Contractor:Bekele Burusa GC
AMOUNT(BIRR)
As per the attachement the value of the work executed and/or material supplied todate is Birr 4,620,246.91
Six hundred Sixty one thousand two hundred fifty seven birr and 85/100 cent
Prepared by Approved by
1st payment certificate
Date of cont Agreemnet: April 16th 2021 G.C
AMOUNT(BIRR)
As per the attachement the value of the work executed and/or material supplied todate is Birr 441,605.44
Four hundred eithy five thousand & seven hundred sixty five birr and 98/100 cent
Prepared by Approved by
WALDA IJAARSA ABRAHIM, DURRI FI SHARIKOOTA
Abrahim, Duri and Friends’ Construction Union
AMOUNT(BIRR)
As per the attachement the value of the work executed and/or material supplied todate is Birr 441,605.44
Four hundred eithy five thousand & seven hundred sixty five birr and 98/100 cent
Prepared by Approved by
BILL NO-01 SUMMERY OF CHEETAH ENCLOSURE FENCE WORK
SPECIFICATION & BILL OF QUANTITIES CHEETAH ENCLOSURE FENCE AND YARD PREPARATION
Project: - CheetahEnclosure Beeding and Fence and Yard Preparetion
Clients: - Haramaya University
Consultant: - Najim Architectural Engineering and Consultancy
Contractor: - Abrahim, Duri and Friends Construction Unions
Project :- Improvement Of University Zoo
Location :- Haramaya University Ethiopia
Item Executed Amount
Description of Works Contract Amount
No Previous Current Total
A-SUB STRUCTURE
1 Excavation and Earth Works Birr 57,253.50 - 68,641.10 68,641.10
2 Concrete Works Birr 95,826.20 - 46,495.05 46,495.05
3 Masonry Works Birr 430,000.00 - 228,800.00 228,800.00
Sub Total A Birr 583,079.70 - 343,936.15 343,936.15
B. SUPER STRUCTURE
O1 Plastering and Pointing Birr 38,700.00 - 21,375.00 21,375.00
O2 STEEL Birr 667,740.00 - 48,883.50 48,883.50
Sub Total B Birr 706,440.00 - 70,258.50 70,258.50
Total A + B Birr 1,289,519.70 - 414,194.65 414,194.65
Vat 15% Birr 193,427.96 - 62,129.20 62,129.20
Grand Total Birr 1,482,947.66 - 476,323.84 476,323.84
Project : - IMPROVEMENT OF HARAMAYA UNIVERSITY ZOO
Bill No. 03 - 1
CHEETAH ENCLOSURE BEDDING
SUMMARY
A-SUB STRUCTURE
B. SUPER STRUCTURE
5 Joinery
a) dia 12 Ml 0.00 -
b) dia 10 Ml 0.00 -
c) 5x7 wooden purlin Ml 0.00 -
30x2.5 cm facia board neiled on structural parts of the roof. Price
5.3 Ml 0.00 -
shall include 3 coats of wood paint.
SUB TOTAL CARRIED TO SUMMARY BIRR 0.00
04/ STEEL STRUCTURES
RHS supported and pully operated Steel gates.
Locks shall be provided bottom, middle and top of gates
O71 Cement mortar pointing to all exposed stone masonry elevation walls. M2 39.00 120.00 4,680.00
O114 Supply and install Galvanized steel pipes to internal water 0.00
distribution system as shown on the drawing. Complete 0.00
with all the necessary fittings and accessories. 0.00
Dia. 20 mm ml 54 500.00 27000.00
" 25 " ml 32 600.00 19200.00
" 32 " ml 128 700.00 89600.00
0.00
0.00
O115 Gate valves 0.00
Dia. 20 mm No 3 500 1500.00
" 25 " No 1 600 600.00
" 32 " No 2 700 1400.00
SUB TOTAL CARRIED TO SUMMARY BIRR 168,280.00
Project :- Improvement Of University Zoo
Location :- Haramaya University Ethiopia
BILL NO>-03-1
SPECIFICATION & BILL OF QUANTITIES FOR CHEETAH ENCLOSURE BEDDING
Item
Description of Works Unit Qty. Unit Price Sum Total
No.
