You are on page 1of 11

LIST OF OUTSTANDING WORKS &

DEFECT LIST
UNIT NO : Sublot 1 to Sublot 4
TYPE : Double Storey Semi Detached (2SD)
DATE : 20 FEBRUARY 2019
INTERNAL BUILDING
Item Outstanding Works Defect List Subcontractor Photo Remarks

1 Incomplete wiring work Sublot 1 – Sublot 4

2. Poor workmanship: Sublot 1 – Sublot 4


a. Ceiling
b. Store area
c. Kitchen area

Sublot 1 – Sublot 4

Sublot 1 – Sublot 4
Item Outstanding Works Defect List Subcontractor Photo Remarks

3 Gap 200mm between Sublot 1 and


window frame & main Sublot 3
building structure

4 Incomplete sanitary Sublot 1 – Sublot 4


ware/sanitary fitting &
accessories

Sublot 1 – Sublot 4
Item Outstanding Works Defect List Subcontractor Photo Remarks

5. No toilet and kitchen door


Sublot 1 and Sublot
3

Sublot 1 – Sublot 4

6. No timber floor Sublot 1 – Sublot 4


board/laminating floor at
staircase and level 1

7. Uneven wall surface at Sublot 1 – Sublot 4


dining/staircase area
Item Outstanding Works Defect List Subcontractor Photo Remarks

8. Poorworkmanship at Sublot 1 – Sublot 4


staircase /store area
EXTERNAL BUILDING
Item Outstanding Works Defect List Subcontractor Photo Remarks

1 Window glass cracked Sublot 1 & Sublot


at W2 4

2. To top up 120mm Sublot 1 – Sublot 4


gravel/premix at
crossover entrance

3. To construct crossover Poorworkmanship at Sublot 1 – Sublot 4


main drain.

4 Incomplete bin center area Sublot 2


Item Outstanding Works Defect List Subcontractor Photo Remarks

5. Poor workmanship Sublot 1 & Sublot


perimeter drain . 4
Need to do remedy
work

6. To do plastering at the Sublot 1


edge five foot way
tiles.

7. Poor workmanship Sublot 1 – Sublot 4


aluminium meter box.
To do internal
plastering.

8. Incomplete work- Ecosept Sublot 1


Tank.
Water flow out let
blockage.
Item Outstanding Works Defect List Subcontractor Photo Remarks

9. Uninstalled rain water Sublot 1 & Sublot


outlet pipe 4

10. Fencing Column Sublot 1


/posto need to be
repaired