Professional Documents
Culture Documents
CONCRETE BEAM DESIGN (LRFD) BEAM MARK
B2 SHEET NO. OF
(FIXED END MOMENT) PREPARED BY : FDV
3.1 Load Factor
Roof Live Load = 0.6 Kpa Weight of Partition = 5.49 KN.m compression steel
Storey Live Load = 1.9 Kpa Weight of Beam = 1.92 KN.m a, where As=As1 As1 fy/0.85b f'c ‐ mm
Weight of Ceiling = 0 Kpa Weight of slab = 2.35 Kpa c ‐ mm
Floor Finish = 0.1 Kpa Weight of MEPHS = ‐ Kpa Mu1 = Mumax =ɸRu x b x d 2 ‐ KNm
Interior beam = 0 KN Concentrated Load = 15.36 KN Mu2 ‐ KNm
As2 =Mu2/(ɸ fy(d‐d')) ‐ mm2
3.1.1 Computation for Factored Loads check if the compression steel yields
Frame Grid : ‐ A's (bottom bars) f's 600((c‐d')/c) ‐ MPa
Tributary area under
Floor Level : f's>fy then use f's=fy, compression steel yields
consideration :
Direction : f's<fy then use f's, compression steel will not yield
Total no. of beams : ‐‐‐‐‐ therefore
Beam Member (Node to Node) : ‐‐‐‐‐ if compression steel will yield A's = As2 but when
Length of beam (L1) = 4.75 m adopt compression steel, Mpa ‐
Length of adjacent slab for tributary area L2 (short) = 3.00 m Sizes 5.00
(total length) L3 (long) = 3.50 m Nos.
b(beam)‐assumption = 0.20 m Area of rebars at midspan
d(beam)‐assumption = 0.40 m As 767.88 mm2
h (slab) = 0.100 m As (bottom bars) Sizes 5.00
Total WLL = 8.13 KN/m Nos. 4.00
Total WDL = 15.37 KN/m compression steel
a, where As=As1 As1 fy/0.85b f'c ‐ mm
c ‐ mm
Mu1 = Mumax =ɸRu x b x d2 ‐ KNm
MEMBER ‐‐‐‐‐ Mu2 ‐ KNm
BEAM MARK NO. ‐ As2 =Mu2/(ɸ fy(d‐d')) ‐
MWL ‐ KN‐m check if the compression steel yields
MEL ‐ KN‐m A's (top bars) f's 600((c‐d')/c) ‐ MPa
LL 8.13
KN/m f's>fy then use f's=fy, compression steel yields
DL 15.37 KN/m f's<fy then use f's, compression steel will not yield
LENGTH"L" 4.75
m therefore
Wu 1.2DL + 1.6LL 31.44 KN/m if compression steel will yield A's = As2 but when
Va (Wu L / 2)+((Ma‐Mb)/L) 74.68 KN adopt compression steel, Mpa ‐
x Va/Wu 2.38
m Sizes 5.00
MWu (WIND) WuL2 / 12 + PL/4 77.36 KN.m Nos.
MWu (SEIEMIC) WuL2 / 12 + PL/4 77.36 KN.m STIRRUPS
Mu(wind) 1.2DL+1.6LL+0.8WL 77.36 KN.m Vc 1/6 x sqrt f'c x b x d 60.35 KN
Mu(seismic) 1.2DL+LL+E 77.36 KN.m 0.5 x ɸVc 0.5 x 0.85 x Vc 25.65 KN
@ Support 77.36 KN.m 2/3 x sqrt f'c x b x d 241.38 KN
Design Moment
@ Midspan 59.12 KN.m Vu Reaction ‐ Wu*d 44.81 KN
f'c 20.50 MPa hence: Vu > 0.5ɸVc stirrups are needed
fy (stirrups) 225.00 MPa hence: Vs > "2/3 x sqrt f'c x b x d" beam size is adequate
fy (main reinforcement) 275.00 MPa Vn Vu/ɸ 52,711.92 N
b 0.200 m Vs Vn‐Vc 7,633.16 N
d 0.400 m use size of rebars 3.00
Beam size
d' 0.36
m Av 2 * cross sectional area of rebars 142.29 mm
cc 0.04
m S,spacing Av fy d / Vs 1,677.69 mm
β1 0.85
maximum spacing d/2 200.00
mm
ρbal (.85f'cβ1/fy) x (600/(600+fy)) 0.037 check spacing of main rebars material stresses
ρmax .75ρbal 0.028 concrete cover 40 mm f'c = 20.50 MPa
ρmin 1.4/fy 0.005 no. of bars per layer 3 ea fy=
ρactual =(.85f'c/fy) x (1‐(sqrt (1‐ 0.0107 min spacing 19 mm main 275.00 MPa
steel ratio
ρmin < ρactual ok diameter of main rebars 16 mm stirrups 225.00 MPa
ρactual < ρmax ok diameter of stirrups 10 mm
rebar design singly reinforced width of beam 200 mm
therefore adopt 0.0107 actual spacing 30 mm ok
Ru Mu/ ɸbd2 2.69
SUMMARY
b 0.200 m stirrups no. spacing
Area of rebars at support d 0.400 m 3.0 140 mm
As,As1 767.88 2
mm cc
As (top bars)
Ast 767.88 mm2 @ support no. pcs. @ midspan no. pcs.
Sizes 5.00
top bars 5 4 top bars 5 2
Nos. 4.00
bottom bars 5 2 bottom bars 5 4