You are on page 1of 74

Daily Permit To Work Tr

Permit
Contract
S.no Date or Name to Work Permit to Work Type Work Activity
Number

136 3/1/2022 SUROJ 1411 GENERAL WORK ROD CUTTING

137 3/1/2022 SUROJ 300/92 EXCAVATION WORK EXCAVATION WORK

FOOTING, SHUTTERING,
138 3/1/2022 SUROJ 1231 CONFINED SPACE
REINFORCEMENT, CONCRETE

139 3/1/2022 SUROJ 535 HEIGHT WORK

140 3/1/2022 SUROJ 1232 CONFINED SPACE PCC, SOIL LEVELLING

141 3/1/2022 SUROJ 1455 GENERAL WORK SHUTTERING, PCC, SOIL LEVELLING

142 3/1/2022 SUROJ 1409 GENERAL WORK SHUTTERING, PCC, SOIL LEVELLING,
REINFORCEMENT

EXCAVATION WORK, PCC, SOIL


143 3/1/2022 SUROJ 1230 CONFINED SPACE
LEVELLING

144 3/1/2022 SUROJ 1457 GENERAL WORK SOIL FILLING, COMPACTION, CURING

GSB LOADING, UNLOADING,


145 3/1/2022 SUROJ 1456 GENERAL WORK
LEVELLING

SOIL LOADING & UNLOADING


146 3/1/2022 SUROJ 1412 GENERAL WORK PEDESTAL CASTING, CONCRETE
WORK

147 3/1/2022 SUROJ 1234 CONFINED SPACE CONCRETE WORK


148 3/1/2022 SUROJ 300/87 EXCAVATION WORK EXCAVATON

149 3/1/2022 SUROJ 300/91 EXCAVATION WORK EXCAVATION ROLLING

150 3/1/2022 SUROJ 1233 CONFINED SPACE SOIL DRESSING,PCC, MARKING


151 3/1/2022 SUROJ 1410 GENERAL WORK PCC, SOIL LEVELLING
152 3/1/2022 SUROJ 300/90 EXCAVATION WORK SOIL EXCAVATION
153 3/1/2022 SUROJ 1408 GENERAL WORK PCC, SOIL LEVELLING

154 3/2/2022 SUROJ 1413 GENERAL WORK TOP SOIL REMOVING & SHIFTING

155 3/2/2022 SUROJ 300/93 GENERAL WORK TOP SOIL REMOVING & SHIFTING

156 3/2/2022 SUROJ 1418 GENERAL WORK LIGHT FITTING


157 3/2/2022 SUROJ 1235 CONFINED SPACE PEDASTAL WORK
158 3/2/2022 SUROJ 1414 GENERAL WORK SOIL LEVELLING
159 3/2/2022 SUROJ 300/94 EXCAVATION WORK SUBSTATION AREA EXCAVATION
160 3/2/2022 SUROJ 1416 GENERAL WORK TEMPORARY ROAD WORK

161 3/2/2022 SUROJ 1417 GENERAL WORK ROAD SOIL FILLING

162 3/2/2022 SUROJ 300/94 EXCAVATION WORK EXCAVATION WORK

163 3/2/2022 SUROJ 1237 CONFINED SPACE REINFORCEMENT SHUTTERING

164 3/2/2022 SUROJ 1458 GENERAL WORK SHUTTERING, PCC

165 3/2/2022 SUROJ 1415 GENERAL WORK SHUTTERING, SOIL LEVELLING


166 3/2/2022 SUROJ 1296 CONFINED SPACE SHUTTERING, SOIL LEVELLING
167 3/2/2022 SUROJ 300/93 EXCAVATION WORK EXCAVATION WORK

168 3/2/2022 SUROJ 300/95 EXCAVATION WORK EXCAVATION WORK


169 3/2/2022 SUROJ 1459 GENERAL WORK GENERAL WORK

UTILITY BUILDING, SUBSTATION


170 3/2/2022 SUROJ 1414 GENERAL WORK WORK

171 3/2/2022 SUROJ 1235 CONFINED SPACE SHUTTERING, PCC

172 3/2/2022 SUROJ 300/94 EXCAVATION WORK EXCAVATION WORK

173 3/2/2022 SUROJ 537 HEIGHT WORK CHANNEL SUPPORT WORK


174 3/2/2022 SUROJ 1416 GENERAL WORK ROAD WORK

175 3/2/2022 SUROJ 1419 GENERAL WORK PEDASTAL CASTING,

176 3/2/2022 SUROJ 536 HEIGHT WORK PEDASTAL CASTING

177 3/2/2022 SUROJ 1238 CONFINED SPACE FOOTING CASTING

178 3/2/2022 SUROJ 300/90 EXCAVATION WORK FOOTING CASTING

179 3/3/2022 SUROJ 300/96 EXCAVATION WORK EXCAVATION


180 3/3/2022 SUROJ 1461 GENERAL WORK TOP SOIL REMOVING & SHIFTING

181 3/3/2022 SUROJ 1460 GENERAL WORK TOP SOIL REMOVING & SHIFTING

182 3/3/2022 SUROJ 300/99 EXCAVATION WORK CHAIN LINE FENCING

183 3/3/2022 SUROJ 1462 GENERAL WORK CHAIN LINE FENCING

184 3/3/2022 SUROJ 1421 GENERAL WORK TOP SOIL REMOVING

185 3/3/2022 SUROJ 1422 GENERAL WORK SOIL REMOVING

186 3/3/2022 SUROJ 1463 GENERAL WORK PCC


187 3/3/2022 SUROJ 1241 CONFINED SPACE PCC, REINFORCEMENT

188 3/3/2022 SUROJ 300/97 EXCAVATION WORK EXCAVATION

189 3/3/2022 SUROJ 1420 GENERAL WORK REINFORCEMENT SHUTTERING

190 3/3/2022 SUROJ 1240 CONFINED SPACE REINFORCEMENT SHUTTERING

191 3/3/2022 SUROJ 1242 CONFINED SPACE SHUTTERING, DESHUTTERING

192 3/3/2022 SUROJ 1223 GENERAL WORK SHUTTERING, DESHUTTERING


193 3/3/2022 SUROJ 1425 GENERAL WORK TOP SOIL REMOVING

194 3/3/2022 SUROJ 1243 CONFINED SPACE PCC, CONCRETE , SOIL DRESSING

195 3/3/2022 SUROJ 1464 GENERAL WORK FOOTING CASTING, PCC

196 3/4/2022 SUROJ 1429 GENERAL WORK HARD BARRICATION

197 3/4/2022 SUROJ 300/100 EXCAVATION WORK EXCAVATION WORK

198 3/4/2022 SUROJ 1245 CONFINED SPACE SOIL REMOVING, SOIL LEVELLING

199 3/4/2022 SUROJ 1266 GENERAL WORK SOIL REMOVING, SOIL LEVELLING

200 3/4/2022 SUROJ 539 HEIGHT WORK ELECTRICAL CABLE REMOVING


WORK

201 3/4/2022 SUROJ 1467 GENERAL WORK ELECTRICAL CABLE REMOVING


WORK
202 3/4/2022 SUROJ 300/101 EXCAVATION WORK EXCAVATION WORK
203 3/4/2022 SUROJ 1468 GENERAL WORK SOIL DRESSING,SOIL REMOVING
204 3/4/2022 SUROJ 1246 CONFINED SPACE SOIL DRESSING,SOIL REMOVING
205 3/4/2022 SUROJ 1427 GENERAL WORK SOIL DRESSING,SOIL REMOVING

206 3/4/2022 SUROJ 1426 GENERAL WORK TOP SOIL REMOVING

207 3/4/2022 SUROJ 300/99 EXCAVATION WORK EXCAVATION, PCC, SHUTTERING

208 3/4/2022 SUROJ 1244 CONFINED SPACE RCC, PCC, SHUTTERING

209 3/4/2022 SUROJ 1465 GENERAL WORK RCC, PCC, SHUTTERING


210 3/4/2022 SUROJ 1247 CONFINED SPACE PCC, SOIL DRESSING, FOOTING,
CASTING

211 3/4/2022 SUROJ 1470 GENERAL WORK PEDESTAL CASTING, FOOTING


CASTING

212 3/4/2022 SUROJ 1469 GENERAL WORK TOP SOIL REMOVING, SOIL LOADING
& UNLOADING

213 3/4/2022 SUROJ 300/97 EXCAVATION WORK TOP SOIL REMOVING

EXCAVATION WORK, SOIL LOADING


214 3/5/2022 SUROJ 1430 GENERAL WORK & UNLOADING

215 3/5/2022 SUROJ 300/106 EXCAVATION WORK EXCAVATION & LOADING

ROAD TOP SOIL REMOVING, SOIL


CUTTING LEVELLING, COMPACTION
216 3/5/2022 SUROJ 1431 GENERAL WORK
WITH ROLLER , TREE CUTTING,
MARKING, DEBRIS REMOVING

ROAD TOP SOIL REMOVING, SOIL


217 3/5/2022 SUROJ 1432 GENERAL WORK CUTTING LEVELLING, COMPACTION
WITH ROLLER , TREE CUTTING,
MARKING, DEBRIS REMOVING

ELECTRICAL PANEL CABEL


218 3/5/2022 SUROJ 1475 GENERAL WORK
DISCONNECTION
219 3/5/2022 SUROJ 540 HEIGHT WORK ELECTRICAL PANEL CABEL
DISCONNECTION

