Professional Documents
Culture Documents
Hopper Granulation - Repair Report-V2
Hopper Granulation - Repair Report-V2
Rey Lee
CRYOGAS,PT
18 Oct 2022
Project Details
Reference: No Reference
Description: No Description
Total Issues: 2
Ra test
Reference: No Reference
Location: No Location
Created: 18 Oct 2022
Assigned To: Me
Reviewed By: No Reviewer
Description Comments
After repair Ra acceptable in range 18 Oct 2022 at 3.58 PM
Ra accepted
Koslow test
Reference: No Reference
Location: No Location
Created: 18 Oct 2022
Assigned To: Me
Reviewed By: No Reviewer
Description Comments
After repair then do cleaning and passivation , and test with 18 Oct 2022 at 4.00 PM
koslow Stainless steel passivated