Unit IG2: Risk assessment

Declaration: By submitting this assessment (Parts 1 – 4) for marking I declare that it is entirely my own work. I understand that falsely claiming that
the work is my own is malpractice and can lead to NEBOSH imposing severe penalties (see the NEBOSH Malpractice Policy for further information).

Important note: You must refer to the document ‘Unit IG2: risk assessment – Guidance and information for learners and Learning Partners’ while
completing all parts of this assessment. Your Learning Partner should provide you with a copy, but it can also be downloaded from the relevant
resources section for this qualification on the NEBOSH website.

Part 1: Background

You should aim to complete this section in 150 - 200 words.


Topic Comments
Name of organisation* Chamundi baking oven manufacturing private limited
Site location* Kumbakonam, Tamilnadu, India
Number of workers 25
Chamundi oven manufacturing private limited is a small scale oven production firm. The
company mainly produces oven, flour blender and bakery equipment’s. the main client
Of this firm is ABC bakery owner association. The ongoing project of this company
making micro oven for his client. The firm divided in to 5types based on working area
1)production area 2) welding area 3)ndt area 4) Fabrication area 5) quality control area.
The firm mainly works on Sheet metal works like sheet metal cutting, sheet metal cutting,
General description of the organisation
sheet metal rolling, sheet metal rolling, Fabrication, Forging, Welding, Sheet metal rust
removing, Forging, Drilling. The firm has 2 shifts. Shift Timing is 8am to 8pm and second
shift is 8.30pm to 7.30am. The lunch break of first shift is 12pm. And second shift lunch
time is 10pm. Sunday is holiday for management

The risk assessment will cover sheet metal cutting area, welding area, storage area, ndt
Description of the area to be included in the
inspection area, drilling area, grinding area that all Come under production area.
risk assessment
.
Any other relevant information The “Plant Incharge” who directly response for health and safety system.

Learner number:00713303 Learner name: VISHNURAM GNANI SUNDAR. Page 1 of


15
* If you’re worried about confidentiality, you can invent a false name and location for your organisation but, all other information provided must be
factual.

You should aim to complete this section in 100 - 200 words.


Note: this section can be completed after you have competed your risk assessment.
I look in to ILO website. There had lot of codes of practice relating to manufacturing industry.
The British hse website had lots of resource about manufacturing safety procedure. and I also
Outline how the risk assessment was refers website of IAEA (international atomic energy agency) for radiation hazards and safety
carried out this should include: measures. Website:
https://www.ilo.org/legacy/english/protection/safework/cis/products/safetytm/chemcode/02.html
• sources of information
Website: https://www.hse.gov.uk/guidance/index.html
consulted;
Website: https://www.iaea.org/newscenter/nuclear-explained.html
• who you spoke to; and
After taking the resource I went to this company and talked with workers who were doing the
• how you identified: job. They helped me to identify the hazard in inside of the company and noted the existing
- the hazards; control measure in work place. EX lots of workers don’t know the purpose of earmuff and they
- what is already being done; don’t know the how to use the ear muff.
and I also checked an accident report and near miss record. And also consider previous accident
- any additional and injuries over the 1 year .and also check the reason for employee’s attendance.
controls/actions that may I referred back to the notes that I making during the inspection and the obtained information
be required. from inspection that help me to take the further control measure.

Learner number:00713303 Learner name: VISHNURAM GNANI SUNDAR. Page 2 of


15
Part 2: Risk Assessment

Organisation name: Chamundi baking oven manufacturing private limited


Date of assessment: 13/10/2022
Scope of risk assessment: sheet metal cutting area, welding area, storage area, ndt inspection area, drilling area, grinding area that all
Come under production area.

