Professional Documents
Culture Documents
Outline
T.Ackermann@energynautics.com 1
Wind Power Part 4 17 September 2008
Blades
Blades
1 1
Pwind = E& = m& v 2 = ρAv 3
2 2
T.Ackermann@energynautics.com 2
Wind Power Part 4 17 September 2008
Betz I Betz II
1
=
2
Kinetic Energy: E 2 mv
1
=
2 2
Extracted Energy E
ex 2 v1 v 3
m( - )
1
Extracted Power: E& =
2 2
&( - )
2 v1 v3
ex
m
⎡ ⎛ 2
⎞⎤
⎢1 ⎛ v ⎞⎜ ⎛ v3 ⎞ ⎟⎥
ρ Av 1 ⎟ ⎜1 − ⎜ ⎟
1
E& ⎢ 2 ⎜⎜ 1 +
3
= ⋅ 3
⎟⎥
⎟
v 1⎠ ⎜ ⎟⎥
ex
⎝ v1 ⎠
2
⎢ ⎝
⎣ ⎝ ⎠⎦
16
c P ,Betz = = 0.59
27
T.Ackermann@energynautics.com 3
Wind Power Part 4 17 September 2008
Important
T.Ackermann@energynautics.com 4
Wind Power Part 4 17 September 2008
Blade Design
18
Blade Material
T.Ackermann@energynautics.com 5
Wind Power Part 4 17 September 2008
Blade Test
• 3 bladed rotor
• 25 % capacity factor
• 20 years
• average 20 rpm
• 8760 0.25 60 20 20
8760*0.25*60*20*20=
52,560,000 cycles from tower shadow alone!
• lifetime ?
T.Ackermann@energynautics.com 6
Wind Power Part 4 17 September 2008
n
gear AS
fixed speed box grid
induction
generator
T.Ackermann@energynautics.com 7
Wind Power Part 4 17 September 2008
pitc h
ac-dc-ac
converter
n
gear = ~
box SG ~ =
variable
grid
speed (with or synchronus
without) generator
T.Ackermann@energynautics.com 8
Wind Power Part 4 17 September 2008
Cut-In Speed
The wind speed at which a wind turbine begins to
produce power
Rated Speed
The "rated wind speed" is the wind speed at
which the "rated power" is achieved and
generally corresponds to the point at which
the conversion efficiency is near its maximum
33
1400
Wi nd Speed m/ s
T.Ackermann@energynautics.com 9
Wind Power Part 4 17 September 2008
1000
200
0
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
Wi nd Speed [ m/ s]
39