors and control system are designed and built to run for decades in applications critical to oil
and gas, power generation, and other industrial and manufacturing facilities. As technology has continued to
advance, Solar has been there to support its customers with the latest in control system retrofits and system upgrades.
These renewal projects are inherently complex, requiring the decommissioning of old systems and subsequent installation
of new mechanical, electrical and controls hardware. To reduce costly disruptions, Site Integration offers a focal point of
contact to assist in achieving a successful completion of the purchased upgrade. Also included is on-site support to help
coordinate the work your electrical, mechanical, and lifting and rigging contractors will be doing with the Solar installation
crew.

The scope includes creating project specific Contractor Work Scope documentation that will be provided to guide
installation contractors. You will receive the work scope document during the engineering phase of the project. The
document will include instructions on what needs to be done to support the installation of the upgrade for off-skid wiring
requirements, on-skid and off-skid interface points and your contractor(s) scope of work. The objective is to have your
contractor's scope approximately 85% complete prior to the arrival of the installation team. The Site Integration is a full
service but is also scalable.

The Assessment provides a Site Assessment document reviewing the assessment for integration of the upcoming
controls upgrade. A site visit will be needed.

The Consultant Service provides a Contractor Work Scope document and contractor meeting. This planning meeting
occurs when the contractors are ready to review their work scope as described in the work scope document. The FPE will
also help to plan and schedule resources as necessary and will walk through all aspects of the project, discussing the
tasks to be performed with the relevant parties.

Inq No: WA21-32644_1 Page 4


Confidential: Do Not Forward Without Solar's Written
Approval
WA21-32644 - Installation

Centaur 40 Compressor Set

2.0 COMMERCIAL
The following items are discussed in this section:

• Project Timeline
• Payment Milestones
• Delivery Terms
• Purchase Order Issuance Guidelines

2.1 PROJECT TIMELINE

Project Management will develop a specific project timeline after receipt of a purchase order. The timeline may be
affected by the following:
• Change orders
• Technical complexity
• Customer observation of the Factory Pre-Commissioning will be agreed by all parties after receipt of order. Project
manager will make confirmation of testing and delivery after receipt of order.

2.2 PAYMENT MILESTONES

• 40% at order
• 60% at completion of FPE tasks
• Payments are due NET 30 days from date of invoice. Open account terms are subject to Seller's credit review and
approval. If open account payment is approved by Seller, all payments shall be due net thirty (30) days from the date of
Seller's invoice. In the event open account is not approved, at Seller's option, payment shall be made by commercial
letter of credit, in an approved format and with a bank acceptable to Seller, or by wire transfer prior to the release of any
goods for shipment.

Please be advised that Solar Turbines rarely changes bank accounts. In the event that someone at your company
receives such a notification or any other communication claiming to be from Solar Turbines and purporting to change
payment instructions, we strongly urge you to take all steps necessary to verify that the communication is genuine.

Inq No: WA21-32644_1 Page 5


Confidential: Do Not Forward Without Solar's Written
Approval
WA21-32644 - Installation

Centaur 40 Compressor Set

2.3 PURCHASE ORDER ISSUANCE GUIDELINES

Purchase Orders should include references to:


• Purchase Order Number
• Addresses
- Bill To
- Ship To
- Installation Site
- Sold To
• Purchase Order Issue Date and/or Revision
• Solar Turbines Entity
• Solar Inquiry Number and Date of Proposal
• Summary of Scope of Supply
• Purchase Price
• Agreed upon Delivery IncoTerms and Customer Need Date
• Reference to Terms and Conditions
• Agreed upon Payment Terms
• Intermediate Consignee and Freight Forwarder (if required)
• Customer Invoice Instructions

Inq No: WA21-32644_1 Page 6


Confidential: Do Not Forward Without Solar's Written
Approval
WA21-32644 - Installation

Centaur 40 Compressor Set

3.0 TECHNICAL
The following items are discussed in this section:

• Solar Turbines Scope of Supply


These upgrades are proposed solutions that meet the technical requirements of your project.
• Customer Scope of Supply
Turbomachinery package utilities required for the proposed upgrades. These package utilities are typically related to
fuel quality, working fluid (air, gas, water, oil) quality, mechanical space requirements, electrical power requirements,
wiring and cabling.
Specific Customer documentation required for project execution.
• Roles and Responsibilities Tables
These tables define the scope of responsibility for installation and re-commissioning activities.

