Professional Documents
Culture Documents
Levels of Responsibilit y
MANAGEMENT
(TQM Policy & Overall Responsibility of
1.
. Project Preparation and Design) ...
..
..
2.
Management Representative (H.O.
Q.A. Cell) Implementation of Quality
.
. Policy and Review . ...
1
Chief of Design Organisation
. -. . I
. '---------------------------
. .
------------------
Proof check Consultant if I
,_. Quality Audit
··································
,, . specified by user
.
··········'···►················
.
·· 4. .
T T T i i T
Quality Resources Task Material Services Land-scape Other Specialis1
System Manager (Human Manager Engineer (i/c Engineer Architect - Safety,
Engineer &· o thers) Highway Geo- Quantity Surve
Engineer Technical) Environment,
any Other
I II I I
Including Including Including Including Including
r---.-..--------
I r------- ------- T , ,-----T--------
T ------- T
-----
Methods of Training Analysis Investigation, Storm
internal Library Design & Geo lo gists , Water,
checking, Standardization, detailing Protection, Sewerage,
approval, Computeri- Constructional works Telecom,
independent zation, Aspects, related Water
verification. Improving Tender specialists. Supply,
Job Knowledge, documents Pedestr ian,
Designs coordination Animal
during :1 Crossings
constructions
__ _ _ _ -L-_ _ _ _ _ _ _ _ .J I I_ - - - - 7 --------: I_ - - - - - -r - - - -
I I I I I
------•---------------- •---------------- 1 1 I
Notes:
(1) The organigram indicates the levels of responsibility in four rows. The lines of reporting for execution
of work and responsibility for quality are shown by full lines and arrowheads. The working level
interactions are indicated by dotted lines.
(2) For Q-1, Q-3, Q-4 Classes the responsibility shown in each box need separate group of personnel
with group head,
(3) The organigram is basic. Amend suitably depending on class of QA required.
15
IRC :SP:57-2 000
Levels of Responsibility
Department Head (Eng i nee ring) (TQM Po
I. li cy and Overa ll Respon sib ili ty of
Project)
..
..
..
.
Head of QA in HO
2 I mp leme nt ation of Qua
. li ty Policy and rev iew !+---------------------.. Reg iona l/Specia l Project
. Head
··········•·
4.
t ·► t t
QA Engineer S it e Planning & Co nst ruc t ion Engi Specia li sts - Contract
QA Ce ll Mon itori n neer (Supervision) Safety, Qua n tity, Mana gement
g Engi neer Survey, Engi neer
Env i ronmen
I t, an y other
I I
------------------,
I I
construct ion QA I
I
Manual, Sup erv ision I
5. I
QA Procedur es Check i ng I
I
I
I
I I
--;----------------- I
-------1----------
I
I
II
I
I I I I I
I I I I I
1 - -
Note
(1) The organigram indicates levels of responsibility of four rows. The lines of reporting for execution of
work and responsibility for quality are shown by full lines and arrowheads. The working level
interactions are indicated by dotted lines. The decisions concerning relative priorities and differences
between equal levels are to be taken at higher level of responsibility.
(2) For Q-2, Q-3, Q-4 QA Classes responsibility shown in each box need separate group of personnel
with group need.
(3) The organigram is basic. Amend suitably depending on QA class required.
(4) QA Engineer at Level 4 also report to Regional/Special Project head
16
IRC:SP:57-2 000
MANA GE MENT
(TQM Po li cy & Ove rall Res ponsi bili ty
of Project)
.....
I.
--
(HO- QA Cell I mp lement ation
..... of Quality Poli cy and Review
----------------------- Regional /Special Project
Head ""
.-------------J
················································· .J
tt t t t
t Planning Construction Mat erial QA
HR& Safety Engi
Engineer Engi neer Engineer
4. Engineer neer Sit e
Plant & SPL QA Cell
Equi Agenc ies
I pment En Quant it y
I
gineer Surve y,
I Envi ron-
I rnent any
I
Other
I
I
I
I
I : : I
.I- : I I I I : 1
- '---- I I 1 I .. _ L _
Notes:
(1) The organigram indicates levels of responsibility in four rows. The lines of reporting for execution of
work and responsibility for quality are shown by full lines and arrowheads. Working level interactions
are indicated by dotted lines. The decisions concerning relative priorities, and about differences
between equal levels are to be taken at higher level of responsibility.
(2) For 0-3 & 0-4 QA Classes, the responsibilities shown in each box need separate group of personne l
with group head.
(3) The organigram is basic, can be altered to suit specific requirements.
17
;;rJ
Category A. Planning Proforma -5 0
(/)
"D
TEST FREQUENCY SCHEDULE u,
---.J
I
N
0
0
Consi gnment lden .t1 fica t1 on Spe Pe rform ance Performin g Qual it y Frequency of Frequency of Frequency of 0
cified No Test Stand ard Agen cy Ass uranc e Performance Assurance Audit
Agency
a) Chem ic al Properties
b) Physical Properties
0 °
'
1) Admixture shall be stored as per direction of manufacturer in a 10 Ton cylinder horizontal container
specially de signed to take pressure and to minimise wastage .
2) Adm ixture shall be agitated once in a day and solids if any shall not be allowed to settle .
4)Total chloride, sulphate content and Ph value of admi xtur e when 4 kg. of admixtu re is added to 160 kgs. of
water sha ll not exceed permissible limits of chloride, sulphate content and pH value of mixing water calculated
separate
Signed Signed
Date
Date
Prep are d by
Approved by
(for QA Team)
(For Engineer)
IRC:SP:57-2000
WEIGHT OF SAMPLE :
REMARKS:
Note :
Plot a Grain Size Distribution Curve
Signed Signed
Date Date
61
I RC:SP:57-2 000
LOCATION DATED:
63
IRC:SP:57-2000
LOCATION DATED:
64
IRC:SP:57-2000
LOCATION
DATED:
CONTRACTORS INSPECTION REQUEST NO.