Hazard category Who might be harmed What are you already What further controls/actions Timescales
and hazard and how? doing? are required? for further Responsible
actions to be person’s job title
completed
(within …)
1) Fire Welding inspector, welder, The company already had a The management want to buy a fire Welding engineer
welding helper this people warning sign board. blanket and provide to welding 12 days
Missing of Fire may be faced a fire accident The company already had a processing area
blankets in welding due to the missing of fire sufficient number of fire The management want to appoint an 1 month H.R.department
area during the blanket. extinguisher. experienced fire watcher.
welding process If the accident happens The company already had a The management want to conduct a
above mentioned people the competent welder. fire safety and first aid program 10 days Safety head
management want to be face The management want to provide a
like burn, heat smoke, proper house keeping 10 days Housekeeping
breathing problems. incharge
The management want to isolate
flammable material from welding 20 days
zone Welding engineer

The management want to provide a 10 days Safety head


ppe to workers

2) Radiation Ndt technician, ndt engineer, The management already The management want to barricade 10 days Maintenance head
In the ndt Helper, housekeeper, this prohibit eating, drinking in uv the radiation area to avoid entry of (action 1 and 2)
inspection area there people are mainly working light radiation people
is a uv lamp for under the uv lamp. So this Area The management want to buy a
magnetic -particle people may be facing like . radiometer for measure uv light 30 days
inspection that uv radiation
Learner number:00713303 Learner name: VISHNURAM GNANI SUNDAR. Page 3 of
15
Hazard category Who might be harmed What are you already What further controls/actions Timescales
and hazard and how? doing? are required? for further Responsible
actions to be person’s job title
completed
(within …)
lamp emits high Redding on eyes, blindness, They already had a warning The management want to reduce a
intensity uv rays premature aging, skin cancer signboard about radiation. working hours of employees who
So it comes under working under uv light. 20 days Ndt engineer
non -iozing radiation. The management already The management want to increase (Action 3 and 5)
conduct awareness campaign the man power for reducing stress on
about radiation to workers existing workers 20 days H.R.department
The management want to conduct an
inspection with in a regular time
interval. 15 days

3) Electricity The laser machine operator, The management was already The management want to barricade 15 days Maintenance head
In the House keeper, visitor and if conduct a safety program the danger area and avoid a further (action 1,2, and 4)
production area there any person touch the about electric accidents people entry.
is a running laser damaged plug that person The management was also The management want to replace a
machine that machine may be face electric accident conduct a first aid program damaged plug to new plug 10 days
has a damaged plug it and injuries like skin burns, about electric accidents
may be leads to cuts, muscle tamer, death They already isolate a The management want to hire an
electric accident flammable materials from this experienced electrician for an 30 days H.R.department
area electrical maintenance
The management want to conduct an 15 days
inspection with in a regular time
interval
The management want to provide a
proper house keeping 10 days House keeping
incharge
The management want to provide a
ppe to workers 12 days
Safety head

Learner number:00713303 Learner name: VISHNURAM GNANI SUNDAR. Page 4 of


15
Hazard category Who might be harmed What are you already What further controls/actions Timescales
and hazard and how? doing? are required? for further Responsible
actions to be person’s job title
completed
(within …)
4) Hazardous Ndt operator, housekeeper, The management was already The management want to barricade
substance(CHEMIC helper, visitor and other conduct a safety program the danger area and avoid a further 10 days Maintenance
AL) person who enter in material about Hazardous substance people entry. head(Action 1 to3)
IR-192, CO-60 stored ndt area without The management was also the management want to prohibit 10 days
are used for proper safety equipment’s. conduct a first aid program eating, drinking in this area
producing “Gama” That person may be face like about Hazardous substance. The management want to provide a
rays in ndt testing. vomiting, headache, eye They already had a warning suitable storage area for this
That material irritation, and death. signboard about Hazardous materials. 10 days
improperly stored in substance The management want to provide a House keeping
ndt area. proper house keeping 10 days incharge
The management want to conduct an
inspection with in a regular time Ndt engineer
interval 15 days
The management want to provide a Safety head
ppe to workers 10 days

5) Slips and trips Workers, visitor, production They already had a warning The management want to barricade 10 days Maintenance head
Oil leakage in charge, supervisor, and signboard about oil leakage the danger area and avoid a further
from hydraulic other person who enter in oil The management was already people entry.
bending machine in leak zone that person face conduct a safety program The management want to stop the oil
production area slips and trips injuries like about slips and trips injuries leak from the tank by using suitable 10 days Maintenance head
. broken bones, cuts, muscle The management was also methods
. sprain, and death conduct a first aid program The management want to provide a
about slips and trips injuries. proper house keeping 10 days House keeping
. The management want to conduct an incharge
inspection with in a regular time
interval 15 days
Production head
The management want to provide a
ppe to workers 10 days
Safety head.

