You are on page 1of 3

Hopper Granulation - Repair Report

Hopper leaked at 4 points and already repaired


and finish test Ra and Koslow

Rey Lee
CRYOGAS,PT
18 Oct 2022

Produced using Site Report Pro for iOS


Hopper Granulation - Repair Report 18 Oct 2022

Project Details

Name: Hopper Granulation -


Repair Report

Summary: Hopper leaked at 4 points


and already repaired and
finish test Ra and Koslow

Reference: No Reference

Description: No Description

Status: Completed (07 Oct 2022)

Started: 07 Oct 2022

Client Company: PT Bintang Toedjoe

Client Name: Bp Kristandi

Client Telephone: No Client Telephone

Client Email: No Client Email

Auditor Company: CRYOGAS,PT

Auditor Name: Rey Lee

Total Issues: 2

Hopper Granulation - Repair Report Page 2 of 3

Produced using Site Report Pro for iOS


Hopper Granulation - Repair Report 18 Oct 2022

Ra test

Due Date: 18 Oct 2022


Priority: No Priority
Status: New
Tags: Green

Reference: No Reference
Location: No Location
Created: 18 Oct 2022
Assigned To: Me
Reviewed By: No Reviewer

Description Comments
After repair Ra acceptable in range 18 Oct 2022 at 3.58 PM
Ra accepted

Koslow test

Due Date: 07 Oct 2022


Priority: No Priority
Status: New
Tags: Green

Reference: No Reference
Location: No Location
Created: 18 Oct 2022
Assigned To: Me
Reviewed By: No Reviewer

Description Comments
After repair then do cleaning and passivation , and test with 18 Oct 2022 at 4.00 PM
koslow Stainless steel passivated

Hopper Granulation - Repair Report Page 3 of 3

Produced using Site Report Pro for iOS

You might also like