FACILITY
MIP PKG 17 RAS TANURA AREA PIPELINE PROJECT CSEP SHALL NOT BE EXCEED 7 DAYS
LOCATION: START DATE: END DATE:
MLV 01 KM 68
DAY1 DAY2 DAY3 DAY4 DAY5 DAY6 DAY7
□ Gloves (Specify):.................................................
□ Ladder required □ External scaffold required □ Internal scaffold required
□ Respiratory Protection (Specify):.........during grit
□ Fall Protection required □ Platform modification required blasting.........................................
ACCESS AND EGRESS □ Other..................................................................
□ Other:……....................................................................................................................................
□ Within eye sight □ Line signals □ Radios
□ Edge protection □ Caution tape □ Hard barricade MEANS OF
PROTECTION OF
COMMUNICATION □ Other:…………………………………………………………………
SURROUNDING AREAS
□ Warning lights □ Warning aigns □ Flagman WITH ENTRANTS
□ Signals were dicussed with personnel before entry.
PREVENTION OF
UNAUTHORIZED
ENTRY
EMERGENCY
RESPONSE AND
RESCUE
The drawing of the Confined Space must show ALL Isolation if required , Entry and Ventilation points
Additional documents required
NAME Position Badge Signature Date before initiating CSE activities.
1. CSEP WILL NOT EXCEED 7 DAYS. If additional time is needed, a new CSEP will have to be prepared and appro ved.
2. Copy of both sides of this Approved CSEP must be posted at the entrance of the Confined Space in clear plastic envelopes.
3. Initial confined space entry into pits, sumps, vessels, tanks, drums, or other process equipment that may have previously contained
flammable, combustible, or toxic materi als will require addit ional approvals by proponent management prior to work commencing.