You are on page 1of 1

Doc. No.

F-l-01
COMMISSIONING REPORT Rev. 0
OF CAGE HOISTS
Date: 2c. lDfl yZ_ Date: 01-06-2017

Plot No. 7608, Phase lV G.I.D.C., Vatva, Ahmedabad - 382 445. Phone : 079-2584 0513,2584 1915, 48900959
info@safexelectromech,com I www,safexelectromech.com

1 Customer 01/)
2 Address:
R eo fryc/ DL-

3 Customer P,O. No Date


4 Safex WO. No b C

5 Equipment : Playload 2 nr-,7 Kgs G+ 2: Floors Cage Hoist


5 Machine No.
6 The Equipment has been tested after installation
7.1 Test No load Test Test with Play load lDtrD xgs.l
7.2 Cage Movement o.K. \/ o.K.
-7 r)
/.J Landinq limit switch opertion o.K. \-/ o.K.
(level + 60mm upto 4mpm speed)
7.4 lnching Operation
7.5 Top limit switch operation
o.K.
o.K.
o.K.
o.K
V
\/
7,6 Bottom limit switch operation o.K. o.K.
7.7 Floor door mechanical interlocking o.K. Y o.K.
7.8 Floor door Electrical interlocking o.K. o.K.
7.9 Cage Door electrical interlocking (optional) o.K. \,/ o.K.
7.10 Gravity limit switch operation o.K. o.K.
t-ndic-a-'\t o fl
7.11 Over ail operation o.K. \,t o.K. Lc.cl ncr'\
rb
8 lnstallation & Commssioning of Equipment has been checked and found satisfactory.
The equipment is commissioned and handed over for use
use of hoist without commission & will be customer's own risk.
r:-e q er\y urr\efi \(q+ fs oy1
Note " --r516.rlrX- dQe
tre<-lxs1'rt q a',t{YleY\t n o+ o,wo. \ \ c,.t I e.
I

is allowed to t8ve linqe. Z-7 taqfn clv*ust nB q eeA>


* ln case of unauthorised travel of person, Safex will not be responsible for any accident loss of life.
* '*= \ze fnecLt grb<\ c\g
Do not overload cage beyond safe working load. p cY- 9f+e. Cevldfpl bn,
* Do not stand in-between doors/gates.
* Do not put your hand in-between the collapsible gates. This may cause loss of hand.
* Do not attempt to stop running cage by opening gate forcibly.

'Tre rope should be checked and replaced periodically.


drake to be checked and adjusted from time to time.
Limit switches, overload relays & interlocks etc should not be by passed.
Do not change phase sequence which will result in reverse operation & cause accident.
ln case of any natural calamity like flood, earthquake, cyclone etc. please inspecl the cage hoist properly before
taking in use of normal operation.

Safex Electromech Pvt. Ltd. Customer


q rYr ghr
Name:fl.tie. tt t *<h>tlh Name and Designation
\U
atua('f t-A I

sgature' l'il.,4- , Signature and Cell No. : u:bis<d) I 39soso162-l

You might also like