220 3/5/2022 SUROJ 1476 GENERAL WORK SOIL LEVELLING, SHUTTERING WORK

221 3/5/2022 SUROJ 1107 GENERAL WORK REINFORCEMENT SHUTTERING

222 3/5/2022 SUROJ 300/003 EXCAVATION WORK EXCAVATION

223 3/5/2022 SUROJ 1473 GENERAL WORK SHUTTERING & REINFORCEMENT


224 3/5/2022 SUROJ 1250 CONFINED SPACE SHUTTERING & REINFORCEMENT
225 3/5/2022 SUROJ 300/108 EXCAVATION WORK EXCAVATION

226 3/5/2022 SUROJ 1433 GENERAL WORK TOP SOIL REMOVING, SOIL LOADING
& UNLOADING

TOP SOIL REMOVING, SOIL LOADING


227 3/5/2022 SUROJ 300/96 EXCAVATION WORK
& UNLOADING

228 3/5/2022 SUROJ 1239 CONFINED SPACE PCC, SOIL DRESSING, CONCRETE

PCC, SOIL DRESSING, SOIL


229 3/5/2022 SUROJ 1479 GENERAL WORK EXCAVATION

230 3/6/2022 SUROJ 300/107 EXCAVATION WORK EXCAVATION

231 3/6/2022 SUROJ 1478 GENERAL WORK PCC, SOIL LEVELLING

232 3/6/2022 SUROJ 1480 GENERAL WORK WMM SPREADING & LEVELLING

233 3/6/2022 SUROJ 549 HEIGHT WORK SHUTTERING


234 3/6/2022 SUROJ 1481 GENERAL WORK SHUTTERING

TOP SOIL REMOVING, TREE


235 3/7/2022 SUROJ 1488 GENERAL WORK
CUTTING, SOIL LOADING

236 3/7/2022 SUROJ 300/108 EXCAVATION WORK UNLOADING, EXCAVATION &


LOADING

237 3/7/2022 SUROJ 1484 GENERAL WORK CURRING, BARRICATION, MATERIAL


SHIUFTING

238 3/7/2022 SUROJ 1107/01 CONFINED SPACE SCAFFOLDING, FOOTING

239 3/7/2022 SUROJ 300/104 EXCAVATION WORK EXCAVATION WORK

240 3/7/2022 SUROJ 1486 GENERAL WORK SOIL LEVELLING, PCC

241 3/7/2022 SUROJ 1107/02 CONFINED SPACE SOIL LEVELLING, PCC

242 3/7/2022 SUROJ 300/105 EXCAVATION WORK EXCAVATION WORK

243 3/7/2022 SUROJ 1487 GENERAL WORK LIGHT FITTING

244 3/7/2022 SUROJ 464 HEIGHT WORK LIGHT FITTING


245 3/7/2022 SUROJ 1485 GENERAL WORK BARRICATION, SOIL DRESSING
246 3/7/2022 SUROJ 1107/03 CONFINED SPACE REINFORCEMENT, SHUTTERING

SOIL LOADING & UNLOADING, PCC,


247 3/7/2022 SUROJ 1489 GENERAL WORK
CONCRETE
PCC, RCC, SHUTTERING,
248 3/7/2022 SUROJ 1107 CONFINED SPACE
REINFORCEMENT

249 3/7/2022 SUROJ 300/106 EXCAVATION WORK TOP SOIL REMOVING

EXCAVATION SOIL LOADING &


250 3/8/2022 SUROJ 1490 GENERAL WORK UNLOADING

EXCAVATION SOIL LOADING &


251 3/8/2022 SUROJ 30/111 EXCAVATION WORK UNLOADING

252 3/8/2022 SUROJ 30/110 EXCAVATION WORK EXCAVATION SOIL LOADING &
UNLOADING

253 3/8/2022 SUROJ 1491 GENERAL WORK GSB LEVELLING, DRESSING

254 3/8/2022 SUROJ 1494 GENERAL WORK CABLE REMOVING

255 3/8/2022 SUROJ 541 HEIGHT WORK CABLE REMOVING

256 3/8/2022 SUROJ 1107/08 CONFINED SPACE STEELSHUTTERING, CONCRETE


WORK

257 3/8/2022 SUROJ 300/117 EXCAVATION WORK SOIL EXCAVATION

258 3/8/2022 SUROJ 1107/09 CONFINED SPACE REINFORCEMENT, SHUTTERING


259 3/8/2022 SUROJ 1493 GENERAL WORK BARRICATION, SHUTTERING
260 3/8/2022 SUROJ 300/118 EXCAVATION WORK FOOTING EXCAVATION

261 3/8/2022 SUROJ 300/111 EXCAVATION WORK BARRICATION, EXCAVATION

262 3/8/2022 SUROJ 1107/06 CONFINED SPACE PCC, PEDESTAL

263 3/8/2022 SUROJ 1492 GENERAL WORK PCC, PEDESTAL

264 3/8/2022 SUROJ 1436 GENERAL WORK PCC, RCC, SHUTTERING,


REINFORCEMENT

265 3/8/2022 SUROJ 1107/07 CONFINED SPACE PCC, RCC, SHUTTERING

266 3/8/2022 SUROJ 300/19 EXCAVATION WORK EXCAVATION

EXCAVATION, SOIL LOADING &


267 3/9/2022 SUROJ 1437 GENERAL WORK UNLOADING, TREE CUTTING, TOP
SOIL REMOVING

268 3/9/2022 SUROJ 300/115 EXCAVATION WORK SOIL EXCAVATION

EXCAVATION, SOIL LOADING &


UNLOADING, TREE CUTTING, TOP
269 3/9/2022 SUROJ 1738 GENERAL WORK SOIL REMOVING, COMPACTION
WITH ROLLER, LEVELLING
270 3/9/2022 SUROJ 300/114 EXCAVATION WORK SOIL EXCAVATION

271 3/9/2022 SUROJ 1442 GENERAL WORK STEEL CUTTING & LIGHT FITTING

272 3/9/2022 SUROJ 1443 GENERAL WORK SHUTTERING & HARD BARRICATION

273 3/9/2022 SUROJ 300/16 EXCAVATION WORK EXCAVATION WORK

274 3/9/2022 SUROJ 1439 GENERAL WORK REINFORCEMENT, SHUTTERING

275 3/9/2022 SUROJ 1107/10 CONFINED SPACE REINFORCEMENT

276 3/9/2022 SUROJ 1440 GENERAL WORK PCC, KURBSTONE, WMM LEVELLING

277 3/9/2022 SUROJ 1444 GENERAL WORK BARRICATION WORK,


REINFORCEMENT

278 3/9/2022 SUROJ 1107/11 CONFINED SPACE BARRICATION WORK,


REINFORCEMENT
279 3/9/2022 SUROJ 300/119 EXCAVATION WORK EXCAVATION WORK
280 3/9/2022 SUROJ 300/16 EXCAVATION WORK EXCAVATION WORK

281 3/9/2022 SUROJ 1441 GENERAL WORK GENERAL WORK PERMIT WORK

282 3/9/2022 SUROJ 1107/09 CONFINED SPACE CONFINED SPACE

PCC, RCC, SHUTTERING,


283 3/9/2022 SUROJ 1445 GENERAL WORK
REINFORCEMENT
284 3/9/2022 SUROJ 1107/05 CONFINED SPACE PCC, RCC, SHUTTERING

285 3/9/2022 SUROJ 300/201 EXCAVATION WORK TOP SOIL REMOVING

WMM FILLING & LEVELLING


COMPACTION WITH ROLLER,TREE
SHIFTING PMC AREA, EXCAVATION
286 3/10/2022 SUROJ 1446 GENERAL WORK
LOADING & UNLOADING,
WEIGHBRIDGE ERECTION,
KURBSTONE, PCC, SHUTTERING

WMM FILLING & LEVELLING


COMPACTION WITH ROLLER,TREE
SHIFTING PMC AREA, EXCAVATION
287 3/10/2022 SUROJ 300/119 EXCAVATION WORK
LOADING & UNLOADING,
WEIGHBRIDGE ERECTION,
KURBSTONE, PCC, SHUTTERING

TOP SOIL REMOVING, LEVELLING,


288 3/10/2022 SUROJ 1447 GENERAL WORK UNLOADING OF SOIL, BT ROAD SOIL
LEVELLING & COMPACTION

TOP SOIL REMOVING, LEVELLING,


289 3/10/2022 SUROJ 300/118 EXCAVATION WORK UNLOADING OF SOIL, BT ROAD SOIL
LEVELLING & COMPACTION

290 3/10/2022 SUROJ 1448 GENERAL WORK SHUTTERING & SOIL LEVELLING
291 3/10/2022 SUROJ 300/126 EXCAVATION WORK EXCAVATION WORK

