You are on page 1of 42

EVALUATION PROCESS

Clearing of Plans

Engr. Maria Kristina De Guzman


Labor & Employment Officer III

Webinar on DOLE’s Processing of Application for Fabrication,


Installation of Mechanical Equipment, and Electrical Wiring
06 December 2021 | Zoom Teleconferencing
EVALUATION OF PLANS

❑ Mechanical
➢ Installation
➢ Fabrication

❑ Electrical
➢ Installation
EVALUATION OF MECHANICAL PLANS

❑ Installation
➢ Pressure Vessel ➢ Crane and Hoist
➢ Boiler ➢ Elevators
➢ Internal Combustion Engine ➢ Power Piping Line
➢ Turbines

❑ Fabrication
➢ Pressure Vessel
➢ Boiler
NUMBER OF PROCESSED APPLICATIONS

Evaluated Mechanical Plans


4500

4000

3500

3000
No. of plans

2500

2000

1500

1000

500

0
Approved Return
2019 4198 287
2020 2658 1020
COMMON FINDINGS DURING EVALUATION (Fabrication) :

▪ Indicated length in the Manufacturer’s Data Report is


different from the dimension in the drawing plan

▪ Shell thickness used is less than the computed shell


thickness

▪ Incomplete signature on all application forms and drawing


plans
COMMON FINDINGS DURING EVALUATION (Installation):

▪ Incomplete signature on application forms


▪ Equipment data in the application form cannot be verified
from the drawing equipment specification in the drawing
plan
▪ Incomplete equipment data in the application form
▪ Volume provided is volume flow rate
▪ Only 1 application form was submitted with several number
of units covered
COMMON FINDINGS DURING EVALUATION (Installation):
Pressure Vessel:
▪ Full volumetric capacity of pressure vessel as water was not considered in the
computation

Internal Combustion Engine:


▪ Foundation design is not in accordance with the requirement of Phil. Mechanical Code

Crane and Hoist:


▪ Reflected number of motors in the equipment drawing plan are not the same with the
number of motor in the specification and application

Power Piping Line:


▪ Isometric drawing was not provided,
▪ Length & diameter of pipeline were not indicated
OBJECTIVE:

➢ To increase the awareness of stakeholders on DOLE’s


requirement for issuance on permit to operate/
certificate of electrical inspection

➢ To have common understanding on the requirements


on technical plans application
DOCUMENTARY REQUIREMENTS
Clearing of Plans

Webinar on DOLE’s Processing of Application for Fabrication,


Installation of Mechanical Equipment, and Electrical Wiring
06 December 2021 | Zoom Teleconferencing
DOCUMENTARY REQUIREMENTS

❑ Transmittal Letter
❑ Certificate of Appearance of Professional Engineer
❑ Photocopy of valid PRC and latest PTR of Professional
Engineer
❑ Application Forms (3 sets per unit)
❑ Drawing Plans (3 sets per unit)
All plans should be signed by the owner/manager/authorized representative, and signed and sealed by Professional Engineer
FABRICATION
Clearing of Plans

Webinar on DOLE’s Processing of Application for Fabrication,


Installation of Mechanical Equipment, and Electrical Wiring
06 December 2021 | Zoom Teleconferencing
ASPECT OF EVALUATION - FABRICATION

a. Transmittal Letter f. Drawing Plans


b. PME’s Certificate of Appearance i. Equipment detailed construction
drawing
c. Photocopy of PRC ID and PTR
ii. Equipment design computation
d. Application Form
iii. Equipment specification
e. Manufacturer’s Data Report iv. General Notes
ASPECT OF EVALUATION

a. Transmittal Letter • Intent of the applicant


b. PME’s Certificate of Appearance
• Who is the applicant
c. Photocopy of PRC ID and PTR

d. Application Form • Contact details of the applicant


e. Manufacturer’s Data Report
• Contact person
• Type of equipment is being applied
• Number of units.
ASPECT OF EVALUATION

a. Transmittal Letter

b. PME’s Certificate of
Appearance • DOLE issued CA
c.