Learner number:00713303 Learner name: VISHNURAM GNANI SUNDAR. Page 5 of


15
Hazard category Who might be harmed What are you already What further controls/actions Timescales
and hazard and how? doing? are required? for further Responsible
actions to be person’s job title
completed
(within …)
6) Noise A roller operator, production They already had a noise The management want to barricade 10 day Maintenance head
The sheet in charge, visitor, and other measuring device. the danger area and avoid a further
metal roller machine person who hear the noise The management was already people entry.
create an unbearable that persons also face like a conduct a safety program The management want to provide ear 13 days Safety head
noise in production permanent threshold shift, about noise muff to all workers
area tinnitus, acoustic trauma They already had a warning The management want to provide a
sign about noise proper lubrication that avoids a 15 days Maintenance head
friction noise.
The management want to conduct a
proper inspection with in a proper 12 days Maintenance head
time interval.
The management want to conduct a
risk assessment that helps to find out 10 days Safety head
root cause problems.
The management want to hire a
competent workers for maintenance 10 days H.R.department
.

7) Vibration A drilling machine operator The management was already The management want to use glue 12 days Maintenance head
Hand arm continuously contact with conduct a safety program instead of fasteners. .
vibration created from drilling machine.so operator about vibration The management want to provide a 12 days Maintenance head
drilling machine in the management want to They was already conduct a proper lubrication that reduce a level
production area affect with hand arm first aid training program about of vibration.
vibration effects like nerve hand arm vibration effects The management want to hire a new 10 days H.R.department
damage, muscle weakling They was already reduce employee that reduce a working
Joint damage, white finger. working time of worker. pressure.
The management want to conduct a 12 days Production head
proper inspection with in a proper
time interval.

The management want to provide a 10 days House keeping


proper house keeping incharge

The management want to provide 10 days Safety head


ppe to workers
Learner number:00713303 Learner name: VISHNURAM GNANI SUNDAR. Page 6 of
15
Hazard category Who might be harmed What are you already What further controls/actions Timescales
and hazard and how? doing? are required? for further Responsible
actions to be person’s job title
completed
(within …)

8) Slips and trips Scrap collector, loft room The management was already The management want to barricade
In production incharge visitor, and house conduct a safety program the danger area and avoid a further 11 days Maintenance head
area there is a loft keeper, and any other about slips and trips injuries. people entry.
room which is used person who used that They was already reduce The management want to replace a
for storing a scrap damaged ladder they also working time of worker new ladder to damaged one. 10 days Production head
materials. The loft face like a slips and trips The management want to provide
room and production injuries such as broken They already had a warning fibre ladder for avoid a rust formation 10 days Production head
area connected by bones, cuts, muscle sprain, signboard about damaged The management want to conduct a
ladder. That ladder and death. ladder. proper inspection with in a proper
has one damaged time interval. 10 days Maintenance head
rung. The management want to provide a
proper house keeping 11days House keeping
incharge
The management want to provide a
ppe to workers. 12 days Safety head

9) Radiation Ndt operator, housekeeper, The management already The management want to barricade 11 days Maintenance head
IR-192, CO- helper, visitor and other prohibit eating, drinking in the radiation area to avoid entry of
60 are used for person who enter in radiation radiation people
producing “Gama” zone without proper safety Area The management want to build a lead 10 days Maintenance head.
rays in ndt testing. It equipment’s. That person They already had a radiation shield wall around the radiation
is comes under may be face like vomiting, measuring device. material storage area
ionizing radiation. headache, eye irritation, and They already had a warning
death. signboard about radiation. The management want to provide a 12 days Ndt engineer
awareness campaign about radiation
to workers

Learner number:00713303 Learner name: VISHNURAM GNANI SUNDAR. Page 7 of


15
Hazard category Who might be harmed What are you already What further controls/actions Timescales
and hazard and how? doing? are required? for further Responsible
actions to be person’s job title
completed
(within …)
The management want to reduce a
working hours of employees who 15 days H.R.department
working under radiation.
The management want to increase
the man power for reducing stress on 10 days Maintenance head
existing workers
The management want to conduct an
inspection with in a regular time 10 days Safety head
interval.

