EXERCISES Page #
1
Construction Management
Development Program
Instructions: You are tasked to complete this learning portfolio as instructed by your
facilitators.
1) Living Room
Figure A
Original Specifications
1. Room color shall be Navy Blue (RAL 5003)
2. Vinyl Tile Floor
3. Wooden base board (white painted)
4. Power outlet provisions at elevation 1meter from FFL
5. Use louver type windows
6. Provide cool white lighting fixtures
2
Construction Management
Development Program
Findings No.1
Nonconformances Punchlist
1. Room color shall be Navy Blue 1. Power outlet elevation 1meter from FFL
(RAL 5003)
2. Viny tile floor 2. Paint scratches on wall and ceiling
4. 4.
5. 5.
3
Construction Management
Development Program
300 mm
Figure 2
Original Specifications
1. Thickness = 400 mm
2. 16mm diameter ties
3. Fc’ = 5000 psi
4. Concrete Cover = 40mm
5. Use 19mm aggregates
4
Construction Management
Development Program
Findings No.2
Nonconformances Punchlist
1. Reinforced concrete shear wall 1. Concrete honeycomb
thickness 400mm
4. 4.
5. 5.
5
Construction Management
Development Program
3) Electrical Room
Original Specifications
1. Equipment Pad Thickness = 300 mm
2. Epoxy Painted Floor
3. Waterproofed Equipment Pads (Beige color)
4. No Wire on the floor
5. Provide explosion proof lighting fixtures @ 1 meter spacing
6
Construction Management
Development Program
Findings No.3
Nonconformances Punchlist
1. Epoxy painted floor 1. Excess waterproofing paint on floor
5. 5.
7
Construction Management
Development Program
Instructions: You are tasked to complete this learning portfolio as instructed by your
facilitators.
8
Construction Management
Development Program
9
Construction Management
Development Program