BILL OF QUANTITIES

Replanting Activities including (1) Cycle Maintenance and Protection


Location: NGP CY 2014/ San Pascual, Basud, Camarines Norte / 151 ha. Duration 6 months

ABC: 316,046.54 Commodity Bamboo

Target Area 37.34 hectares Seedling Requirement 7, 617

Physical Financial TOTAL COST


TARGET UNIT
ACTIVITIES UMW
(ha) COST 4-6
1-3 months Q3 Q4
months

A. Site Preparation, hauling of planting materials, planting installation of


billboard/tarpaulin
ha 37.34
A. Strip brushing, hole digging, staking, hauling of planting materials, planting and 37.34 189, 627. 92 189, 627.92
installation of billboard

B. 1st Cycle Protection and Maintenance of Establish Plantation

Strip Brushing/Spot Cultivation/Ring Weeding or pressing in cogonal areas;


37.34
Establishment of Fireline, if applicable (width and length will depend on Ha 37.34 126,418.62 126,418.62
the condition of the area) and Patrol Works

Total 316,046.54