10)Hazardous Operator, housekeeper, The management was already The management want to barricade 10 days Maintenance head
substance: helper, visitor and other conduct a safety program the danger area and avoid a further
During the person who enter in dust about Hazardous substance people entry.
machining process zone without proper safety The management was also The management want buy a dust 30 days Maintenance head
iron dust produced equipment’s That person conduct a first aid program extraction system
and completely may be face like vomiting, about Hazardous substance. the management want to prohibit
spread in production pulmonary siderosis , lung They already had a warning eating, drinking in this area 11 days Maintenance head
area. diseases, headache, eye signboard about Hazardous The management want to provide a
irritation, and death. substance proper house keeping 11 days House keeping
incharge
The management want to conduct an
inspection with in a regular time 10 days Maintenance head
interval
The management want to provide a
ppe to workers 10 days Safety head

Learner number:00713303 Learner name: VISHNURAM GNANI SUNDAR. Page 8 of


15
Part 3: Prioritise 3 actions with justification for the selection
Suggested word counts
Moral, general legal and financial arguments for all actions: 300 to 350 words
For EACH action:
Specific legal arguments: 100 to 150 words
Likelihood AND severity: 75 to 150 words
How effective the action is likely to be in controlling the risk: 100 to 150 words

Moral, general legal and financial arguments for ALL actions

Moral, general legal and financial Moral arguments:


arguments
This company has moral rights to protect its workers. Every workers has a
rights to work in safety place. This company also has a moral duty to protect his workers
from injuries and accidents. Each worker come to work for earn wages. Through this wages
he full will his and his family needs.in case the worker faces an injuries that will be
decrease the morale of the other workers also. That will reflect in company production.so
the profit will be decrease. if injuries happen to workers the society will not accept this and
do not accept that the workers has to be injured to feed their families. If injuries happens
that will be affect the other workers morale. They will also affect mental health of other
worker. The employer gets profit through a worker performance. So employer has moral
right to protect their workers.
Financial arguments:
When the accident occurs there will be direct and indirect loss there.
Direct cost will be recovered by insurance and indirect cost is not recover. Ex if property or
machine or vehicle damaged it will be covered under insurance but if workers will injured
we want to hire a new worker that cost can’t be recovered. During the training period
workers we will stop the production so that cost also loss for company.so if legal action
taken against the company that cost also loss for management. And also good will of the
customer may be decreases so new order newer comes to company and old order may be

Learner number:00713303 Learner name: VISHNURAM GNANI SUNDAR.


Page 9 of 15
cancelled. And investor take back his invest from the company. and company lost his
market value.

Legal arguments:
This company has legal requirements to protect its workers under the ILO
safety and health convection. C 155 says
Every country has try to protect his employer in work place. So they formed
a rules and regulation and legal standards. And any organisation failed to meet this
standards or failed to follow the rules that organisation will face legal action like fine,
imprisonment, and court case. If company continuously violate the rules company will be
face a ban.

Justification for action 1

(Hazard category –fire s.no 1 control action 1)The management want to buy a fire blanket and
Action
provide to welding processing area

Specific legal arguments The ILO sets the recommendation on occupational safety and health that supplements convection
c155 part 4 says
Provide and maintain work places machinery and equipment and use the work
methods, which are as safe and without to health as is reasonably practicable
And also every country also have legal structure that helps to protect the legal .rights of employees
if any one violates that rules the enforcement directory will take severe action against the
organisation. That action may be fine, or legal activities or imprisonment or temporary ban or
permanent ban. So organisation should follow the legal procedure of the country.
Consideration of likelihood AND severity The likelihood of occurrence of accident if the fire blanket not purchased will be very high. In
welding area there are 5 workers working in this area. This workers has a two shift working system.
Each workers should works to 7 to 11 hours compulsory in a week because welding is the one of
the essential activity of this company. If any obstacles happen during this process that could affect

Learner number:00713303 Learner name: VISHNURAM GNANI SUNDAR.