d.
Photocopy of PRC ID and PTR

Application Form
• Must be valid
e. Manufacturer’s Data Report
ASPECT OF EVALUATION

a. Transmittal Letter

b. PME’s Certificate of Appearance

c. Photocopy of PRC ID
• PRC ID must be valid
and PTR
d. Application Form
• Latest PTR
e. Manufacturer’s Data Report
ASPECT OF EVALUATION

a. Transmittal Letter
• All data must be filled-out
b. PME’s Certificate of Appearance

c. Photocopy of PRC ID and PTR • Signed by Owner/Manager/Authorized


d. Application Form
Representative
e. Manufacturer’s Data
Report • Signed and sealed by Professional
Mechanical Engineer
ASPECT OF EVALUATION

f. Drawing Plans

i. Equipment detailed
construction drawing
(include welding details)

ii. Equipment design


computation
(corresponding reference code)

iii. Equipment
specification
iv. General Notes
ASPECT OF EVALUATION

f. Drawing Plans

i. Equipment detailed
construction drawing
(include welding details)

ii. Equipment design


computation
(corresponding reference code)

iii. Equipment
specification
iv. General Notes
INSTALLATION
Clearing of Plans

Webinar on DOLE’s Processing of Application for Fabrication,


Installation of Mechanical Equipment, and Electrical Wiring
06 December 2021 | Zoom Teleconferencing
ASPECT OF EVALUATION - FABRICATION

e. Drawing Plans
a. Transmittal Letter i. Plant Location / Vicinity Map
b. PME’s Certificate of Appearance ii. Plant and/or Room Lay-out

c. Photocopy of PRC ID and PTR iii. Installation drawings of


equipment
d. Application Form
iv. Equipment Specifications

v. Detailed foundation construction


drawings
vi. Foundation design calculation
ASPECT OF EVALUATION

a. Transmittal Letter • Intent of the applicant


b. PME’s Certificate of Appearance
• Who is the applicant
c. Photocopy of PRC ID and PTR

d. Application Form • Contact details of the applicant


e. Drawing Plans
• Contact person
• Type of equipment is being applied
• Number of units.
ASPECT OF EVALUATION

a. Transmittal Letter

b. PME’s Certificate of
Appearance • DOLE issued CA
c.

d.
Photocopy of PRC ID and PTR

Application Form
• Must be valid
e. Drawing Plans
ASPECT OF EVALUATION

a. Transmittal Letter

b. PME’s Certificate of Appearance

c. Photocopy of PRC ID
and PTR
• PRC ID must be valid
d. Application Form
• Latest PTR
e. Drawing Plans
ASPECT OF EVALUATION

a. Transmittal Letter
• All data must be filled-out
b. PME’s Certificate of Appearance

c. Photocopy of PRC ID and PTR • Signed by Owner/Manager/Authorized


d. Application Form
Representative
e. Drawing Plans

• Signed and sealed by Professional


Mechanical Engineer
ASPECT OF EVALUATION

e. Drawing Plans

i. Plant Location / • Showing the location of the


Vicinity Map establishment where the equipment is
ii.
iii.
Plant and/or Room Lay-out
Installation drawings of
to be installed
equipment
iv.
v.
Equipment Specifications
Detailed foundation
• Indicate known landmarks
construction drawings
vi. Foundation design
calculation • Include compass rose
ASPECT OF EVALUATION

e. Drawing Plans • Drawn to scale


i. Plant Location / Vicinity Map

ii. Plant and/or Room


Lay-out • Machinery room lay-out, position of the
iii. Installation drawings of
equipment
mechanical equipment in relation to the
iv. Equipment Specifications
surrounding walls and other machinery
v. Detailed foundation
construction drawings
or equipment inside the room are
vi. Foundation design
indicated
calculation

• If in open space, plant lay-out indicating


the location of the equipment subject to
TSI
ASPECT OF EVALUATION

e. Drawing Plans
i. Plant Location / Vicinity Map
• Complete installation drawings of the
equipment subject of TSI;
ii. Plant and/or Room Lay-out

iii. Installation drawings


of equipment
iv. Equipment
• Technical drawing showing the sections,
Specifications elevation, different views of the
v. Detailed foundation
construction drawings equipment
vi. Foundation design calculation
• Equipment specification reflected in the
drawing plan should corroborate with
the application form
Installation drawing of equipment