292 3/10/2022 SUROJ 1107/12 CONFINED SPACE SHUTTERING MATERIAL SHIFTING

293 3/10/2022 SUROJ 1450 GENERAL WORK SHUTTERING MATERIAL SHIFTING

294 3/10/2022 SUROJ 300/121 EXCAVATION WORK SHUTTERING MATERIAL SHIFTING


295 3/10/2022 SUROJ 300/122 EXCAVATION WORK EXCAVATION WORK
296 3/10/2022 SUROJ 1107/13 CONFINED SPACE PCC, SHUTTERING, FOOTING

SOIL LOADING, UNLOADING,


297 3/10/2022 SUROJ 1500 GENERAL WORK EXCAVATION

298 3/10/2022 SUROJ 300/127 EXCAVATION WORK EXCAVATION


299 3/10/2022 SUROJ 1355 GENERAL WORK PCC
300 3/10/2022 SUROJ 1107/14 CONFINED SPACE PCC
301 3/11/2022 SUROJ 1363 GENERAL WORK EXCAVATION WORK

302 3/11/2022 SUROJ 300/126 EXCAVATION WORK EXCAVATION WORK

303 3/11/2022 SUROJ 1361 GENERAL WORK SHUTTERING, DESHUTTERING, PCC

304 3/11/2022 SUROJ 300/125 EXCAVATION WORK FOOTING, SHUTTERING

305 3/11/2022 SUROJ 1107/19 CONFINED SPACE SCAFFOLDING DISMANTLING

306 3/11/2022 SUROJ 1358 GENERAL WORK EXCAVATION SOIL LOADING &
UNLOADING

307 3/11/2022 SUROJ 300/125 EXCAVATION WORK EXCAVATION SOIL LOADING &
UNLOADING
308 3/11/2022 SUROJ 1357 GENERAL WORK SOIL FILLING, LEVELLING

309 3/11/2022 SUROJ 300/124 EXCAVATION WORK SOIL FILLING, LEVELLING

310 3/11/2022 SUROJ 1360 GENERAL WORK BARRICATION, SOIL LEVELLING


311 3/11/2022 SUROJ 1107/20 CONFINED SPACE SHUTTERING
312 3/11/2022 SUROJ 1364 GENERAL WORK STEEL CUTTING & LIGHT FITTING

TOP SOIL REMOVING, SOIL LOADING


313 3/11/2022 SUROJ 1367 GENERAL WORK & UNLOADING

314 3/11/2022 SUROJ 300/128 EXCAVATION WORK TOP SOIL REMOVING,

315 3/11/2022 SUROJ 1369 GENERAL WORK PCC

EXCAVATION, LOADING,
316 3/12/2022 SUROJ 1371 GENERAL WORK UNLOADING, LEVELLING,
COMPACTION & WATER SPAYING

317 3/12/2022 SUROJ 300/131 EXCAVATION WORK EXCAVATION, LOADING, UNLOADING

STEEL REINFORCEMENT,
318 3/12/2022 SUROJ 1374 GENERAL WORK SHUTTERING, PCC

319 3/12/2022 SUROJ 1107/129 CONFINED SPACE EXCAVATION

320 3/12/2022 SUROJ 1376 GENERAL WORK SHUTTERING, STEEL FIXING

REINFORCEMENT, CURRING, SOIL


321 3/12/2022 SUROJ 1372 GENERAL WORK FILLING
322 3/12/2022 SUROJ 1107/127 CONFINED SPACE SHUTTERING, REINFORCEMENT

323 3/12/2022 SUROJ 1375 GENERAL WORK ROAD SOIL FILLING & LEVELLING

324 3/12/2022 SUROJ 300/131 EXCAVATION WORK EXCAVATION


325 3/12/2022 SUROJ 1377 GENERAL WORK GSB SPREADING, SOIL DRESSING
326 3/12/2022 SUROJ 300/130 EXCAVATION WORK EXCAVATION
SOIL DRESSING, PCC,
327 3/12/2022 SUROJ 1107/128 CONFINED SPACE REINFORCEMENT

328 3/12/2022 SUROJ 1378 GENERAL WORK LIGHT FITTING


329 3/12/2022 SUROJ 1373 GENERAL WORK EXCAVATION, PCC, RCC

330 3/12/2022 SUROJ 1380 GENERAL WORK SOIL LOADING & UNLOADING

331 3/12/2022 SUROJ 300/132 EXCAVATION WORK TOP SOIL REMOVING,

SCAFFOLDING, SHUTTERING WORK,


332 3/13/2022 SUROJ 1382 GENERAL WORK CURING WORK, MATERIAL SHIFTING

SOIL EXCAVATION LOADING &


333 3/14/2022 SUROJ 1383 GENERAL WORK
UNLOADING

SOIL LEVELLING, DRESSING,


334 3/14/2022 SUROJ 300/133 EXCAVATION WORK COMPACTION, LOADING &
UNLOADING

335 3/14/2022 SUROJ 1392 GENERAL WORK GSB LEVELLING, WMM


336 3/14/2022 SUROJ 1390 GENERAL WORK LIGHT INSTALLMENT & CUTTING

337 3/14/2022 SUROJ 1391 GENERAL WORK WEIGHTBRIDGE LIFTING & SHIFTING

338 3/14/2022 SUROJ 1384 GENERAL WORK REINFORCEMENT, PCC, RCC,


SCAFFOLDING

339 3/14/2022 SUROJ 1386 GENERAL WORK REINFORCEMENT, BOLT FIXING

SCAFFOLDING ERECTION, BOLT


340 3/14/2022 SUROJ 465 HEIGHT WORK FIXING
SOIL EXCAVATION, PCC, RCC,
341 3/14/2022 SUROJ 1385 GENERAL WORK
SCAFFOLDING
342 3/14/2022 SUROJ 300/134 EXCAVATION WORK EXCAVATION
PCC, RCC, SCAFFOLDING,
343 3/14/2022 SUROJ 1107/126 CONFINED SPACE
SHUTTERING, DESHUTTERING

344 3/14/2022 SUROJ 1388 GENERAL WORK SHUTTERING WORK, RCC, CONCRETE
WORK

345 3/14/2022 SUROJ 300/135 CONFINED SPACE CURING, BOLT FIXING

346 3/14/2022 SUROJ 1107/127 CONFINED SPACE TOP SOIL REMOVING

347 3/14/2022 SUROJ 300/137 EXCAVATION WORK EXCAVATION, SOIL REMOVING

LEVELLING, ROLLING, TOP LOADING


348 3/14/2022 SUROJ 1397 GENERAL WORK & UNLOADING

349 3/15/2022 SUROJ 300/137 EXCAVATION WORK SOIL EXCAVATION

350 3/15/2022 SUROJ 1398 GENERAL WORK SOIL DRESSING, LEVELLING & FILLING

PEDESTAL CASTING, SHUTTERING


351 3/15/2022 SUROJ 466 HEIGHT WORK
WORK

352 3/15/2022 SUROJ 1107/128 CONFINED SPACE REINFORCEMENT, SOIL


DRESSING,LEVELLING
REINFORCEMENT SHUTTERING,
353 3/15/2022 SUROJ 13 GENERAL WORK DESHUTTERING

354 3/15/2022 SUROJ 300/140 EXCAVATION WORK SOIL DRESSING, SOIL LEVELLING

SOIL DRESSING, CONCRETE,


355 3/15/2022 SUROJ 14 GENERAL WORK DESHUTTERING

356 3/15/2022 SUROJ 1107/129 CONFINED SPACE SHUTTERING, CONCRETE CASTING

357 3/15/2022 SUROJ 18 GENERAL WORK STEEL CUTTING & LIGHT FITTING

WMM, SOIL LEVELLING, FILLING,


358 3/15/2022 SUROJ 17 GENERAL WORK SOIL LEVELLING

359 3/15/2022 SUROJ 15 GENERAL WORK SHUTTERING, CONCRETE, PCC

360 3/15/2022 SUROJ 12 GENERAL WORK SHUTTERING, CONCRETE, PCC

EXCAVATION, LOADING,
361 3/15/2022 SUROJ 21 GENERAL WORK UNLOADING, GRADING &
COMPACTION
EXCAVATION, LOADING,
362 3/15/2022 SUROJ 300/38 EXCAVATION WORK UNLOADING, GRADING &
COMPACTION
363 3/15/2022 SUROJ 22 GENERAL WORK PCC, CONCRETE WORK

SOIL LOADING & UNLOADING, TOP


364 3/16/2022 SUROJ 300/140 EXCAVATION WORK SOIL REMOVING

SOIL LOADING & UNLOADING, SOIL


365 3/16/2022 SUROJ 24 GENERAL WORK DRESSING

366 3/16/2022 SUROJ 23 GENERAL WORK SOIL FILLING, LEVELLING,


COMPACTION WORK

367 3/16/2022 SUROJ 27 GENERAL WORK TREE CUTTING, SOIL LEVELLIG, PCC,
WMM
REINFORCEMENT, PCC, RCC,
368 3/16/2022 SUROJ 25 GENERAL WORK SHUTTERING
REINFORCEMENT, PCC, RCC,
369 3/16/2022 SUROJ 1107/132 CONFINED SPACE
SHUTTERING
370 3/16/2022 SUROJ 467 HEIGHT WORK PCC, RCC, REINFORCEMENT
SOIL DRESSING, RCC, PCC,
371 3/16/2022 SUROJ 31 GENERAL WORK SHUTTRING, DESHUTTERING

