Declaration: By submitting this assessment (Parts 1 – 4) for marking I declare that it is entirely my own work. I understand that falsely claiming that
the work is my own is malpractice and can lead to NEBOSH imposing severe penalties (see the NEBOSH Malpractice Policy for further information).
Important note: You must refer to the document ‘Unit IG2: risk assessment – Guidance and information for learners and Learning Partners’ while
completing all parts of this assessment. Your Learning Partner should provide you with a copy, but it can also be downloaded from the relevant
resources section for this qualification on the NEBOSH website.
Part 1: Background
Tagros Chemicals does a lot of production of hazardous & poisonous pesticide chemicals such as
Permethrin, Fipronil, HCL, H2So4, Na2So3, Cl, NH3 etc…
The workers are engaged working activities in Production of Chemicals, Plant Maintenance &
General description of the organisation Machineries, Utility operations, QA, QC, R&D etc…It involves working Equipment’s & Plants of
N2, Air compressor, Production buildings, Boilers, ETP, WTP, RO, MEP, Chiller, Storage tanks,
Columns, Pipe lines, Storage yards, Loading, Unloading facilities.
This organisation operates 24 hours per day by 3 rotational shift patterns. Workers are employed
to work for 8 hours per day. Workers have to work for 6 days & 1 day week-off. The shift timings
1st shift (06:00 to 14:00 hrs), 2nd shift (14:00 to 22:00 hrs), 3rd shift (22:00 to 06:00).
Description of the area to be included in the This risk assessment will cover the hydrochloric acid production plant, chlorine storage & handling
risk assessment area, HCL loading and unloading area.
Any other relevant information The unit head (who reports directly to the Managing Director) has the direct responsibility for
- Following the inspection, I referred back to the notes, that I made during the
field inspection & source of information from HSE websites. It helps me to decide on any
additional control measures, that were needed.
Hazard category Who might be What are you already doing? What further controls/actions Timescales
and hazard harmed and how? are required? for further Responsible
actions to be person’s job
completed title
(within …)
1. HAZORDOUS WHO MIGHT BE 1. A competent and well-trained 1. Properly designed chemical 2 Months Safety
SUBSTANCES HARMED? person was appointed for chemical storage tanks are to be used. Supervisor
Contract workers, handling.
(CHEMICAL) trainees, supervisors
who are all involved in 2. Chemicals are settled down 2. Proper procedure is to be 3 Weeks Maintenance
Workers mixing the mixing of chemical smoothly in the wastage area. adopted for segregation & Engineer
the chemicals in the substances are disposal of chemicals wastes.
reactor by using bare affected.
hands without using 3. Adequate standard procedure 3. A properly designed agitator 1 Month Maintenance
any kind of PPEs. was planned for handling of with electric motor is to be fixed Engineer
chemicals. for mixing in the chemical tanks.
HOW
Exposure to 4. Quality tools and equipment’s 1 Month Safety
chemicals can harm were implemented and used for Manager
skin leads to allergy. ensuring the smooth operation of
Inhaled or splashes handling chemicals is to be
onto the eyes may monitored.
cause poisoning and
leads to loss of eye 5. Providing chemical canister 1 Week Safety
sight if repeated. mask and breathing apparatus to Supervisor
all employees working in chemical
plant operation.
5. RADIATION WHO MIGHT BE 1. Radiography testing work area 1. Substitution of radiography 1 Month Mechanical
HARMED? boundary is demarcated by using methods by applying other non- Department
Radiography is Engineers, physical barricading. destructive testing methods inside HOD
one of the non- welders and helpers the reactor.
destructive testing who doing
methods, while doing radiography testing in 2. Emergency procedures are 2. Try to eliminate radiography 2 Months Mechanical
radiography testing the chlorine plants maintained and followed properly. testing methods. Department
there is possibility of and the neighbouring HOD
7. ELECTRICITY WHO MIGHT BE 1. A competent and trained person 1. No parallel jobs should be 1 Month Safety
HARMED? only allowed to do the job on the carried out on the motor control Manager
Some of the Contract labours, electrical systems. centre (MCC) panel & same
hazards of the electrician, supervisor, equipment on the field,
electricity are engineers who work procedures to be developed.
electrical shock, directly and indirectly
burns, fire and on electrical
explosion. equipment’s, electrical 2. Electrical preventive 2. Before the commencement of 1 Week Safety
wires, electrical drives maintenance work, done for the job all electrical equipment’s Manager
and substation. equipment weekly once. should be inspected by the
electrical maintenance team to do
the job.
HOW
While working in 3. Providing suitable personal 3. Provision of standard quality 1 Month Electrical
energized electrical protective equipment’s while electrical products includes Engineer
system may leads to working. double insulated cables and
electrical shock, burns industrial plug points.
and injuries from
exposure to arcing. 4. Warning signs provided.