Page 10 of 15
the entire organization. If any fire accidents happen this area 5 workers and property of the
organisation will be damaged. So we need to provide a fire blanket for minimise the risk level of fire.
.
When considering the severity. I set 4 categories
Major injury requiring to hospital treatment. And property damage
Minor injury requiring to first aid treatment
Minimal no injury or damage
Catastrophic death and irreparable damage
The severity rating for this hazard is catastrophic because if the accident happens the 5 workers will
be face a possibility of death in case death not happen the worker will face like skin burn, and
respirational problems. And also property damage will be happen,
..

How effective the action is likely to be in


. Fire blanket protect workers from high intensity heat. It can use against flames of over 260
controlling the risk. This should include:
degrees. They can also withstand a molten metal splash up to 1200 degree which is way higher
• the intended impact of the action; than industrial fires. The fire blanket will be reduce the possibility of fire during the welding process.
• justification for the timescale that you And it increases the safety of worker and workplace during the welding.
indicated in your risk assessment; I will give 12 days’ time scale for buy a fire blanket and to provide to welding area. The welding
and engineer has taken responsibility of this action.
• Whether you think the action the
management want to fully control the This action will be fully control the risk as long as fire blanket is used. The proper maintenance and
risk. inspection of fire blanket also decrease the percentage of risk

Justification for action 2

The management want buy a dust extraction system. (Hazard category –hazardous
Action
substance(Dust) s.no 10 control action 2)
Learner number:00713303 Learner name: VISHNURAM GNANI SUNDAR.
Page 11 of 15
The ILO convention c155 and r164 recommendation says employers to make sure that process are
Specific legal arguments
Reasonably safe. The code of practice safety in the use of chemicals at work advices to employer
that protect his workers against the risk identified by an risk assessment.
The ILO code of practice recording and notification of occupational accidents and diseases
Requires employers to report cases of occupational respirational diseases to our country health and
safety regulator.
And also all countries have a legal standards if organization contravened that standards
enforcement agency will take the action against the organization that action may be fine or
imprisonment.
Consideration of likelihood AND severity The likelihood of occurrence of accident if the dust extractor not purchased very likely. In production
area there is a process called machining that process create a dust in production area. In
production area there are 10 workers working in this area. This workers has a two shift working
system. Each workers should works to 7 to 11 hours per week compulsory because machining is
the one of the essential activity of this company. If any obstacles happen during this process that
could affect the entire organization. The dust extractor will be reduce the possibility of dust
inhalation during the machining process. And it increases the safety of worker and workplace during
the machining.
When considering the severity. I set 4 categories
Major injury requiring to hospital treatment.
Minor injury requiring to first aid treatment
Minimal no injury or damage
Catastrophic death and irreparable damage
The severity rating for this hazard is minor. In production area there are 10 workers if dust extractor
not present the dust inhalation percentage will be increase. And That people will also face vomiting,
pulmonary siderosis , lung diseases, headache, eye irritation due to dust.

How effective the action is likely to be in


Dust extractor is device which generally drawing dust and particulates from the air through a filter
controlling the risk. This should include:
that captures and separates the matter and then discharges purified air back in to the work place.
• the intended impact of the action; The dust extractor will be reduce the possibility of dust during the machining process. And
increases the safety of worker and workplace during the machining.

Learner number:00713303 Learner name: VISHNURAM GNANI SUNDAR.


Page 12 of 15
• justification for the timescale that you I will give 30 days’ time scale for buy a dust extractor and to provide to machining area. The
indicated in your risk assessment; maintenance head has taken responsibility of this action.
and
• whether you think the action the This action will be fully control the risk as long as dust extractor is used. The proper maintenance
management want to fully control the and inspection of dust extractor also decrease the percentage of risk
risk.