PCC, RCC, REINFORCEMENT, SOIL


372 3/16/2022 SUROJ 29 GENERAL WORK DRESSING

PCC, RCC, REINFORCEMENT, SOIL


373 3/16/2022 SUROJ 26 GENERAL WORK DRESSING, BARRICATION

374 3/16/2022 SUROJ 300/144 EXCAVATION WORK EXCAVATION WORK

375 3/16/2022 SUROJ 300/131 CONFINED SPACE RCC, REINFORCEMENT, SOIL


DRESSING
STEEL CUTTING, PLY CUTTING, LIGHT
376 3/16/2022 SUROJ 28 GENERAL WORK FITTING
377 3/16/2022 SUROJ 32 GENERAL WORK PCC, RCC
SOIL LOADING, EXCAVATION,
378 3/16/2022 SUROJ 34 GENERAL WORK COMPACTION, ROLLING , GRADING
& SPREADING

379 3/16/2022 SUROJ 300/142 EXCAVATION WORK FUTURE STACK PARKING YARD,
NORTH SIDE COMPOUND WALL

SOIL LOADING & UNLOADING &


380 3/17/2022 SUROJ 39 GENERAL WORK UNLOADING
TOP SOIL REMOVING, COMPACTION,
381 3/17/2022 SUROJ 300/143 EXCAVATION WORK SOIL DRESSING

SOIL FILLING LEVELLING, LOADING


382 3/17/2022 SUROJ 40 GENERAL WORK UNLOADING, COMPACTION,
SUBGRID SOOIL

383 3/17/2022 SUROJ 300/144 EXCAVATION WORK TOP SOIL REMOVING

TOP SOIL REMOVING, FOOTING


384 3/17/2022 SUROJ 300/145 EXCAVATION WORK
EXCAVATION

385 3/17/2022 SUROJ 1107/137 CONFINED SPACE PCC, RCC, SHUTTERING

PCC, RCC, SHUTTERING , LOADING &


386 3/17/2022 SUROJ 43 GENERAL WORK UNLOADING
REINFORCEMENT SHUTTERING
387 3/17/2022 SUROJ 468 HEIGHT WORK DESHUTTERING, PCC,RCC, SOIL
DRESSING

388 3/17/2022 SUROJ 41 GENERAL WORK SHUTTERING, PCC, RCC

TREE SHIFTING, WMM LEVELLING,


389 3/17/2022 SUROJ 42 GENERAL WORK
LOADING UNLOADING

REINFORCEMENT SHUTTERING
390 3/17/2022 SUROJ 45 GENERAL WORK
DESHUTTERING, PCC,RCC

391 3/17/2022 SUROJ 1107/138 CONFINED SPACE FOOTING EXCAVATION

392 3/17/2022 SUROJ 46 GENERAL WORK CUTTING, GRINDING, WELDING

393 3/17/2022 SUROJ 1713 HOT WORK CUTTING, GRINDING, WELDING

394 3/17/2022 SUROJ 47 GENERAL WORK STEEL CUTTING, PLY CUTTING, LIGHT
FITTING
REINFORCEMENT SHUTTERING
395 3/17/2022 SUROJ 48 GENERAL WORK DESHUTTERING, PCC,RCC, SOIL
DRESSING
396 3/17/2022 SUROJ 300/147 EXCAVATION WORK FOOTING EXCAVATION

397 3/17/2022 SUROJ 49 GENERAL WORK SOIL LOADING, SOIL REMOVING


UNLOADING, LOADING WORK

398 3/17/2022 SUROJ 300/148 EXCAVATION WORK SOIL LOADING, UNLOADING, SOIL
REMOVING

ROAD EXCAVATION, SOIL LOADING,


UNLOADING, LEVELLING,
399 3/18/2022 SUROJ 52 GENERAL WORK COMPACTION WITH ROLLER, LAND
SURVEY, TREE CUTTING, TOP SOIL
REMOVING, WATER SPRINKLING

SHUTTERING, DESHUTTERING,
REINFORCEMENT, SOIL DRESSING,
400 3/18/2022 SUROJ 54 GENERAL WORK BACKFILLING, GREETING,
ANCHORBOLT, PCC, RCC, HARD
BARRICATION

REINFORCEMENT, SHUTTERING, SOIL


401 3/18/2022 SUROJ 51 GENERAL WORK LEVELLING, GSB LEVELLING,
COMPACTION, CONCRETE WORK,
INSERT PLATE FIXING

PCC, SOIL DRESSING, RCC, GSB


SPRADING, ROLLING, LEVELLING,
402 3/18/2022 SUROJ 1107/141 CONFINED SPACE LAND SURVEY, SHUTTERING, FILLING
WORK

COMPACTION, WATER SPREADING,


403 3/18/2022 SUROJ 59 GENERAL WORK REINFORCEMENT, SHUTTERING,
LEVELLING, FILLING, ROLLING
SOIL DRESSING, CONCRETE, PCC,
GSB SPREADING, REINFORCEMENT,
404 3/18/2022 SUROJ 57 GENERAL WORK LAND SURVY, FILLING, LEVELLING,
RAFT CONCRETE, SHUTTERING

SOIL EXCAVATION, SOIL LOADING


405 3/18/2022 SUROJ 300/149 EXCAVATION WORK UNLOADING, TREE CUTTING, WATER
SPREADING, MARKING

SOIL EXCAVATION, SOIL LOADING


406 3/18/2022 SUROJ 55 GENERAL WORK UNLOADING, TREE CUTTING, WATER
SPREADING, MARKING

STEEL CUTTING, BENDING, PLY


407 3/18/2022 SUROJ 56 GENERAL WORK
BOARD MAKING & LIGHT FITTING
SCAFFOLDING, DESHUTTERING,
408 3/18/2022 SUROJ 469 HEIGHT WORK
SHUTTERING, BOLT GRASING,
SHUTTERING, RCC, PCC,
409 3/18/2022 SUROJ 101 CONFINED SPACE DESHUTTERING, SOIL DRESSING,
BOLT GREASING

SOIL EXCAVATION, LOADIG,


410 3/19/2022 SUROJ 60 GENERAL WORK UNLOADING, COMPACTION WITH
ROLLER, SOIL LEVELLING

411 3/19/2022 SUROJ 4 EXCAVATION WORK SOIL EXCAVATION

LIGHT FITTING, CABLE POLE FIXING,


412 3/19/2022 SUROJ 67 GENERAL WORK
STEEL CUTTING BENDING

413 3/19/2022 SUROJ 545 HEIGHT WORK CONCRETE, SHUTTERING,


SCAFFOLDING
CONCRETE, SHUTTERING,
414 3/19/2022 SUROJ 107 CONFINED SPACE
SCAFFOLDING
SHUTTRING, REINFORCEMENT,
415 3/19/2022 SUROJ 64 GENERAL WORK SCAFFOLDING, CONCRETE
REINFORCEMENT, SCAFFOLDING,
416 3/19/2022 SUROJ 104 CONFINED SPACE
CONCRETE

417 3/19/2022 SUROJ 106 CONFINED SPACE GSB SPREADING, PCC, CONCRETE

REINFORCEMENT, SHUTTERING,
418 3/19/2022 SUROJ 61 GENERAL WORK CONCRETE, DESHUTERING, GSB
LVELLING, COMPACTION

CONCRETE, SHUTTERING,
419 3/19/2022 SUROJ 63 GENERAL WORK
REINFORCEMENT, SCAFFOLDING

BACKFILLING, TREE CUTTING, TOP


420 3/19/2022 SUROJ 68 GENERAL WORK SOIL REMOVING, SCAFFOLDING

TOP SOIL REMOVING/EXCAVATION,


421 3/19/2022 SUROJ 70 GENERAL WORK SOIL UNLOADING, LOADING WORK

TOP SOIL REMOVING/EXCAVATION,


422 3/19/2022 SUROJ 6 EXCAVATION WORK SOIL UNLOADING, LOADING WORK

423 3/19/2022 SUROJ 65 GENERAL WORK PCC, CONCRETE, FOUNDATION AREA

EXCAVATION WORK, TOP SOIL


REMOVING, SUBGRADE
424 3/21/2022 SUROJ 72 GENERAL WORK
PREPARATION, LEVELLING & WATER
SPRAYING, COMPACTION

CONCRETE, SHUTTERING,
425 3/21/2022 SUROJ 75 GENERAL WORK REINFORCEMENT, SCAFFOLDING,
BACKFIILLING
CONCRETE, SHUTTERING,
426 3/21/2022 SUROJ 109 CONFINED SPACE REINFORCEMENT, SCAFFOLDING,
BACKFIILLING