YES/NO
1. Method statement approved
8. Reinforcement approved
Approved by:
Name Signature Date
(for Department)
65
IRC:SP:57-2000
Admixture
(Type & Dosage)
Ambien t Temp.
Weather condition
66
lR C:SP:57-
2000
Location
Stage of inspection
Date of Pour
Date of inspection
Sor NS*
Levels Sor NS
Dimensions Sor NS
2. Surface Defects (honey : No defects (Note type and extent of
combing/sand streaks/ Minor defects defect)
air bubbles/cold joints) Major defects
3. Class of Finish :
Sor NS
4. Cracks: No cracks
Date first observed:
Cracks
Nature of cracks
In case of NS report in items (1) to (5), it should be examined by competent authority before approval or
non-approval. If required, a separate non-conformance report (including sketches, photographs, etc.)
shall be prepared for further action.
Approval/Non-Approval by:
(for Department) Name Signature Date
IRC:SP:57-2000
Meterial: Date :
Sample No. 1 2 3 4 5 6
Wt. Wt. Wt. Wt. Wt. Aggregate
Container Container Aggregate Aggregate Aggregate Impact value
+ Aggregate before retained on passing on
compaction 2.36 mm 2.36 mm
sieve sieve
Grms. Grms. Grms. Grms. G.rms. %
- - (2-1) - (3-4) (5/3 ) X 100
REMARKS: AVERAGE : %
68
I RC:SP :57-
2000
Material :
.
Date:
Reduced level : Layer No. MOD= gm/cc
Bulk Density : Qm/cc. Layer Thickness OMC= %
No CHAINAGE u 1 2 3 4 5
4. Volume of mould cc
5. Wet Density of soil (3/4) Gms./CC
Moisture Determination - - - - - -
6. Wt. Wet soil + Gms.
Standard Deviation
REMARKS:
69
IRC:SP:57-2000
Material : Date:
Sieve Range 1 2 3 4
(MM) Total weight of Wt. Aggregate Wt. Aggregate Flakiness
Aggregates retained passing Index
(%)
Grms. Grms. Grms. Grms.
63-50
50-40
40-31.50
31.50-25
25-20
.
20-16
16-12.50
12.5-10
10-6.3
-
REMARKS: Average:%
70
I RC:SP :57-
2000
Category B: Inspection Proformae B-10
ATTERBERG
LIMIT
LOCATION TESTED BY :
SOURCE DATE:
No. of Blows/Penetration
in mm
CONTAINER NO.
1. Wt. Container+Wet. Gms.
soil
2. Wt. Container+Dry soil Gms.
,--,
-
0
. ._,,
-
-
0
s::s::
u<
. ..I.)
-
0"'
:::,
No. of Blows
LL %
PL %
Plastic Index (Pl) %
Remarks
71
IRC:SP:57-2000
COMPACTIONTEST
MODIFIED PROCTOR -
SOURCE DATE:
6. Moisture Content(w) %
·-
II
G
I'
q
"='
'-'
0 >,
c:S
II
SOURCE DATE :
MATERIAL
SAMPLE NO. 1 2 3 4 5
1. Wt. Sand before Pouring Grs.
6. Volume of Hole(5/0) cc
7. Wt. Wet Soil from Hole Grs.
Moisture Determination
DEGREE OF COMPACTION
(1 3/14)100
73
IRC:SP:57-2000
CBR
(SOAKED/UNSOAKED)
SAMPLE NO.:
DESCRIPTION OF SOIL:
NO.OF
BLOWS LAYERS MOISTURE CONTENT
* Container No. * E
6. Wt. Container+Dry Soil Grm
Modified
MOD: Gm/CC 7. Wt. Container+Dry Soil Grm
PROCTOR
OMC: % 8. Wt. Water (6-7) Grm
9,. Wt. Container Grm
SWELLING TEST 10. Wt. Dry Soil (7-9) Grm
DATE TIME DAYS READING Swell Swell 11. Moisture Content (8/1O)x100 %
I F (mm) (%) -
C:
OJ)
6
(/)
(/)
w.i
0::
f-
(/)
PENETRATION (MM)
CBR (2.5)
CBR (5.0)
74
IRC:SP:57-2000
BITUMEN EXTRACTION
REMARKS
75
IRC:SP:57-2000
MARSHAL TEST
4. Volume Gms.
5. Density Gms./CC
7. VMA 8-22% *
REMARKS
76
; IRC:SP:57-2000
CORE TEST
2. Core Chainage
3. Core Thickness mm
4. Wt in Air Gms.
5. Wt in Water Gms.
6. Volume Gms.
-
7. Density Gms/CC
-··-
8. Compaction (Core) %
REMARKS
. -
77
IRC:SP:57-2000
GRADATIO N/AC
Material Description : AC
100
90
80
70
0
;z.
VJ 60 '
VJ
<!'.
0...
r.:... 50
0
'-o
O ' 40
30
20
10
0
0.075 0.300 2.36 4.75 9.5 1 9.0 26.5
SIEVE SIZE
78
I RC:SP:57-2000
GRADATION/ DBM
100
90
80
0 70
(/)
z
(/) 60
<t
a..
LI.. 50 I
0
0
40
30
20
10
0
0.075 0.30 2.36 4.75 12.5 26.5 37.5
SIEVE SIZE