You are on page 1of 1

The SMS Group Manufacturing Instruction SN200 (2016) has to

be followed unless the drawing contains special instructions.


The following is excluded: section 7, chapter 6
(all other chapters are relevant).
Main machine colors according to SMS CONCAST
equipment painting instruction (see below).

Printed by: GRJO on 10. January 2019 - Status: Released RE


For labelling, packing and other logistic aspects please refer to separate
SMS CONCAST instruction.

Welding
The SMS Group Manufacturing Instruction SN200 (2016) has to
be followed unless the drawing contains special instructions.
For stainless steel tempering colours are not allowed and must
be removed in and outside of any construction. Therefore constructions such as
pipes, tubes, vessels and closed structures must be pickled and flushed.

Equipment and piping painting 10'121'454


For painting and corrosion protection see painting instructions
and respective item indication on the material list,
unless the drawing contains different indications.

Inspection and Test Plan 10'079'528


For quality documentation and equipment tests refer to the
Inspection and Test Plan and
to all corresponding instructions issued by the engineering department.

Modell: 10000807924_IPT_000.ipt Modellversion: -

THIS DRAWING AND ALL INFORMATION THERE ON IS THE PROPERTY OF CONCAST AND IS CONFIDENTIAL AND MUST NOT BE MADE PUBLIC OR COPIED
UNLESS AUTHORISED BY CONCAST AND IS SUBJECT TO RETURN UPON DEMAND.
ALL RIGHTS RESERVED COPYRIGHT AS PER DRAWN DATE SHOWN IN DRAWING HEADER.
Workshop Instructions Section Weight Main Scale Format
specified on Material List ISO 128
0.000 KG 1:1 A4
Replaced by

Workshop Instructions Released

Approved
24.09.2018

21.09.2018
BOGU

OSAN

Drawn 18.09.2018 BOGU


Document No. Version

10'121'550 -
Sheet: 1 of 1
Material No.
SMS group
701744
CZH Old File Name: File Name: 10121550_DRF_000.IDW