427 3/21/2022 SUROJ 547 HEIGHT WORK


CONCRETE, SHUTTERING,
SCAFFOLDING,
CONCRETE, SHUTTERING,
428 3/21/2022 SUROJ 112 CONFINED SPACE REINFORCEMENT, SCAFFOLDING,
BACKFILLING, SOIL
429 3/21/2022 SUROJ 78 GENERAL WORK LEVELLING,CONCRETE, SHUTTERING,
REINFORCEMENT
SUBGRADE PREPERATION,
430 3/21/2022 SUROJ 73 GENERAL WORK WATERING, SOIL LEVELLING,
COMPACTION,EXCAVATION
ROAD EXCAVATION, SOIL LOADING,
431 3/21/2022 SUROJ 7 EXCAVATION WORK
UNLOADING

REINFORCEMENT, SHTTERING,
432 3/21/2022 SUROJ 74 GENERAL WORK CONCRETE, INSERT PLATE FIXING,
ANCHOR BOLT FIXING, SCAFFOLDING

LIGHT FIXING & STEEL CUTTING,


433 3/21/2022 SUROJ 201 GENERAL WORK BENDING, SHUTTERING MAKING

TOP SOIL REMOVING/EXCAVATION,


434 3/21/2022 SUROJ 80 GENERAL WORK
SOIL UNLOADING, LOADING WORK

435 3/21/2022 SUROJ 11 EXCAVATION WORK TOP SOIL REMOVING/EXCAVATION,


SOIL UNLOADING, LOADING WORK

436 3/21/2022 SUROJ 79 GENERAL WORK CONCRETE WORK, RCC


437 3/21/2022 SUROJ 471 Height Work CONCRETE WORK, RCC
438 3/21/2022 SUROJ 113 CONFINED SPACE CONCRETE WORK, RCC
STEEL CUTTING, BENDING, PLY
439 3/22/2022 SUROJ 86 GENERAL WORK BOARD MAKING & LIGHT FITTING

INSERT PLATE ERECTION & CORNER


440 3/22/2022 SUROJ 87 GENERAL WORK
ANGLE FIXING, MATERIAL SHIFTING

INSERT PLATE ERECTION & CORNER


441 3/22/2022 SUROJ 1714 HEIGHT WORK
ANGLE FIXING, MATERIAL SHIFTING
REINFORECEMENT,
442 3/22/2022 SUROJ 77 GENERAL WORK SHUTTERING,CONCRETE WORK,
ANGLE BOLT FIXING, DESHUTTERING

SCAFFOLDING & ANCHOR BOLT


443 3/22/2022 SUROJ 472 HEIGHT WORK
FIXING, CONCRETE WORK
REINFORCEMENT, SHUTTERING,
444 3/22/2022 SUROJ 115 CONFINED SPACE CONCRETE WORK, SOIL DRESSING,
ANCHOR BOLT FIXING

REINFORCEMENT,
SHUTTERING,BARRICATION,
445 3/22/2022 SUROJ 84 GENERAL WORK
CONCRETE WORK, SOIL DRESSING,
EXCAVATION FOR FOOTING

ANCHOR BOLT FIXING, CONCRETE


446 3/22/2022 SUROJ 543 HEIGHT WORK
WORK, SHUTTERING WORK

447 3/22/2022 SUROJ 13 EXCAVATION WORK EXCAVATION OF FOOTING

SUBGRADE PREPERATION,
WATERING, SOIL LEVELLING,
448 3/22/2022 SUROJ 85 GENERAL WORK COMPACTION, ROAD CRACK
RECTIFICATION WORK

EXCAVATION WORK, SOIL LOADING


449 3/22/2022 SUROJ 14 EXCAVATION WORK & UNLOADING

SHUTTERING, CONCRETE WORK,


450 3/22/2022 SUROJ 83 GENERAL WORK REINFORCEMENT, SCAFFOLDING,
BACKFILLING

SHUTTERING WORK,
451 3/22/2022 SUROJ 116 CONFINED SPACE REINFORCEMENT WORK,
SCAFFOLDING WORK, CONCRETE
WORK, BACK FILLING WORK

SHUTTERING, SCAFFOLDING,
452 3/22/2022 SUROJ 473 HEIGHT WORK CONCRETE WORK, REINFORCEMENT
WORK

453 3/22/2022 SUROJ GENERAL WORK SOIL LEVELLING WITH GRADER IN


EXSISTING PUPM ROOM
454 3/22/2022 SUROJ 81 GENERAL WORK OFFICE AREA EXCAVATION & SOIL
LOADING & UNLOADING

455 3/22/2022 SUROJ 12 EXCAVATION WORK EXCAVATION WORK

SOIL EXCAVATION, LOADING,


456 3/22/2022 SUROJ 88 GENERAL WORK UNLOADING

SOIL EXCAVATION, LOADING,


457 3/22/2022 SUROJ 15 EXCAVATION WORK
UNLOADING

458 3/22/2022 SUROJ 90 GENERAL WORK CONCRETE WORK, SOIL DRESSING

459 3/22/2022 SUROJ 89 GENERAL WORK UNLOADING STORE MATERIAL

PMC OFFICE AREA EXCAVTION,


460 3/23/2022 SUROJ 16 EXCAVATION WORK PARKING AREA EXCAVATION

PMC OFFICE AREA EXCAVTION, SOIL


461 3/23/2022 SUROJ 204 GENERAL WORK LOADING & UNLOADING TO
PROJECT AREA,PARKING AREA
EXCAVTION, KURB STONE FIXING

462 3/23/2022 SUROJ 203 GENERAL WORK SOIL UNLOADING WORK

REINFORCEMENT SHUTTERING,
463 3/23/2022 SUROJ 91 GENERAL WORK ANGLE BOLT FIXING, SCAFFOLDING,
CONCRETE

ANGLE BOLT FIXING, SCAFFOLDING,


464 3/23/2022 SUROJ 474 HEIGHT WORK
CONCRETE

465 3/23/2022 SUROJ 97 GENERAL WORK STEEL CUTTING, LIGHT FITTING

SHUTTERING WORK, SCAFFOLDING


466 3/23/2022 SUROJ 475 HEIGHT WORK
WORK, CONCRETE
SHUTTERING WORK, CONCRETE
467 3/23/2022 SUROJ 93 GENERAL WORK WORK, SCAFFOLDING,
REINFORCEMENT & BACKFILLING
SHUTTERING WORK, CONCRETE
468 3/23/2022 SUROJ 118 CONFINED SPACE WORK, SCAFFOLDING,
REINFORCEMENT & BACKFILLING
MATERIAL SHIFTING, INSERT PLATE
469 3/23/2022 SUROJ 95 GENERAL WORK ERECTION, COVER EDGE ANGLE
ERECTION

470 3/23/2022 SUROJ 1715 HOT WORK WELDING & GRINDING

471 3/23/2022 SUROJ 94 GENERAL WORK SHUTTERING, REINFORCEMENT,


CONCRETE WORK, SCAFFOLDING

REINORCEMENT, SHUTTERING,
472 3/23/2022 SUROJ 119 CONFINED SPACE CONCRETE, SCAFFOLDING

473 3/23/2022 SUROJ 476 HEIGHT WORK SCAFFOLDING SHUTTERING

SUBGRSDE PREPERATION, SOIL


474 3/23/2022 SUROJ 96 GENERAL WORK
LOADING, TOP SOIL REMOVING

DEBRIS REMOVING, SOIL


475 3/23/2022 SUROJ 17 EXCAVATION WORK EXCAVATION

EXCAVATIO SOIL LOADING &


476 3/24/2022 SUROJ 207 GENERAL WORK UNLOADING KURBSTONE FIXING,
SUBGRADE PREPERATION GSB
FILLING & ROLLING LEVELING

477 3/24/2022 SUROJ 19 EXCAVATION WORK EXCAVTION WORK SOIL LOADING &
UNLOADING
WELDING & GRINDING, INSERT
PLATE & EDGE ANGLE FIXING, ANGLE
478 3/24/2022 SUROJ 1716 HOT WORK
BOLT FIXING, CONCRTE ,
SCAFFOLDING

WELDING & GRINDING, INSERT


PLATE & EDGE ANGLE FIXING, ANGLE
479 3/24/2022 SUROJ 210 GENERAL WORK BOLT FIXING, CONCRTE ,
SCAFFOLDING

WELDING & GRINDING, INSERT


PLATE & EDGE ANGLE FIXING, ANGLE
480 3/24/2022 SUROJ 478 HEIGHT WORK
BOLT FIXING, CONCRTE ,
SCAFFOLDING

REINFORCEMENT, SHUTTERING,
481 3/24/2022 SUROJ 213 GENERAL WORK CONCRETE WORK, ANGLE BOLT
FIXING, SCAFFOLDING

482 3/24/2022 SUROJ 214 GENERAL WORK LIGHT FITTING, STEEL CUTTING

SUBRID PREPERATION,WATERING,
SOIL LEVELLING, COMPACTION OF
483 3/24/2022 SUROJ 209 GENERAL WORK ROAD, LOADING, UNLOADING, TOP
SOIL REMOVING

