No. Task Step Hazard Possible Existing Risk Control Additional Risk Action Officer
Severity
d
Likelihoo
Risk Level
Accident/III Control Measure Follow-up Date)
Health &
Persons-at-
risk
-Burnt -Burnt injuries -Long sleeve with leather 5 3 H Pre-check by HSE supervisor
on hand glove / foot protection supervisor
-Tripping -Sprained or -Housekeeping, 2 4 M Pre-check by HSE supervisor
hazard bruises. passageway clear supervisor
-Fire Explosion -Fatal Only explosion proof lighting 5 3 H Pre-check by HSE supervisor
can be use supervisor
-Electrical -Electrocution -Monthly Inspection 5 3 H Pre-check by HSE supervisor
hazard -Cable routing on ‘S’ Hook supervisor
Cable Rack / Housekeeping
1. Hazard Identification 2. Risk Evaluation 3. Risk Control
No. Task Step Hazard Possible Existing Risk Control Additional Risk Action Officer
Severity
d
Likelihoo
Risk Level
Accident/III Control Follow-up Date)
Health Measure
& Persons-at-
risk
2 Scaffold Falling from Fatal injury Erection only done by 5 2 H Check Supervisor of
erection heights trained scaffold thoroughly the piping and as
Use of fall protection scaffold before well as
devices assign to Scaffolding
(harness,etc.) workers Supervisor
3 Collection Hand Hand hit by Wearing hand glove and 2 4 M Pre job briefing in Piping Supervisor
and injury falling of material beware of pinch point. morning and Lifting
mobilization and Fall Ensure no over loading Supervisor
of material’s objects and appropriate lifting
from gears
workshop
include tools
4 Lifting of -Caught In -Hand injury -Wear hand gloves 2 4 M -Competent & Lifting Supervisor
Materials using between -Secure properly of bundle trained person
yard cranes of pipes to do rigging
-Beware of pinch point -Check &
-Use proper lifting gears inspect of belts
condition (keep
clear of lifting
area)
5 Transfer the Falling Injury from falling -Selection of appropriate 4 3 H Barricade the area Piping Supervisor
tools and spool belts & chain blocks & display no
to install. -Proper secure points of entry sign
Location by chain block
chain blocks -Ensure to wear body
harness and hang on
secure place
1
1. Hazard Identification 2. Risk Evaluation 3. Risk Control
No. Task Step Hazard Possible Existing Risk Control Additional Risk Action Officer
Severity
Risk Level
d
Likelihoo
Accident/III Control Measure Follow-up Date)
Health
& Persons-at-
risk
No. Task Step Hazard Possible Existing Risk Control Additional Action Officer
y
Severit
d
Likelihoo
Risk Level
Accident/III Risk Control Follow-up Date)
Health & Measure
Persons-
atrisk
7 Remove pipe -Falling object -Hit by object -Cordon off 2 2 L Pre-check by HSE supervisor
insulation supervisor
Working at Body injury Proper platform 2 2 L Pre-check by HSE supervisor
height supervisor
Contact with Skin irritation Protective clothing 2 2 L Pre-check by HSE supervisor
insulation supervisor
8 Dismantle bolt – -Contact with -Burn -Shut off system 3 1 L Pre-check by HSE supervisor
nut and clamp hot water -Drain the system supervisor
Strike by Finger injury -Use proper tools 3 3 M Pre-check by HSE supervisor
hammer -Use chisel with cap supervisor
-Hand gloves
-Adequate lighting
1. Hazard Identification 2. Risk Evaluation 3. Risk Control
No. Task Step Hazard Possible Existing Risk Control Additional Action Officer
y
Severit
d
Likelihoo
Risk Level
Accident/III Risk Control Follow-up Date)
Health & Measure
Persons-at
risk
9 Transport to -Forklift -Struck by -Qualified operator 4 2 M Pre-check by HSE supervisor
supervisor
workshop operation moving -Forklift checklist
vehicle -Observe speed limit
-Loose Object -Secure object by web 2 2 L Pre-check by HSE supervisor
supervisor
material slip from fork sling
10 Fabricate in -Hot work -Fire PTW system 3 1 L Pre-check by HSE supervisor
supervisor
workshop Valid hot work tools
No. Task Step Hazard Possible Existing Risk Control Additional Action Officer
Severity
Likelihood
Risk Level
Accident/III Risk Control Followup Date)
Health Measure
& Persons-at-
risk