3.1 SOLAR TURBINES SCOPE OF SUPPLY

SITE INTEGRATION (Base Scope)

The Consultant Service provides a Contractor Work Scope document and contractor meeting. This planning meeting
occurs when the contractors are ready to review their work scope as described in the work scope document. The FPE will
also help to plan and schedule resources as necessary and will walk through all aspects of the project, discussing the
tasks to be performed with the relevant parties. This planning meeting will typically last two days.

FPE Tasks:
• Definition of Special Tooling Required
• Identification of On-Skid and Off-Skid Modifications
• Clarifying New Hardware Locations
• Cable and conduit schedule/routing recommendations
• Review inventory and order any missing/damaged components
• Stage the inventory in the best location for the Solar Installation team.
• Review Customer pre-work for completeness

Out of Scope
• The FPE does not perform demolition, assembly or other mechanical services
• Re-commissioning is not included with the SI. The local District office should be contacted for Commissioning Support

PROJECT DOCUMENTATION

Solar Turbines goal is to provide a set of project documents that are accurate and timely. Documents are issued for
reference only; they are not subject to review or approval by the Customer.

Inq No: WA21-32644_1 Page 7


Confidential: Do Not Forward Without Solar's Written
Approval
WA21-32644 - Installation

Centaur 40 Compressor Set

3.2 CUSTOMER SCOPE OF SUPPLY

SITE INTEGRATION

The following will be required to support detailed equipment assessment:


• Safety Orientations
• Pre-Inspection Meeting
• Provide reasonable security and protection for all persons, property and equipment employed or used by Solar during
the meeting
• Assist Solar in obtaining access to toads, plant of production facilities, and the like which are necessary during the
meeting
• Assist Solar in obtaining any necessary permits, licenses, or authorizations necessary during the meeting
• Documentation:
- Electrical on-line diagram (ELS)
- Completed Generator Data Sheet (reference the project ACS, if applicable)
- Process and Instrumentation Diagram (P&ID)

Inq No: WA21-32644_1 Page 8


Confidential: Do Not Forward Without Solar's Written
Approval
WA21-32644 - Installation

Centaur 40 Compressor Set

3.3 ROLES AND RESPONSIBILITIES TABLES

The Roles and Responsibilities tables below define the scope of responsibility for installation and re-commissioning
activities. These tables are typically reviewed as part of the Pre-Installation Meeting with the goal of reaching mutual
agreement between Solar and Customer. The legend below applies to the following tables.

PARTY DEFINITION
Customer Provided by Customer
Solar Provided by Solar
Customer & Solar Shared responsibility between Customer and Solar
N/A Not applicable

INSIDE TURBOMACHINERY PACKAGE AND CONTROL CONSOLE

This table is a list of activities that are performed within the turbomachinery package and control console. The activities
are related to the scope of supply described in this section, and are specific to the PSN(s).

Ref Activities Documentation Installation Installation Note


Supervision Labor

BALANCE OF PLANT

This table is a list of activities that are done outside the Turbine Package and Turbine Control Panel, but within the
systems battery limits. The activities are specifically related to the scope of supply described in this section. As an
example, a Solar supplied electrical device that is powered and monitored by the Turbine Control Panel but is installed in
the Motor Control Center (MCC) is considered balance of plant equipment. A Solar valve installed on a pipe valve skid
that is controlled and monitored by the Turbine Control Panel is another example of balance of plant equipment.
Generally, installation activities of such devices fall within the customer's responsibility unless indicated otherwise in the
table.

Ref Activities Documentation Installation Installation Note


Supervision Labor

Inq No: WA21-32644_1 Page 9


Confidential: Do Not Forward Without Solar's Written
Approval
WA21-32644 - Installation

Centaur 40 Compressor Set

4.0 TERMS AND CONDITIONS

Reference Solar Turbines Terms and Conditions form 9968a.pdf

Inq No: WA21-32644_1 Page 10


Confidential: Do Not Forward Without Solar's Written
Approval
WA21-32644 - Installation

Centaur 40 Compressor Set

Inq No: WA21-32644_1 Page 11


Confidential: Do Not Forward Without Solar's Written
Approval
WA21-32644 - Installation

Centaur 40 Compressor Set

Inq No: WA21-32644_1 Page 12


Confidential: Do Not Forward Without Solar's Written
Approval
WA21-32644 - Installation

Centaur 40 Compressor Set

Inq No: WA21-32644_1 Page 13


Confidential: Do Not Forward Without Solar's Written
Approval
WA21-32644 - Installation

Centaur 40 Compressor Set

Inq No: WA21-32644_1 Page 14


Confidential: Do Not Forward Without Solar's Written
Approval