SOIL EXCAVATION, DEBRIS


484 3/24/2022 SUROJ 20 EXCAVATION WORK REMOVING, SOIL REMOVING

SHUTTRING, REINFORCEMENT, SOIL


485 3/24/2022 SUROJ 212 GENERAL WORK BACKFILLING, CONCRETE

SHUTTRING, SCAFFOLDING,
486 3/24/2022 SUROJ 477 HEIGHT WORK REINFORCEMENT, CONCRETE, STEEL
CUTTING

SHUTTRING, SCAFFOLDING,
487 3/24/2022 SUROJ 211 GENERAL WORK REINFORCEMENT, CONCRETE, STEEL
CUTTING, SOIL EXCAVATION,
GRINDING WORK
SHUTTRING, SCAFFOLDING,
488 3/24/2022 SUROJ 122 CONFINED SPACE REINFORCEMENT,BACKFILLING
489 3/24/2022 SUROJ 21 EXCAVATION WORK SOIL BACKFILLING

490 3/24/2022 SUROJ 121 CONFINED SPACE SHUTTRING,


REINFORCEMENT,CONCRETE

SOIL EXCAVATION, LOADING,


491 3/24/2022 SUROJ 216 GENERAL WORK
UNLOADING

492 3/24/2022 SUROJ 22 EXCAVATION WORK SOIL EXCAVATTION

REINFORCEMENT FIXING &


493 3/24/2022 SUROJ 208 GENERAL WORK
SHUTTERING

494 3/25/2022 SUROJ 23 EXCAVATION WORK EXCAVATION WORK

EXCAVATION, SOIL LOADING


UNLOADING, KURBSTONE FIXING,
495 3/25/2022 SUROJ 217 GENERAL WORK PMC OFFICE AREA ROAD, GSB
LEVELLING FILLING, COMPACTION,
TREE CUTTING & SHIFTING

496 3/25/2022 SUROJ 218 GENERAL WORK ROAD AREA SOIL LOADING WORK,
SUBGRADE PREPERATION

497 3/25/2022 SUROJ 222 GENERAL WORK INSERT PLATE ERECTION & CORNER
ANGLE FIXING

498 3/25/2022 SUROJ 1718 HOT WORK WELDING & GRINDING

499 3/25/2022 SUROJ 223 GENERAL WORK STEEL CUTTING, LIGHT FIXING

500 3/25/2022 SUROJ 479 HEIGHT WORK


ANCHOR BOLT FIXING, CONCRETE
WORK

REINFORCEMENT, SHUTTERING,
501 3/25/2022 SUROJ 219 GENERAL WORK ANCHOR BOLT FIXING, CONCRETE,
SOIL LEVELLING

502 3/25/2022 SUROJ 124 CONFINED SPACE CONCRETE, SHUTTERING,


REINFORCEMENT
CONCRETE, SHUTTERING,
503 3/25/2022 SUROJ 225 GENERAL WORK
REINFORCEMENT

504 3/25/2022 SUROJ 24 EXCAVATION WORK SOIL EXCAVATION, SOIL LOADING &
UNLOADING

SUBGRADE PREPERATION, ROAD


505 3/25/2022 SUROJ 221 GENERAL WORK
WORK

506 3/25/2022 SUROJ 224 GENERAL WORK BACKFILLING, CURING,


BARRICATION, MATERIAL SHIFTING

SOIL EXCAVATION, LOADING,


507 3/25/2022 SUROJ 228 GENERAL WORK
UNLOADING, KURB STONE FIXING

508 3/25/2022 SUROJ 27 EXCAVATION WORK SOIL EXCAVATTION

509 3/25/2022 SUROJ 230 GENERAL WORK DG SERVISING


510 3/25/2022 SUROJ 231 GENERAL WORK CONCRETE WORK, GRADE SLAB
511 3/25/2022 SUROJ 26 EXCAVATION WORK EXCAVATION OF FOOTING
SHUTTERING, REINFORCEMENT,
512 3/25/2022 SUROJ 229 GENERAL WORK CONCRETE, SCAFFOLDING, SOIL
BACKFILLING, COMPACTION

SHUTTERING, CONCRETE, SCAFFOLD,


513 3/25/2022 SUROJ 126 CONFINED SPACE REINFORCEMENT, BACKFILLING,

SHUTTERING, REINFORCEMENT,
514 3/25/2022 SUROJ 480 HEIGHT WORK CONCRETE, SCAFFOLDING,

EXCAVATION WORK, TEMOPRARY


515 3/26/2022 SUROJ 28 EXCAVATION WORK
ROAD

EXCAVATION SOIL LOADING &


516 3/26/2022 SUROJ 233 GENERAL WORK UNLOADING, KURBSTONE FIXING,
SUBGRADE PREPERATION, PCC,
SHUTTERING

PIPE RACK WEST SIDE ROAD ROUND


POSITION, SOIL SHIFTING, PUMP
517 3/26/2022 SUROJ 234 GENERAL WORK
HOUSE WEST SIDE ROAD SOIL
LEVELLING, CURING WORK
STEEL CUTTING, BENDING & LIGHT
518 3/26/2022 SUROJ 238 GENERAL WORK FITTING

REINFORCEMENT, SHUTTERING,
519 3/26/2022 SUROJ 239 GENERAL WORK CONCRETE, SOIL FILLING,
SCAFFOLDING, PLATFORM

520 3/26/2022 SUROJ 130 CONFINED SPACE REINFORCEMENT,MARKING,

ANGLE BOLT FIXING, SCAFFOLDING,


521 3/26/2022 SUROJ 484 HEIGHT WORK
CONCRETE

REINFORCEMENT, SHUTTERING,
522 3/26/2022 SUROJ 127 CONFINED SPACE
CONCRETE, ANCHOR BOLT FIXING

SHUTTERING, CONCRETE,
523 3/26/2022 SUROJ 235 GENERAL WORK REINFORCEMENT,NGLE BOLT FIXING,
SCAFFOLDING,

ANGLE BOLT FIXING, SCAFFOLDING,


524 3/26/2022 SUROJ 481 HEIGHT WORK
CONCRETE, SHUTTERING

525 3/26/2022 SUROJ 30 EXCAVATION WORK EXCAVATION WORK


REINFORCEMENT, SHUTTERING,
526 3/26/2022 SUROJ 482 HEIGHT WORK
CONCRETE, SCAFFOLDING
REINFORCEMENT, SHUTTERING,
527 3/26/2022 SUROJ 236 GENERAL WORK CONCRETE, SCAFFOLDING,
BACKFILLING

528 3/26/2022 SUROJ 128 CONFINED SPACE REINFORCEMENT, SHUTTERING,


CONCRETE,

SUBGRADE PREPERATION, SOIL


LEVELLING, SOIL LOADING,
529 3/26/2022 SUROJ 240 GENERAL WORK UNLOADING, DEBRIS REMOVING,
WATERING, COMACTION

SOIL EXACAVATION, SOIL LOADING,


530 3/26/2022 SUROJ 29 EXCAVATION WORK UNLOADING, DEBRIS REMOVING

SOIL EXCAVATION, LOADING,


531 3/26/2022 SUROJ 244 GENERAL WORK
UNLOADING
532 3/26/2022 SUROJ 31 EXCAVATION WORK EXCAVATTION

533 3/26/2022 SUROJ 132 CONFINED SPACE ANCHOR BOLT FIXING &
SHUTTERING
ANCHOR BOLT FIXING &
534 3/26/2022 SUROJ 243 GENERAL WORK SHUTTERING
535 3/26/2022 SUROJ 100 GENERAL WORK SHUTTERING FOR FOOTING
536 3/26/2022 SUROJ 133 CONFINED SPACE SHUTTERING

SOIL EXCAVATION, LOADING,


537 3/26/2022 SUROJ 502 GENERAL WORK UNLOADING

538 3/26/2022 SUROJ 42 EXCAVATION WORK SOIL EXCAVATION

539 3/27/2022 SUROJ 245 GENERAL WORK SHUTTERING, CONCRETE,


REINFORCEMENT

540 3/27/2022 SUROJ 227 GENERAL WORK INSERT PLATE & ANGLE ERECTION

541 3/27/2022 SUROJ 719 HEIGHT WORK WELDING & GRINDING

SHUTTERING, REINFORCEMENT,
542 3/28/2022 SUROJ 248 GENERAL WORK CONCRETE, SCAFFOLDING, SOIL
EXCAVATION, BACK
543 3/28/2022 SUROJ 34 EXCAVATION WORK SOIL EXCVATION, BACKFILLING
SHUTTERING, REINFORCEMENT,
544 3/28/2022 SUROJ 136 CONFINED SPACE CONCRETE, SCAFFOLDING,
BACKFILLING

