Professional Documents
Culture Documents
00
Rating Definition
1 - Negligible the occurrence is extremely unlikely to happen and has never happened
2 - Low according to ourisknowledge
the occurrence unlikely to happen in the foreseeable future but has alread
3 - Moderate been experienced
the occurrence is predictable to happen in the mid-term
4 - High the occurrence is predictable to happen in the short term
5 - Definite the occurrence is certain and immediate.
Operating Conditions: Normal / Abnormal / Emergency
Reviewed By
EHS Representative (Name, Signature and Date)
2 Management & Staffing Communication Gap Personal Injury, Damage to plant &
equipments
6 Pulling can trolley inside Tilting of load Personal Injury, Damage to materials
the shell using 2.5T
winch/ pushing can
trolley using Farana &
Making 900 rotation again
10 Fit upof cans Work at height Fall from Height /fall of materials
(GE Priya Constructions)
Hit by the hammers/clits Personal Injury
By Appro
Competent Discipline Engineer (Name, Signature and Date)
Personal Injury, Damage to plant & 9 Selection of staffs competent for the nature
equipments of job right from the planning stage.
3 3
Personal Injury, Damage to plant & 3 4 12 Check installation of winch m/c @ foundation
equipments of for healthiness,Protect hoist way and lift
way by an enclosure constructed as to
prevent any person from falling
materials,Mark the maximum safe working
load on every hoist or lift, and no load
greater than such load shall be carried
thereon,The cage of every hoist or lift used
for carrying persons shall be fitted with a
gate on each side from which access is
afforded to a landing & every gate shall be
fitted with interlocking or other efficient
device to secure that the gate cannot be
opened except when the cage is at the landing
and that the cage cannot be moved unless the
gate is closed,Proper access & its barrication
from access plat form to working deck,Install
overtravelling device.
Personal Injury, Damage to materials 2 4 8 Daily checks of ground condition & lifting
equipments before start of work by the
operator/ supervisor,third party certification
of crane,Competent operator, Banksman,
structural components tied properly, checking
of wire rope/webbing slings, Use of guide
rope , Job specific training to Slingers,
Signalers,Operator.
Assessment of load & marking of proper
smooth approach shall be prerequisite to
start the activity.
Lifting Plan shall be devised and get
approved.
Personal Injury, Damage to materials 2 4 8 Daily checks of trunion/geared part of the
trolley, Desgined as per approved drawings,
proper communication between the signaler &
operator , making an exclusion zone around
the swing area of load, Display of sign board
& proper monitering.
Personal Injury, Damage to materials 3 3 9 Making the path of traverse of trolley over
rail an exclusion zone. Adequate strengthning
& smoothness of the rail lines.
While making rotation, additional rachet
installed with the trolley shall be
fixed/clamped with the rail to prevent
tilting.
1. Full
body harness shall be invariably be used and
anchored at suitable anchorage points.
2. Only worked at height trained personal
shall be allowed to do the job.
3. Hand rail, mid rail & toe board shall be
installed with both the external & internal
working platforms.
5. Suspended workinh platforms shall have TPI
certification under the specified sections of
the Factories Act.
Personal Injury 3 3 9
Personal Injury 2 3 6
Cylenders shall be kept upright and moved
using cylender trolley.
Hand and Finger Damage 2 2 4 1. Proper wheel shall be used as per the
Personal injury (GE,Priya grinding machine specification.
construction) 2. Ensure grinding machine used with wheel
guard.
3. Check the condition of the wheel based on
the expery date.
Electrical Shock Skin Damage/Fatal 3 2 6 1. Ensure power supply must be through ELCB.
Personal injury (GE,Priya 2 Grinding cables shall not mixed with
construction) welding cables.
3 Power cable should be routed in such a way
that passage way & access should not be
blocked.
4 All the cables shall be protected from
damage.
5 Use job specific PPE’s for job.
6. Only Trained electricians shall be deployed
to do electrical works.
Electric shock [Personnel Injury] 3 4 12 1. Ensure Double body earthing of the welding
m/c. power shall be terminated through a
RCCB of 30mA tripping value.
2. Power cable shall be fully insulated.
3. Welding lead/ return lead shall be fully
insulated and if necessary joints shall be
made through lugs& got insulated as well.
4. Only Trained electricians shall be deployed
to do electrical works.
Damage to eye [Personnel Injury] 2 3 6 Welders shall wear mask with rate eye
protection glasses. Helpers shall also, wear
protective spectacle.
Approved By
ture and Date)
2 2 4
2 2 4
2 2 4
2 2 2 1. While fixing the steel can with 1 2 2
the trolley, load shall be securely
held by the crane. As the bolts
are tightened, load shall be
securely transferred to trolley
taking utmost careof stability of
the load.
2 2 4 Adequate/vigilant supervision. 1 2 2
2 2 4 Adequate/vigilant supervision. 1 2 2
2 2 4
2 2 4 Vigilant supervision shall be 2 1 2
ensured. Checking of all
accessories including fixed
anchor, hose connections, Power
pack shall be checked before
lifting starts.Surrounding
clearance shall also, be
soughtwithin the periphery of
steel flue.
1 3 3
1 3 3
1 3 3
1 2 2 1 1 1
2 2 4 Ensure Powe supply must be 1 2 2
thruough ELCB of 30mA tipping
capacity. Welding m/c shall have
doubly earthed .
1 3 3
1 3 3
1 3 3