1. INTRODUCTION
The Works in this document is for the Construction of a Proposed One Storey Residential Building to
be located at Zone 2 Gimaga Goa Camarines Sur. The works shall follow the general requirements
and activities that are included in this document
2. SUMMARY OF WORKS
2.1. The project requires the following activity
2.1.1.1. Site works
a) Safety
1. All activities shall perform based on Occupational Safety and Health
Standards in Philippine Workplaces through RA 11058
2. PPE that provided by the contractor shall be worn all the time in
performing the activity.
3. The contractor is responsible in disposing the debris, personal and
jobsite trash.
b) Site clearing
1. The contractor is responsible in removing and disposing all plants
and shrubs in the site.
c) Layout
1. Installation of batter board and establishing reference elevation
2.1.1.2. Earth Works
a) Safety
2. PPE that provided by the contractor shall be worn all the time in
performing the activity.
b) Excavation
a) Safety
2. PPE that provided by the contractor shall be worn all the time in
performing the activity.
b) Concrete
1. Provide and install all concrete footing, column and beams together with
reinforcement steel bars that based on the plan.
a) Safety
1. All activities shall perform based on Occupational Safety and Health Standards
in Philippine Workplaces through RA 11058.
2. PPE that provided by the contractor shall be worn all the time in performing
the activity.
b) Masonry
1. The contractor shall follow all the specified specification in particular in this
scope of work.
2. The contactor shall provide the sizes of CHB specified in the specification.
3. This works shall include the specified mortar, and horizontal reinforcement.
4. The contactor shall provide a space for electrical outlets, pluming piping and
etc.
b) Materials
1. The contractor shall provide a various design of tiles based on the specified
specification.
c) Includes all required labor, material, and equipment to complete this scope of work
in accordance with the project schedule
1. The contractor shall paint all drywall partitions, masonry walls, drywall
ceilings and exposed ceilings.
2. Paint all exposed ductwork, exposed conduit, exposed piping per plans and
specifications.
3. Paint all hollow metal door frames and doors
1.
a)
2. Site clearing