Pressure Vessel
Boiler

Internal Combustion Engine

Turbine

Elevator/Dumbwaiter

Crane & Hoist

Power Piping Line


Installation drawing of equipment

Pressure Vessel

Boiler
Internal Combustion Engine

Turbine

Elevator/Dumbwaiter

Crane & Hoist

Power Piping Line


Installation drawing of equipment

Pressure Vessel

Boiler

Internal Combustion
Engine
Turbine

Elevator/Dumbwaiter

Crane & Hoist

Power Piping Line


Installation drawing of equipment

Pressure Vessel

Boiler

Internal Combustion Engine

Turbine
Elevator/Dumbwaiter

Crane & Hoist

Power Piping Line


Installation drawing of equipment

Pressure Vessel

Boiler

Internal Combustion Engine

Turbine

Elevator/Dumbwaiter
Crane & Hoist

Power Piping Line


Installation drawing of equipment

Pressure Vessel

Boiler

Internal Combustion Engine

Turbine

Elevator/Dumbwaiter

Crane & Hoist


Power Piping Line
Installation drawing of equipment

Pressure Vessel

Boiler

Internal Combustion Engine

Turbine

Elevator/Dumbwaiter

Crane & Hoist

Power Piping Line


ASPECT OF EVALUATION

e. Drawing Plans
i. Plant Location / Vicinity Map • Dimensions reflected should support the
ii. Plant and/or Room Lay-out
values stated in the foundation design
calculation
iii. Installation drawings of
equipment
iv. Equipment Specifications

v. Detailed foundation
construction
drawings • if the equipment is in elevated structure,
vi. Foundation design calculation
accept structural analysis with added
conditions:
- with a conclusion on the stability of the equipment;
- Certification that the equipment being applied was considered as load in the
computation, this certification must be signed and sealed by a PME
ASPECT OF EVALUATION

e. Drawing Plans
i. Plant Location / Vicinity Map i. Weight of the equipment & accessories
ii.
iii.
Plant and/or Room Lay-out
Installation drawings of
ii. Weight of content based on volumetric
equipment capacity (heaviest condition)
iv. Equipment Specifications
v. Detailed foundation iii. Base Area of the foundation
construction drawings

vi. Foundation design iv. Volume of the foundation


calculation
v. Weight of concrete foundation
vi. Bearing capacity of the soil
vii. Foundation factor of safety
FOUNDATION COMPUTATION

Type Diesel Generator , 1,250 KVA


Bore x Stroke 102 mm x 120 mm
Speed (N) 1800 RPM
# of Cylinders 6
Weight 2050 kgs.

Concrete Pad Details


Length 3600 mm
Width 2000 mm
Depth 600 mm
FOUNDATION COMPUTATION

i. Minimum weight of foundation


Wf = We x e x sq. root of N (as per PSME Code)
= 2,050 kgs x 0.11 x 1,800 rpm
Wf = 9,567.15 kgs

ii. Minimum depth of foundation


Df = 3.2 to 4.2 times the engine stroke(as per PSME Code)
= 3.2 x 0.120 m
Df = 0.384 m
FOUNDATION COMPUTATION

iii. Weight of the equipment & accessories


We= 2050 kgs

iv. Base area (Af) & volume (Vf) of concrete foundation


Af = 3.6 m x 2.0 m = 7.2 m²
Vf = 7.2 m²x 0.6 m = 4.32 m³

v. Weight of concrete
Wf’ = = 10,393.92 kgs.

Wf’ > Wfreq’d therefore OK


FOUNDATION COMPUTATION

TBL = We + Wf = 12,443.92 kgs.

ABL = TBL / Area = 12,443.92 / 7.2 = 1,443.6 kg/m²

FS = 9860 / 1,443.6 kg/m= 6.83

FS : 6.83 > 5 therefore OK


STAMPING & EQUIPMENT CODING OF PLANS
Code Equipment
DL Boiler
PVDL Pressure Vessel
ICE Internal Combustion Engine
EVDL Elevator/Manlift/Dumbwaiter
CHDL Crane and Hoist
PVDL-NCR-01-2021 PPLDL Power Piping Line
PVDL Type of Equipment STDL/GTDL Steam Turbine / Gas Turbine Hydro
VII Region where installed HTDL/WTDL Turbine / Wind Turbine
01 Item number
2021 Year
EEDL Electrical Wiring
Thank you!
For inquiries, you can reach us at

DOLE Hotline - 1349

askbwc@gmail.com

527-3000 local 303 or 307

bwc.technicalplans@gmail.com
(02)8527-3000 loc 307
bwcsecretary@gmail.com

Webinar on DOLE’s Processing of Application for Fabrication,


Installation of Mechanical Equipment, and Electrical Wiring
06 December 2021 | Zoom Teleconferencing

You might also like