Justification for action 3

The management want to build a lead shield wall around the radiation material storage ndt area
Action
. (Hazard catergory –radiation s.no 9 control action 2)

Specific legal arguments The ILO sets the recommendation on occupational safety and health that supplements convection
c155 part 4 says
Provide and maintain work places machinery and equipment and use the work
methods, which are as safe and without to health as is reasonably practicable.
The IAEA (international atomic energy agency) codes aims at Helping national authorities to ensure
that radioactive sources are used within appropriate framework of radiation safety and security. And
it also tells about radiation safety and control measures. This code is well accepted in more than
130 countries.
And also every country also have legal structure that helps to protect the legal .rights of
employees if any one violates that rules the enforcement directory will take severe action against
the Organisation
.
Consideration of likelihood AND severity The likelihood of occurrence of accident if the lead wall not build will be very high In ndt area there
is radio graphic testing happening by use of IR-192, CO-60 for producing “Gama” rays. In that
radiation material improperly stored in that area. There are 7 workers are working in two shifts. That
workers spends more than 11 hours(per week) in there. If any obstacles happen during this process
that could affect the entire organization. The lead shield wall will be reduce the possibility of
radiation around the improperly radiation material stored area. And it also increases the safety of
worker and workplace during the ndt activities.
When considering the severity. I set 4 categories
Major injury requiring to hospital treatment.
Learner number:00713303 Learner name: VISHNURAM GNANI SUNDAR.
Page 13 of 15
Minor injury requiring to first aid treatment
Minimal no injury or damage
Catastrophic death and irreparable damage
The severity rating for this hazard is major if the lead wall is not provided that 7 workers also face
like vomiting, headache, eye irritation, and death.

How effective the action is likely to be in


Lead shield is most effective shield material to fight gamma ray and x rays. After all lead has a very
controlling the risk. This should include:
high number of protons in each atom which makes it very dense metal shield and it provide
• the intended impact of the action; protection from penetrating radiation such as gamma rays and x rays
• justification for the timescale that you The lead shield will be reduce the possibility of radiation in radiation material storage ndt area .
indicated in your risk assessment; And it increases the safety of worker and workplace.
and
• whether you think the action the I will give 10 days’ time scale for build a lead shield to provide to all worker in that area.The
management want to fully control the maintenance head has taken responsibility of this action.
risk. This action will be fully control the risk as long as lead shield is used. The proper maintenance and
inspection of radiation shield will also decrease the percentage of risk
Part 4: Review, communicate and check
Suggested word counts for each section:
• Planned review date or period and reasoning for this: 50 - 100 words
• How the risk assessment findings the management want to be communicated and who needs to know the information: 100 -
150 words
• Follow up on the risk assessment: 100 - 150 words.

Planned review date/period with Every company review their policy once in year. I therefore set the review date to be no later than
reasoning 12/10/2023. If any change in organisational policy, machine, material, organisational structure, legal
standard, work place the review will be conduct again. That date will be consider as a new review
date.
How the risk assessment findings the I will meet with plant incharge to go through and assign the action in the risk assessment. I will
management want to be communicated provide summary of assessment to production head, maintenance head, and welding engineer. the
AND who you need to tell risk assessment copy will be paste on the company notice board. The workers also need to know
about the new control measures. A summary of the risk assessment also posted in company

Learner number:00713303 Learner name: VISHNURAM GNANI SUNDAR.


Page 14 of 15
website and social media page. That helps every one of the company will access the risk
assessment report.
How you the management want to follow I will set the reminders for ten days before the action is due to be completed. I will inform to the
up on the risk assessment to check that responsible person for each of the actions taken. And find the progress level of each action. If the
the actions have been carried out progress of the very poor I will find out the reason why eg if the reason is finance or other issues . I
will talk to respective department and try to rectify the issues. If any action not completed within the
time period I will speak to plant incharge and asking more resources for the action. If the action are
very overdue will be referred to the managing director via plant incharge.

Learner number:00713303 Learner name: VISHNURAM GNANI SUNDAR.


Page 15 of 15