SATIP-P-116-01 Rev 7 Final
SATIP-P-116-01 Rev 7 Final
SAUDI ARAMCO TYPICAL INSPECTION PLAN SATIP No. APPROVED DATE DISCIPLINE:
INSPECTION RESPONSIBILITY
ITEM QUALITY QUALITY ASSIGNMENTS
PROJECT PHASE TASK / ACTIVITY REMARKS
NO. PROCEDURE RECORD
SAUDI
CNTRCTR
ARAMCO
RECEIVING
1.0
INSPECTION
Material Receiving
1.2 Visual Inspection SAIC-P-3813 SAIC-P-3813 I W
MV Metal-Clad Switchgear
Material Receiving
1.3 Visual Inspection SAIC-P-3814 SAIC-P-3814 I W
MV SF6 Circuit Breaker
Material Receiving
Visual Inspection
1.4
Manually Operated Pad Mounted SF6
SAIC-P-3815 SAIC-P-3815 I W
Switchgear
Material Receiving
1.5 Visual Inspection SAIC-P-3817 SAIC-P-3817 I W
Vacuum Circuit Breaker - Feeder
Material Receiving
It shall be used in addition to SAIC-P-3817 if motors are
1.6 Visual Inspection SAIC-P-3816 SAIC-P-3816 I W connected directly to switchgear
Vacuum Circuit Breaker - Motor Load
2.0 INSTALLATION
Page 1 of 6
03/09/2022 3:38 PM
SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - March 2013) Rev 7 31-Mar-13
SAUDI ARAMCO TYPICAL INSPECTION PLAN SATIP No. APPROVED DATE DISCIPLINE:
INSPECTION RESPONSIBILITY
ITEM QUALITY QUALITY ASSIGNMENTS
PROJECT PHASE TASK / ACTIVITY REMARKS
NO. PROCEDURE RECORD
SAUDI
CNTRCTR
ARAMCO
Indoor Pre-Installation
Hold point for substantial completion of building and
Visual Inspection-MV Metal Clad
2.1
Switchgear Installation and
SAIC-P-3003 SAIC-P-3003 H H electrical room civil / structural / architectural finish work
(i.e., no construction dust or fumes).
Precommissioning
MV Metal-Clad Switchgear
2.3 Installation & Identification SAIC-P-3819 SAIC-P-3819 H H Also see SATIP-P-111-01 Grounding and Bonding
Visual Inspection
MV SF6 Switchgear
2.4 Installation & Identification SAIC-P-3820 SAIC-P-3820 H H Also see SATIP-P-111-01 Grounding and Bonding
Visual Inspection
Page 2 of 6
03/09/2022 3:38 PM
SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - March 2013) Rev 7 31-Mar-13
SAUDI ARAMCO TYPICAL INSPECTION PLAN SATIP No. APPROVED DATE DISCIPLINE:
INSPECTION RESPONSIBILITY
ITEM QUALITY QUALITY ASSIGNMENTS
PROJECT PHASE TASK / ACTIVITY REMARKS
NO. PROCEDURE RECORD
SAUDI
CNTRCTR
ARAMCO
3.0 PRE-COMMISSIONING
MV Switchgear
3.2 High-Potential SATR-P-3808 SATR-P-3808 I W In accordance with manufacturer's instructions.
Withstand Testing
Protection Relays
3.7 Testing and Setting SATR-P-3801 SATR-P-3801 I W
for Energization Certificate
Page 3 of 6
03/09/2022 3:38 PM
SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - March 2013) Rev 7 31-Mar-13
SAUDI ARAMCO TYPICAL INSPECTION PLAN SATIP No. APPROVED DATE DISCIPLINE:
INSPECTION RESPONSIBILITY
ITEM QUALITY QUALITY ASSIGNMENTS
PROJECT PHASE TASK / ACTIVITY REMARKS
NO. PROCEDURE RECORD
SAUDI
CNTRCTR
ARAMCO
MV Metal-Clad Switchgear
Pre-energization Functional Testing
3.8
and Visual Inspection
SAIC-P-3819 SAIC-P-3819 I W
for Energization Certificate
MV Metal-Clad Switchgear
Pre-energization Functional Testing
3.9
and Visual Inspection
SATR-P-3807 SATR-P-3807 I W
for Energization Certificate
MV SF6 Switchgear
Pre-energization Functional Testing
3.10
and Visual Inspection
SAIC-P-3820 SAIC-P-3820 I W
for Energization Certificate
MV SF6 Switchgear
Pre-energization Functional Testing
3.11
and Visual Inspection
SATR-P-3808 SATR-P-3808 I W
for Energization Certificate
Page 4 of 6
03/09/2022 3:38 PM
SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - March 2013) Rev 7 31-Mar-13
SAUDI ARAMCO TYPICAL INSPECTION PLAN SATIP No. APPROVED DATE DISCIPLINE:
INSPECTION RESPONSIBILITY
ITEM QUALITY QUALITY ASSIGNMENTS
PROJECT PHASE TASK / ACTIVITY REMARKS
NO. PROCEDURE RECORD
SAUDI
CNTRCTR
ARAMCO
Energized MV Switchgear
3.19 Remote Control, Indication, See Remarks See Remarks H H See SATIP-J-900-01 Instrument loop checking
and Alarm Testing
Page 5 of 6
03/09/2022 3:38 PM
SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - March 2013) Rev 7 31-Mar-13
SAUDI ARAMCO TYPICAL INSPECTION PLAN SATIP No. APPROVED DATE DISCIPLINE:
INSPECTION RESPONSIBILITY
ITEM QUALITY QUALITY ASSIGNMENTS
PROJECT PHASE TASK / ACTIVITY REMARKS
NO. PROCEDURE RECORD
SAUDI
CNTRCTR
ARAMCO
GENERAL NOTES
The first three incidents of each Inspection or testing activity listed require 100 % participation by Saudi Aramco Site Inspection Personnel. After this period, Saudi Aramco Inspection may adjust the
1
levels of Saudi Aramco participation based upon the Contractor’s performance.
2 Surveillance: QA/QC organization to monitor work in progress without notice from Construction Organization
Witness: QA/QC organization shall be notified of the timing of Inspection or test in advance. However, the inspection or test shall be performed as scheduled if the QA/QC
3
organization representative is not present.
Hold: QA/QC organization shall be notified of the timing of inspection or test in advance. Inspection or test shall not be carried out without the QA/QC organization
4
representative in attendance.
5 If the Main Contractor delegates the assigned responsibility to the Subcontractor, then the Main Contractor will have the same degree of responsibility as assigned to Saudi Aramco.
Switchgear accessories include storage cabinets, lifting devices, portable charging motor or hand crank (for stored-energy power C/Bs), test plugs, portable test kits for C/B trip units and protection relays,
6
overload relay heating elements, termination hardware, terminal blocks, cable and wire markers, CT's, PT's, CPT's, fuses, nameplates, and warning labels.
LEGEND
H Hold Point for QC Inspection/ Test R Review of Documents
W Witness Inspection/Test RH Review and Approval of Documents
S Surveillance I 100% Contractor Inspection
Page 6 of 6