545 3/28/2022 SUROJ 486 HEIGHT WORK


SHUTTERING, REINFORCEMENT,
SCAFFOLDING, BACKFILLING
SHUTTERING, REINFORCEMENT,
546 3/28/2022 SUROJ 250 GENERAL WORK CONCRETE, SCAFFOLDING,
BACKFILLING, CURRING
SHUTTERING, REINFORCEMENT,
547 3/28/2022 SUROJ 135 CONFINED SPACE SCAFFOLDING, BACKFILLING
SOIL EXCAVATION, DEBRIS
548 3/28/2022 SUROJ 33 EXCAVATION WORK REMOVING, SOIL LEVELING,TOP SOIL
REMOVING

SUBGRADE PREPERATION, ROAD


WATERING, LEVELLING, ROLLING,
549 3/28/2022 SUROJ 246 GENERAL WORK
TOP SOIL REMOVING, SOIL FILLING, ,
LEVEELING, LOADING & UNLOADING

550 3/28/2022 SUROJ 242 GENERAL WORK SHUTTERING, REINFORCEMENT,


SCAFFOLDING, BACKFILLING

551 3/28/2022 SUROJ 247 GENERAL WORK STEEL CUTTING, BENDING, LIGHT
FITTIN & MAKING YARD

552 3/29/2022 SUROJ 299/5 GENERAL WORK KURBSTONE FIXING, PCC, SUBGRADE
PREPARATION, TREE SHIFTING

553 3/29/2022 SUROJ 299 GENERAL WORK BAR CUTTING & BENDING, LIGHT
FIXING

ROAD EXCAVATION, TOP SOIL


554 3/29/2022 SUROJ 35 EXCAVATION WORK
REMOVING
ROAD AREA, SOIL LEVELLING, GSB
555 3/29/2022 SUROJ 299/11 GENERAL WORK LOADING & UNLOADING, TOP SOIL
REMOVING

SOIL EXCAVATION, DEBRIS


556 3/29/2022 SUROJ 39 EXCAVATION WORK REMOVING, SOIL LOADING &
UNLOADING
SUBGRADE PREPERATION, TOP SOIL
557 3/29/2022 SUROJ 299/10 GENERAL WORK REMOVING, SOIL FILLING &
LEVELLING,

REINFORCEMENT, SHUTTRING,
558 3/29/2022 SUROJ 299/02 GENERAL WORK CONCRETE WORK

559 3/29/2022 SUROJ 299/01 GENERAL WORK REINFORCEMENT, SHUTTRING,SOIL


FILLING & LEVELLING

REINFORCEMENT,
560 3/29/2022 SUROJ 4 CONFINED SPACE
SHUTTRING,ANCHOR BOLT FIXING

REINFORCEMENT, SHUTTRING, SOIL


561 3/29/2022 SUROJ 299/07 GENERAL WORK FILLING & LEVELLING, CONCRETE,
ANCHOR BOLT FIXING, EXCAVATION

REINFORCEMENT, SHUTTRING, SOIL


562 3/29/2022 SUROJ 5 CONFINED SPACE FILLING & LEVELLING, CONCRETE,
ANCHOR BOLT FIXING, EXCAVATION

CONCRETE, SHUTTERING,
563 3/29/2022 SUROJ 299/03 GENERAL WORK SCAFFOLDING, REINFORCEMENT,
BACKFILLING, EXCAVATION
564 3/29/2022 SUROJ 36 EXCAVATION WORK SOIL EXCAVATION, BACK FILLING
CONCRETE WORK, REINFORCEMENT,
565 3/29/2022 SUROJ 488 HEIGHT WORK
SHUTTERING

566 3/29/2022 SUROJ 3 CONFINED SPACE REINFORCEMENT, SHUTTRING,


CONCRETE, SCAFFOLDING

CONCRETE, EXCAVTION, MATERIAL


567 3/29/2022 SUROJ 299/8 GENERAL WORK SHIFTING, BARRICATION

EXCAVATION, SOIL LOADING &


568 3/29/2022 SUROJ 37 EXCAVATION WORK UNLOADING,
INSERT PLATE EDGE ANGLE
569 3/29/2022 SUROJ 32 GENERAL WORK ERECTION, MATERIAL SHIFTING
MANUALLY
WELDING, GRINDING,ANGLE &
570 3/29/2022 SUROJ 1722 HOT WORK
INSERT PLATE FIXING
EXCAVATION, TOP SOIL REMOVING,
571 3/29/2022 SUROJ 38 EXCAVATION WORK LOADING & UYNLOADING

572 3/29/2022 SUROJ 299/04 GENERAL WORK SOIL LOADING & UNLOADING, TREE
SHIFTING, EXCAVATION

573 3/29/2022 SUROJ 299/09 GENERAL WORK EXCAVATION, TOP SOIL REMOVING,
LOADING & UYNLOADING

SUBGRADE PREPARATION,
574 3/30/2022 SUROJ 503 GENERAL WORK COMPACTION OF ROAD, SOIL
LOADING & UNLOADING, TOP SOIL
REMOVING, SOIL LEVELLING

DEBRIS REMOVING, SOIL


575 3/30/2022 SUROJ 43 EXCAVATION WORK EXCAVATION, SOIL LOADING &
UNLOADING

ROAD EXCAVATION, TOP SOIL


576 3/30/2022 SUROJ 44 EXCAVATION WORK REMOVING
SOIL LEVELLING, SOIL LOADING &
577 3/30/2022 SUROJ 507 GENERAL WORK UNLOADING EXCAVATION

SUBGRADE PREPARATION,
578 3/30/2022 SUROJ 505 GENERAL WORK COMPACTION OF ROAD,SOIL
LEVELLING, TOP SOIL REMOVING

PCC, KURBSTONE FIXING, SUBGRADE


579 3/30/2022 SUROJ 515 GENERAL WORK FIXING

580 3/30/2022 SUROJ 516 GENERAL WORK RCC, HUME PIPE LIFTING &
UNLOADING
STEEL CUTTING, BAR BENDING, PLY
581 3/30/2022 SUROJ 511 GENERAL WORK WOOD CUTTING
582 3/30/2022 SUROJ 138 CONFINED SPACE CHIMENY SHUTTRING
583 3/30/2022 SUROJ 509 GENERAL WORK CONCRETE, REINFORCEMENT,
ROLLING, SHUTTERING

584 3/30/2022 SUROJ 513 GENERAL WORK INSERT PLATE ERECTION

585 3/30/2022 SUROJ 1724 HOT WORK WELDING & GRINDING

SOIL DRESSING, LEVELLING, SOIL


586 3/30/2022 SUROJ 504 GENERAL WORK
LOADING & UNLOADING

587 3/30/2022 SUROJ 508 GENERAL WORK EXCAVATIN FOOTING CONCRETE

588 3/30/2022 SUROJ 46 EXCAVATION WORK EXCAVATION FOR FOUNDATION

SHUTTERING, SCAFFOLDING,
589 3/30/2022 SUROJ 137 CONFINED SPACE CONCRETE WORK, REINFORCEMENT
WORK
SHUTTERING, SCAFFOLDING,
590 3/30/2022 SUROJ 490 HEIGHT WORK CONCRETE WORK, REINFORCEMENT
WORK

591 3/30/2022 SUROJ 45 EXCAVATION WORK SOIL MEXCAVATION & BACKFILLING

SHUTTERING, SCAFFOLDING,
592 3/30/2022 SUROJ 512 GENERAL WORK CONCRETE WORK, EXCAVATION,
REINFORCEMENT WORK,
COMPACTION, BACKFILLING

593 3/30/2022 SUROJ 506 GENERAL WORK SHUTTERING,CONCRETE,SCAFFOLDI


NG, MANUALY MATERIAL SHIFTING

594 3/30/2022 SUROJ 491 HEIGHT WORK


SHUTTERING,CONCRETE,SCAFFOLDI
NG

595 3/30/2022 SUROJ 7 CONFINED SPACE CONCRETE, SHUTTERING,


REINFORCEMENT, SCAFFOLDING

CONCRETE, SOIL LEVELLING,


596 3/30/2022 SUROJ 510 GENERAL WORK COMPACTION, SHUTTERING,
REINFORCEMENT
RCC, HUME PIPE LIFTING &
597 3/30/2022 SUROJ 520 GENERAL WORK UNLOADING

SOIL EXCAVATION, DEBRIS


598 3/30/2022 SUROJ 518 GENERAL WORK REMOVING, SOIL LOADING,
UNLOADING

599 3/30/2022 SUROJ 48 EXCAVATION WORK SOIL EXCAVATION

TREE SHIFTING, SOIL LEVELLING, SOIL


600 3/31/2022 SUROJ 521 GENERAL WORK LOADING, UNLOADING

SOIL EXCAVATION,SOIL LOADING,


601 3/31/2022 SUROJ 49 EXCAVATION WORK
UNLOADING

602 3/31/2022 SUROJ 531 GENERAL WORK STEEL CUTTING, PLYWOOD CUTTING

603 3/31/2022 SUROJ 530 GENERAL WORK PCC, KURB STONE FIXING

SOIL LEVELLING, SOIL LOADING &


604 3/31/2022 SUROJ 528 GENERAL WORK
UNLOADING

CONCRETE, REINFORCEMENT,
605 3/31/2022 SUROJ 522 GENERAL WORK
SHUTTERING, CURING

606 3/31/2022 SUROJ 523 GENERAL WORK REINFORCEMENT, SHUTTERING,

EXCAVATION, SOIL LEVELLING


607 3/31/2022 SUROJ 50 EXCAVATION WORK
ROLLING

EXCAVATION, SOIL COMPACTION,


608 3/31/2022 SUROJ 527 GENERAL WORK
SHUTTERING, CONCRETE
609 3/31/2022 SUROJ 526 GENERAL WORK INSERT PLATE ERECTION & FIXING

