3.1 Mekelle three star Armiy Fondution DCE DCDE 62.00% The project is
Suspended
3.2 Summit-1 Apartment Armiy Fondution DCE DCDE 100.00% The project is under
3(G+9&G7) construction
3.3 Summit-2 Apartment Armiy Fondution DCE DCDE 72.50% The project is under
14( G+9&G7) construction
3.4 mekelle adiha Apartment Armiy Fondution DCE DCDE 59.00% The project is under
11( G+9&G7) construction
3.5 HAWASA Apartment Armiy Fondution Man Construction DCDE 44.00% The project is under
3(G+9)B1,B2&B4 construction
3.6 HAWASA Apartment- Armiy Fondution Dessalegne Aserade B.C DCDE 86.36% The project is under
3(G+9)B3,B5&B6 construction
3.7 HAWASA Apartment- Armiy Fondution Tecrom Construction DCDE 51.80% The project is under
1(G+9)B8 construction
3.8 Adama-2 Apartment 2(G+9) Armiy Fondution Nigus Ayinimishet BC DCDE 53.60% The project is under
construction
3.9 KALITY-1 Apartment Armiy Fondution DCE DCDE 30.00% The project is under
13(G+9&G7) construction
3.10 KALITY-2 Apartment Armiy Fondution DCE DCDE 38.00% The project is under
15( G+9&G7) construction
3.11 APARTMENT BUSHEFTU Armiy Fondution Birhan Tobiaw BC DCDE 61.11% The project is under
4(G+9)B1,B2,B3&B4 construction
3.12 APARTMENT BUSHEFTU Armiy Fondution Samson Girmay BC DCDE 44.89% The project is under
1(G+9)B6 construction
3.13 Bahir Dar Aparment Armiy Fondution DCE DCDE 1.21% The project is under
construction
MINSTRY OF NATIONAL DEFENSE DEFENSE CONSTRUCTION DESIGN ENTERPRISE
PHYSICAL REPORT FOR March 30,2020E.C
NO project Employer CONTRACTOR CONSULTA UPTO DATE REMARKS
SUPERVISOR Physical %
1 Defence Enterprice          
Sector
1.1 ACTIVE PROGECT

1.1 Dir-Dawa DES DCE DCDE 47.84% The project is under construction
Appartment
1.2 Completion of DES Varnero DCDE 98.50% The project is under construction
Armed force
Hospital
1.3 Mond Head DES DCE SB 97.93% The project is under construction
Quarter
1.4 Debrezeit DES DCE DCDE 92.00% The project is under construction but not
Engineering college activitiy this month
phase-3
1.5 Bahir Dar Referal DES DCE OTT 98.79% The project is under construction
Hospital
1.6 Mekele Referal DES DCE OTT 98.55% The project is under construction
Hospital
1.7 Janmeda DES DCE DCDE 92.89% The project is under construction
gymnasium
1.8 Bahir Dar Staf DES DCE DCDE 4.90% Preview month reported 13.34% but until
college this month the project is 4.9% due to
addition work which means
supplementary agreement is greater than
the main agreement.
1.9 kore war college DES DCE DCDE 19.06% The project is under construction
2 Goffa phase I DES DCE DCDE 94.28% The project is under construction
2.1 Goffa phase II DES DCE DCDE 20.40% The project is under construction

2.2 Janmeda DES DCE DCDE 0.65% new project but not activitiy this month
dormitery(G+7)
2.3 East command DES DCE DCDE 61.13% The project is Suspended