8. NOISE WHO MIGHT BE 1. Quality ear plugs are provided to 1. In case of any damaged 2 Months Mechanical
HARMED? the workers and employees to mechanical parts are used, it is to Engineer
At the top of the contract labours, wear. be replaced.
reactor, agitator shaft trainees, supervisor,
and other rotary technicians working in 2. Checked the noise level of the 2. Display the earplug to be used 1 Week Safety
devices operated by and around the plant mechanical parts and other motor safety sign in the noisy area. Supervisor
the electrical motor area (near reactor). equipment’s.
causes a high level of
noise and vibration 3. Employees and other co- 3. Reduce the shift pattern in the 2 Weeks Plant
while doing HCL HOW workers are wearing the personal working place, who are working in Manager
preparation. When the protective equipment’s or not is high noisy area.
excessive noise exists monitored.
the tolerable limit (85-
105 dB), noise 4. Prefer low noise producing 1 Month Maintenance
pollution occurs. This equipment. Manager
causes headache,
hearing problem, 5. Noise meter is to be installed in 1 Month Safety
stress, sleeping the work place area. Engineer
9. HEALTH WHO MIGHT BE 1. Safety water shower and eye 1. Giving adequate training to the 2 Weeks Safety
HARMED? wash shower are installed in workers by a competent person Manager
Chlorine is a Operators, chemical handling area. on MSDS (material safety data
dangerous chemical. Technicians, Fitters & sheet) to enhance safe handling
Inhalation of chlorine engineers who of chemicals.
gas or drinking highly working in chlorine
concentrated sources chemical plant, 2. Training provided to the workers 2. All workers should wear full 1 Week Safety Guard
of chlorine (such as especially who about the chemical substance and body acid protection suit while
household bleach) working on ejector, its hazards. visiting chlorine handling area.
can lead to vomiting, scrubber and HCL
coma and even handling area.
death. 3. Personal protective equipment’s 3. Chemical cartage mask should 1 Week Safety
such as chemical nitrile gloves, be readily available on chlorine Supervisor
HOW face shield is provided to avoid storage area.
There are direct contact of chemicals.
possibilities to spray
or splash of chemical 4. Sign boards such as mandatory, 4. In case of mishandling of 1 Month Maintenance
on person who doing caution, warning is placed in chlorine, water supply should be Manager
activities near chlorine chemicals handling area. available at the nearest point to
handling area. reduce the severity of any health
effects.
10. MANUAL WHO MIGHT BE 1.Using mechanical aid to lift and 1. Eliminating manual handling 3 Months Electrical
HANDLING HARMED? move the load. methods by implementing Manager
Production electrically operated equipment’s
Hazards helpers, trainees & and procedures to avoid health
associated with the supervisors, who are effects.
manual handling of all working in the
load materials can manual handling of 2. Making changes to the 2. Reduce the size and weight of 3 Weeks Warehouse
lead to neck and back barrels, boxes. workplace area to reduce distance load Supervisor
injuries, hernia, travelled, need for bending.
strains, sprains, HOW
musculoskeletal etc… Manual handling 3. Providing frequent breaks during 3. Adding handles to easy 2 Weeks Designing
activity done by the manual handling work. handling and grasp the loaded Engineer
workers have to lift materials.
and carry materials
and equipment by 4. Assessing workplace to ensure 4. Push the load by loading on the 1 Week Warehouse
using their own there is no obstruction the wheel trays rather than manual Supervisor
hands, heavy physical pathway. load handling.
work, poor workplace
design, moving,
transporting, lack of 5. Based on the individual 5. Avoid the need for manual 2 Months Warehouse
physical space, poor capability the job was assigned to handling. Manager
postures and actions. them.
6. Providing PPEs such as non- 2 Weeks Warehouse
slip footwear, foot protection and Supervisor
gloves to handle load.
11. SLIPS AND WHO MIGHT BE 1. Chemical spillage area and 1. Non slip footwear to be 2 Weeks Safety
TRIPS HARMED? pathway is barricaded to avoid the provided for the employees and Manager
managers, movement of persons over the co- workers to ensure slip
Fall off a person supervisor, operators, chemicals. accident.
happened due to the helpers, trainees who
Spillage of HCL and working on the
chlorine on the floor hydrochloric acid 2. Secondary walking platform 2. The floor surface is to be fully 3 Months Maintenance
surface. production and provided for trespassing the area. coated with anti-slipper proof Manager
handling plant area. materials and rough mats to be
provided.
HOW
While handling of 3. Housekeeping person provided 3. Providing proper personal 1 Week Safety
filling the chlorine on a to clean the chemical on the floor protective equipment’s to the Supervisor
MS barrel container during spillage. workers who worked in the
spillage of chemicals chemical filling area.
(wet surface)
happened on the 4. Safety sign boards (wet 2 Weeks Safety
pathway and floor surface) should be placed and Supervisor
surface causes slip, ensuring visibility of the sign
trip and fall hazard. board.
12. WORKING AT WHO MIGHT BE 1. Only competent and trained 1. MEWP’S (mobile elevating 2 Months Safety
HEIGHT HARMED? workers are allowed to work for work platform) should be provided Manager
The people erecting vessels and reactors. during height work.
