MAIN CONTRACT WORKS TO COMMERCIAL DEVELOPMENT COMPRISING OF A 49 STOREY OFFICE TOWER

AND A 5 STOREY SHOPPING MALL FOR HAVELOCK CITY AT COLOMBO-06, SRI LANKA

NON CONFORMITY REPORTS


Update 6-May-2021

Rectification Method Submission Clossing of NCR


NCR Date
Trade Location Level Description Date of issue Approval/Clo
No Document Type Number Approval Comments RICF Number Date
Submission Replied ssing of NCR

As discussed during our VC meeting


together with PTA,there is no skirting
indicated in our design proposal for the
1 ID Shopping Mall L-2 Lobby Tiling 19-Feb-2021 RFI CHEC-RICF-A-846-A 25-Feb-2021 5-Mar-2021 Not Approved
above mentioned areas.Kindly refer to the
No
attachment for the proposed florr to wall
termination details for CHEC to follow up

2 Civil Shopping Mall Hacking of Lift Wall-ST 03 22-Jan-2021 Metod Statement CHEC-RFA-S-1423-A 6-Mar-2021 15-Mar-2021 Approved with comments Use non shrin grout StoCrete NSG Eco No

3 ID Tower L23 Lift Lobby Tile 17-Feb-2021 N/A Defects has to be rectified and rearrange the inspection CHEC-RICF-A-T-087 14-Mar-2021 No

Not Accepted.Recomended thickness of CHEC-RICF-S-4431 28-03-2021


CHEC-RFA-A-S-1409-A 1-Mar-2021 3-Mar-2021 Rejected
plaster material is 20 mm maximum CHEC-RICF-A-P-089A 30-03-2021
4 Civil Tower L50 & Above External Plaster 8-Feb-2021 Metod Statement Yes
CHEC-RICF-S-4205A 02-04-2021
CHEC-RFA-A-S-1409-B 19-Mar-2021 24-Mar-2021 Information Only Recived.Hollow area should be repaired CHEC-RICF-A-P-092A 02-04-2021

5 Façade Shopping Mall Upper Roof Cinema 6-Steel Roof Structure 8-Mar-2021 N/A Rearrange the inspection and clarify with answering to the client email CHEC-RICF-A-CW-302 8-Mar-2021 Yes

5/6/2021 at 3:01 PM 1 of 1 QAQC Department _CHEC