Professional Documents
Culture Documents
Dear James:
Thornton Tomasetti, Inc (TT) is pleased to provide indicative reinforcing rates for the subject
project. The project is currently at a pre-concept design stage. The provided information is
based on similar projects and may be regarded as indicative. TT will update this information at
the conclusion of the Schematic Design phase.
6080 Center Drive, Suite 260 | Los Angeles CA 90045-9204 | T 310.665.0010 | F 310.665.0101 | www.ThorntonTomasetti.com
Memorandum
T O WE R S UP E RS TRUCT URE
Tower Slabs Option 1 (275mm flat RC slab) Reinforcing Steel: 35 kg/m2 Trí
P O D I UM ST RUCT URE
Please contact us if you have any questions or comments regarding the above.