Fall of a person working at height such
and objects, tools as Technicians,
materials while engineers, supervisor, 2. Scaffolding provided while 2. Ladders, equipment’s and tools 1 Week Safety
handling from top of operators and during height work. should be inspected and colour Supervisor
the building are the trespassers who coding to be given.
hazards associated working nearby the
with working at height work. 3. Providing personal protective 3. Safety nets, soft landing 2 Months Safety
height. equipment’s while doing height system should be available while Engineer
work. during height work.
HOW
While erecting the 4. Full body safety harness 4. Double lanyard ropes should 2 Weeks Safety
reactors, pipe lines, provided to the worker who works be provided for the workers who Supervisor
vessels, storage tank, at height. are going to work at height.
at the height may
cause fall of a person 5. Emergency rescue plan and 5. Periodic inspection of scaffolds 1 Week Safety
and loose objects procedure are arranged. should be inspected by a Manager
while handling tools competent scaffolding inspector
and equipment’s. and tags are placed.
13. WORK WHO MIGHT BE 1. Earthing of tools and equipment 1. Providing (GFCI) ground fault 2 Months Electrical
EQUIPMENT AND HARMED? is made to ensure safety. current interrupter to avoid high Engineer
MACHINERY The workers who shock by electrical equipment.
handling power tools,
The portable power electrical equipment 2. Proper insulation of damaged 2. Electrical tools and equipment 1 Month Electrical
tools having the such as Engineers, wires are made. should be double earthed to Supervisor
potential to cause technicians, electrical ensure protection.
hazards such as arc- trainees & electrical
flash burn, thermal apprentice. 3. Caution, mandatory signs are 3. Lockout tagout system and 2 Weeks Electrical
burn or blast, electric provided in the workplace. procedure should be followed Engineer
shock, trip, fire and HOW during maintenance of electrical
explosion. Due to damaged equipment.
power tools and
improper handling of 4. Proper training is given to the 4. Double insulation is made on 1 Week Electric
electrical equipment, workers and employees who damaged wire and equipment. Engineer
during maintenance of handles electrical devices.
tools causes 5. Replacing the electrically 2 Months Electrical
electrocution and damaged tools and equipment. Manager
electric shock leads to
fire, explosion, electric 6. Necessary PPE’S should be 1 Week Electrical
shock, trip electric provided and make use of it, is to Supervisor
Specific legal arguments The ILO sets out an Occupational Safety and Health Recommendation, 1981 (R164) that
supplements convection (C155). Part IV of the Recommendation states that undertaking
(organisation) must:
Specific legal arguments According to the International Labour Organisation (ILO), Tagros chemicals has moral duty to
provide safe work environment to workers & also make sure that processes are reasonably safe. As
per specific set of regulations – Work at Height Regulations 2005,
• “The person who working at height, health conditions of individual to be monitored”.
Emergency rescue procedure should be readily available. The ILO codes of practice gives specific
advice on the measures, that employers must to protect workers against risks identified by a risk
assessment. Tagros chemicals should compliance with these regulations and standards. Failure to
follow these standards leads to repercussions, including workmen compensation.
Consideration of likelihood AND severity LIKELIHOOD:
The likelihood of incidents caused the work at height is very likely, because Tagros Chemicals has
more columns & tower maintenance works which has a potential to cause injuries to workers. Due
SEVERITY:
The severity of risks occurring could be major. Because if the workers may fall from height it leads
to irreversible disability or fatality and also ends up in repercussions. Impact of incidents considered
as negligible, minor, major, moderate and severe.
• Negligible - No medical treatment,
• Minor - Objective but reversible disability,
• Moderate - Irreversible disability,
• Major - Single fatality or severe irreversible disability,
• Severe - Multiple fatalities.
SEVERITY:
The severity of risk occurring could be Major, if workers exposed to toxic gas which may leads to
unexpected incident and accident on workplace with series injuries or disabilities.
In Case of any modification, changes in process, technology, updating legal requirements need to
review risk assessment as per plan:
How the risk assessment findings will be HOW THE RISK ASSESSMENT FINDINGS WILL BE COMMUNICATED:
communicated AND who you need to tell
I will arrange meeting with the unit head & the general manager to go through the risk assessment
& recommendation or actions given on risk assessment. I will provide summary of further actions
required and justification for those actions. I will explain about importance of risk assessment,
identified control measures to concern manager of chlorine chemical plant.
I will ask the concern manager to explain those actions to all workers and contract person in
upcoming toolbox talks. I will also advice the workers on the action that are to be taken. Special
training, refreshment training (video & audio) conduct for workers in their own language. A
summary of risk assessment & control actions will be posted on the company intranet and notice
boards, bulletin boards and power point presentations.
Weekly once meetings will be conducted with responsible person to find out work progress of each
action. Based on meetings, required resources like man power, material, fund allocation will be