You are on page 1of 2

OUR LADY OF FATIMA ACADEMY OF DAVAO INC.

Fatima St., Brgy 24-C, Davao City


S. Y. 2021 - 2022

PERFORMANCE BASED ASSESSMENT/PERFORMANCE TASK

SUBJECT/Grade Level: Grade 4 – EPP Quarter: Third Quarter


Naisasaayos ang payak na sira ng kasuotan sa
pamamagitan ng pananahi sa kamay (hal. pagkabit ng
butones
Performance Standard
Naisasaayos ang payak na sira ng kasuotan sa
pamamagitan ng pananahi sa kamay (hal. pagkabit ng
butones

Title of the Activity Return Demonstration

Create a video compilation of you showing your newly-


Short Description acquired skills in sewing and mending clothes.

The students will submit a video compilation and


Mode of Presentation
photos in the google classroom.

Date to be Presented/Submitted April 18, 2022

Prepared by: Checked by:

Cassy Marie V. Gonzales Ms. Cleofe Sobiaco


Subject Teacher Subject Area Coordinator
INSTRUCTIONS

1. Parents are advised to watch over the children while doing this task.

For children:

2. Create a video compilation of your newly acquired skills in sewing.


3. Rewatch the videos in the 3 basic stitches, attaching the 2 examples of buttons, and
mending a straight tear. You may ask you parents to show it to you in actual first.
4. Prepare/Cut out five (5) squares of cloth with a size of 2 by 2.
5. It can be used cloth.
6. Do the 3 basic stitches: running stitch, hemming stitch and backstitch.
7. Demonstrate how to stitch a button with a shank.
8. Show how to stitch a button with two holes.
9. Look for a cloth or shirt that has a straight tear.
10. Repair it by stitching the straight tear found.
11. You may ask assistance from your parents in this activity.
12. You may use “time-lapse” in some parts of your video to avoid longer duration or bigger
file.
13. Take a photo of each work and attach it in the google classroom “Performance Task
Third Quarter” together with the video.

PRESENTATION OF THE RUBRIC

RUBRICS 5 3 1 Total
Obedience Student Student follows some Student failed to
independently directions. follow all steps.
follows all
directions.
Organizati The sequences in The sequences in the The sequences in
on the video is well video is somehow the video
organized. organized. is.disorganized.
Content Accurate 5 stitches Accurate 3-4 stitches Only 1 stitch is
(x5) were shown. (5 were shown. (5 points accurate. (5
points per accurate per accurate stitch) points per
stitch) accurate stitch)
Execution All steps were Some steps were No execution of
excuted. skipped. was done.

Punctuality The project is The project is The project is


submitted submitted 1-2 days submitted 3 or
on/before the after the deadline more days after
deadline the deadline

Total 45 points

You might also like