A. SUB STRUCTURE
Previos This Todate
Excuted Period Excute
03/ ROOFING WORKS
O34 Suply and install diam. 110 down pipe M2 30.00 200.00 6,000.00
O35 Supply and fix G-28 Flat metal sheet Gutter M2 19.60 400.00 7,840.00
a) dia 12 Ml 0.00 -
b) dia 10 Ml 0.00 -
c) 5x7 wooden purlin Ml 0.00 -
30x2.5 cm facia board neiled on structural parts of the
5.3 Ml 0.00 -
roof. Price shall include 3 coats of wood paint.
SUB TOTAL CARRIED TO SUMMARY BIRR -
04/ STEEL STRUCTURES
RHS supported and pully operated Steel gates.
Qty L/W/D Product Description & Sketches Qty L/W/D Product Description & Sketches
A - SUBSTRUCTURE
01/ Excavation & Earth Works 04/ MASONERY WORKS
1.1 Site clearing to top soil to a depth of 20cm 041) 25cm. Thick double brick wall foundation
1.00 1.00
with cement mortar 1:3 mix ratio below NGL.
960.00 1 82.00 L=115m-0.60m*52=82m
0.80
960.00 m² 65.60 m2
1.5 Trench excavation in ordinary soil to a depth
not exceeding 150cm. 042) Ditto but Above NGL
1.00 82.00
1.10 L=>115-0.6*55=82m 1.0 115.00 L=115m-55*0.08m=110.6m
0.80 0.60 avg. depth = 0.6m
72.16 m3 69 m2
1.7 Footing excavation in ordinary soil to a depth
not exceeding 150cm
16.00 1.10 L=>0.6+0.5=1.1m
1.10 B/ SUPER-STRUCTURE
1.10 04/ PLASTERING AND POINTING
A)Cement morter pointig to all exposed brick wall
21.30 m3
1.11 Back fill around brick wall.
2.00 82.00 2.00 115.00
0.425 0.60
0.80 138.00 m2
55.76 m3 138.00 m2
16.00 2.20 1.12 Ditto but around footing foundation. 1 115.00
0.25 L=>1.1*2=2.2m 0.25
1.10 28.75 m² for top of brick copping
9.68 m3 166.75 m² total
1.14 Cart away surplus excavated material to a
04/ STEEL STRUCTURES
1.00 distance not exceeding 5km from the site
192.00 m 3
a) Site Clerance 5 m high RHS of 80x80x3.5 mm thick bolted on
93.46 m3 b) pit excavation - 0.00 concrete pad with 2(250x250x8 mm) plates
65.44 m3 c) Backfill around the footihg 0.00 with 6Ø 20 mm J bolt
Kg =>wgt of rhs 42.04kg + wgt of plate 7.85kg +
220.02 m3 0.00 wgt of j bolt 8.88kg
TAKEOFF SHEET
PAGE ____
Qty L/W/D Product Description & Sketches Qty L/W/D Product Description & Sketches
A. SUB STRUCTURE C) Form Work
01/ Excavation & Earth Works to footing foundation 0.3*0.9*4=1.08
1.1/ Site Clerance 4.0 0.3
1.00 1.00 average depth d=0.20m 92.0 0.80
814.00 814.00 m² 88.32 m2
1.00 0.00 1.2/ Bulck Excavation 88.32 m2 ,TOTAL
0.00
0.00 0.00 Mild steel RC bar
0.00 m3 192.44 ø8 mm deformed bar
1.3/ pit excavation kg
a) in ordinary soil to average depth not
82.00 0.80 exceeding d=1.50m 572.58 ø10 mm deformed bar
0.80
1.00 52.48 0.4) Steel structure
b)detto but in weathered rock to depth
92.00
10.00 0.80 not exceeding d=1.50m 1.00 Erecting ø101.1x6 mm thick CHS post
0.80 59.60
0.90 5.76 5,483.37 kg
1.5 Back Fill
92.00 0.20 a) Around footing foundation
2.00
0.90 33.12
33.12 m3
1.00 1.14) cartaway surplus material
0.20 814.00 m3 a) Site Clerance
52.48 m3 b) pit excavation
33.12 m3 c) Back Fill
833.36 m3 Total
92.00 0.80 3.0 CONCRETE WORKS
A) 5mm thick lean concrete under footing
0.80 foundation
58.88 m2
b)C-25 Reinforced concret in footing
92.00 0.25 foundation
0.25
0.80 4.60 m3