Vinayak Developers Construction Work Check

Project Address Job Type Job # Prepared By


2-Storey House V.V.Nagar, Anand QA Engineer Supervision Devang Rathod
Work
Task
Brick masonry work of first floor
Bar cutting
Bar Bending
Lintel Formwork
Coping of Parapetwall
Curing of constructed structures
Materials Receiving
Equipment
Type Status
Sand Screening Machine In Use
Concrete Mixer In Use
Pick, shovel, wheelbarrow In Use
Plumb bob In Use
Vibrator Out of Order
Brick Towel, Wooden Float In Use
Materials
Type Used
Cement Yes
Sand Yes
Bricks Yes
Water Yes
Delivered
Type Scheduled
Cement 7:59 AM
Bricks 9:29 AM
Sand 10:00 AM
Concrete Mixer 9:29 AM
struction Work Checklist

Prepared By Date
15/2/22

Status
Doing
Done
Done
Done
Doing
Doing
Done

Status Hours
In Use 4
In Use 6
In Use 6
In Use 2
Out of Order
In Use 6

Used Remaining
Yes 6 Bags
Yes None
Yes 450
Yes 600 litres

Scheduled Actual
8:30 AM
10:14 AM
10:14 AM
9:29 AM