Quotation

ATTENTION : Date

PROJECT :

to be fill up

ITEM DESCRIPTION OF WORK QTY UNIT material cost labor cost TOTAL AMOUNT

1.0 mobilization / equipment 1.00 lot 30,000.00 30,000.00

2.0 Supply & Installation of CHB masonry 210.60 sqm 550.00 220.00 162,162.00

3.0 Plastering works 420.20 sqm 300.00 120.00 176,484.00

4.0 Stiffener Columns 10mm rebars 4.80 cum 4,200.00 1,680.00 28,224.00

5.0 Supply & Installation of Angular Gate and grills


with accessories 11.00 pcs 3,600.00 1,440.00 55,440.00

TOTAL AMOUNT 452,310.00

Prepared by