PRICING SYSTEM by Area in Square Meter

BY STANDEL CORPORATION
BY JOSE SIAO LING & ASSOCIATES
EMPLOYED IN THE OFFERED QUOTATION REMARKS
Floor Level / Area in Proposed Contract Floor Level / Area in Total Capital
Cost per Sq.M. Cost per Sq.M.
Description Sq.M. Cost Description Sq.M. Investment
1. DESIGN &
ENGINEERING PHASE PHP 1,100,000.00
(Phase 1)
Proposed Total Cost for
Design & Engineering PHP 1,100,000.00
Phase 1
2. CONSTRUCTION
A. ARENA
PHASE (Phase 2)

General Requirements N/A N/A PHP 3,759,676.40 General Requirements - - -

Ground Floor Covered Ground Floor Covered


Area
4,417.87 @Php20,000/sq.m. PHP 88,357,318.00
Area
5,948.05 @Php20,000/sq.m. PHP 118,961,000.00 Same price/sq.m.

Mezzanine Floor Mezzanine Floor


Covered Area
2,011.65 @Php35,000/sq.m. PHP 70,407,793.24
Covered Area
3,508.65 @Php35,000/sq.m. PHP 122,802,750.00 Same price/sq.m.

Roof Deck Opened Area 569.42 @Php8,500/sq.m. PHP 4,840,070.00 Roof Deck Opened Area 921.51 @Php17,500/sq.m. PHP 16,126,425.00 Standel is Lower

Roof Deck Covered Standel has quoted cost but J. Ling did
Roof Deck Covered Area 3,848.45 @Php17,500/sq.m. PHP 67,347,875.00 - - -
Area not indicate any Investment Amount

Total Capital Investment


Proposed Total Cost for
PHP 234,712,732.64 for Arena - Without the PHP 257,890,175.00
Construction Phase 2
Supplied Materials

B. OWNER SUPPLIED
PHP 60,893,671.43
MATERIALS

TOTAL CAPITAL
PROPOSED TOTAL INVESTMENT (ARENA) -
PHP 235,812,732.64 PHP 318,783,846.43
PROJEC COST Including Supplied
Materials