Project :
2. Inspect the area if there is an existence of any electrical wiring at the wall to be dismantled that
3. Install a temporary support for the existing mezzanine floor using H-frame, pipes and wide flange to
carry over the weight of 360 kg per sq.m. Provide a steel base plate for the leg support to protect
the existing ground slab from crack due to punching shear of vertical support.
4. Check the area if there is a column supporting the existing mezzanine floor then inform it to the
structural engineer.
5. Before demolition, check the structures of the wall if it is a reinforced concrete wall, load bearing
wall or if there is any column found within the wall by chipping off to exposed partially using hand
tools then inform the structural engineer to verify the actual site condition if it supporting the
mezzanine floor.
6. During demolition, use only small chipping hammer and hand tools to dismantle the wall partially.
Also, frequently observed the area if there is any movement of existing structures affected by
demolition.
7. Often clean the area by removing all debris from dismantled walls.
Prepared by:
Structural Engineer