610 3/31/2022 SUROJ 1725 HOT WORK WELDING & GRINDING

SHUTTERING, SCAFFOLDING,
611 3/31/2022 SUROJ 139 CONFINED SPACE ANCHOR BOLT

612 3/31/2022 SUROJ 525 GENERAL WORK SHUTTERING, SCAFFOLDING

SUBGRADE PREPERATION, TOP SOIL


613 3/31/2022 SUROJ 524 GENERAL WORK
REMOVING,

REINFORCEMENT,
614 3/31/2022 SUROJ 532 GENERAL WORK SHUTTERING,CONCRETE,
BACKFILLING

REINFORCEMENT,
615 3/31/2022 SUROJ 8 CONFINED SPACE SHUTTERING,CONCRETE,
BACKFILLING

SOIL LOADING & UNLOADING, TOP


616 3/31/2022 SUROJ 534 GENERAL WORK SOIL REMOVING

617 3/31/2022 SUROJ 52 EXCAVATION WORK SOIL EXCAVATION

618 3/31/2022 SUROJ 5003 GENERAL WORK CONCRETE FINISHING WORK


619 3/31/2022 SUROJ 237 GENERAL WORK CONCRETE, SHUTTERING,
REINFORCEMENT
To Work Tracker

Permit To Permit to Number


Job Permit
location Permit Owner Supervisor Work Start work End Of Remarks
Time Time Workers

OFFICE
AREA/ST ABHISHEK RAM VINAY RAM 9:00 6:00 7 G Shift
EEL YARD

VISCERA VIGHNESH AVDOOT 9:00 6:00 1 G Shift


PIPE
RACK VIGHNESH AVDOOT 9:00 6:00 23 G Shift
10,05,04,
11
PIPE
RACK
RAJSHEKHARAN E ANAND 9:00 6:00 5 G Shift

PIPE RAJSHEKHARAN E ANAND 9:00 6:00 5 G Shift


RACK
PIPE RAJSHEKHARAN E ANAND 9:00 6:00 15 G Shift
RACK
UTILITY
BUILDIN ABHISHEK DHARMARAJU 9:00 6:00 15 G Shift
G
UTILITY
BUILDIN VIGHNESH DHARMARAJU 9:00 6:00 5 G Shift
G
PROJECT
AREA
ABHISHEK M SUBHASH 9:00 6:00 4 G Shift

TEMPOR
ARY ABHISHEK M SUBHASH 9:00 6:00 10 G Shift
ROAD

PIPE
RACK,
UTILITY DINESHKUMAR GANESH DAS 18:00 22:00 15 B Shift
LIQUID
TANK

PIPE
RACK,
LIQUID DINESHKUMAR GANESH DAS 18:00 22:00 6 B Shift
TANK
PIPE
RACK,UTI DINESHKUMAR GANESH DAS 18:00 22:00 2 B Shift
LITY
TEMPOR
ARY RAJSHEKHARAN M SUBHASH 9:00 6:00 2 G Shift
ROAD
VISCERA VIGHNESH VIKASH 9:00 6:00 3 G Shift
VISCERA ABHISHEK VIKASH 9:00 6:00 3 G Shift
VISCERA VIJAYPRABHU SOURABH 9:00 6:00 2 G Shift
VISCERA VIJAYPRABHU SOURABH 9:00 6:00 5 G Shift
NEAR
SUBSTAT PONNIVALAM 7:40 6:00 9 G Shift
ION
NEAR
SUBSTAT PONNIVALAM 7:40 6:00 9 G Shift
ION
OFFICE ABHISHEK RAM VINAY RAM 9:15 6:00 13 G Shift
AREA
UTILITY RAJSHEKHARAN DHARMARAJU 9:15 6:00 10 G Shift
ABHISHEK DHARMARAJU 9:15 6:00 10 G Shift
RAJSHEKHARAN DHARMARAJU 9:15 6:00 12 G Shift
PROJECT
AREA
ABHISHEK M SUBHASH 9:15 6:00 6 G Shift

PROJECT ABHISHEK M SUBHASH 9:15 6:00 G Shift


AREA
PIPE
RACK RAJSHEKHARAN E ANAND 9:00 6:00 2 G Shift
10,05,04,
11

PIPE
RACK RAJSHEKHARAN E ANAND 9:00 6:00 30 G Shift
10,05,04,
11

PIPE
RACK ABHISHEK E ANAND 9:00 6:00 10 G Shift
10,05,04,
11
VISCERA ABHISHEK VIKASH 9:00 6:00 4 G Shift
VISCERA RAJSHEKHARAN VIKASH 9:00 6:00 4 G Shift
VISCERA RAJSHEKHARAN VIKASH 9:00 6:00 4 G Shift
NEAR
PUMP RAJSHEKHARAN ALAM 9:00 6:00 10 G Shift
HOUSE
NEAR
PUMP RAJSHEKHARAN ALAM 9:00 6:00 G Shift
HOUSE

UTILITY
BUILDIN
G,
SUBSTAT
ABHISHEK DHARMARAJU 9:00 6:00 10 G Shift
ION
WORK

UTILITY
BUILDIN
G,
SUBSTAT
RAJSHEKHARAN DHARMARAJU 9:00 6:00 10 G Shift
ION
WORK

UTILITY
BUILDIN
G,
SUBSTAT
RAJSHEKHARAN DHARMARAJU 9:00 6:00 G Shift
ION
WORK

OFFICE
PONNIVALAM RAM VINAY RAM 9:00 6:00 10 G Shift
AREA
ROAD ABHISHEK M SUBHASH 9:00 6:00 10 G Shift
PIPE
RACK,
PUMP DINESHKUMAR GANESH DAS 18:00 24:00 15 B Shift
ROOM

PIPE
RACK, DINESHKUMAR GANESH DAS 18:00 24:00 5 B Shift
UTILITY
PUMP
ROOM, DINESHKUMAR GANESH DAS 18:00 24:00 5 B Shift
UTILITY
PUMP
ROOM, DINESHKUMAR GANESH DAS 18:00 24:00 2 B Shift
UTILITY

PROJECT
AREA,
NEAR PONNIVALAM SOURABH 7:00 4:00 4 A Shift
PUMP
HOUSE
NORTH
COMPO
PONNIVALAM SOURABH 7:00 4:00 A Shift
UND
AREA

PROJECT
AREA,
NEAR PONNIVALAM SOURABH 7:00 4:00 3 A Shift
PUMP
HOUSE

NEAR
PUMP TIRUMILAVAM ALAM 9:00 6:00 4 G Shift
HOUSE
NEAR
PUMP ABHISHEK ALAM 9:00 6:00 4 G Shift
HOUSE
NEAR
PUMP ABHISHEK M SUBHASH 9:00 6:00 4 G Shift
HOUSE
TEMPOR
ARY ABHISHEK M SUBHASH 9:00 6:00 G Shift
ROAD
VISCERA ABHISHEK VIKASH 9:00 6:00 G Shift
VISCERA VIGHNESH VIKASH 9:00 6:00 G Shift
PIPE
RACK PONNIVALAM E ANAND 9:00 6:00 G Shift
10,05,04,
11

PIPE
RACK
10,05,04, PONNIVALAM 9:00 6:00 G Shift
E ANAND
11

PIPE
RACK PONNIVALAM E ANAND 9:00 6:00 G Shift
10,05,04,
11

UTILITY
PUMP ABHISHEK DHARMARAJU 9:00 6:00 G Shift
HOUSE
UTILITY
PUMP ABHISHEK DHARMARAJU 9:00 6:00 G Shift
HOUSE
NORTH
SIDE
COMPO DINESHKUMAR GANESH DAS 18:00 22:30 6 B Shift
UND
WALL

PIPE
RACK, DINESHKUMAR GANESH DAS 18:00 22:30 4 B Shift
PUMP
ROOM

PUMP
ROOM,
DINESHKUMAR GANESH DAS 18:00 22:30 12 B Shift
LIQUID
TANK
SCRAP
YARD
ABHISHEK ALAM 9:00 6:00 4 G Shift

UTILITY
PUMP TIRUMILAVAM DHARMARAJU 9:00 6:00 G Shift
HOUSE
UTILITY
PUMP TIRUMILAVAM DHARMARAJU 9:00 6:00 G Shift
HOUSE
UTILITY
PUMP TIRUMILAVAM DHARMARAJU 9:00 6:00 G Shift
HOUSE
OFFICE TIRUMILAVAM RAM VINAY RAM 9:00 6:00 G Shift
AREA
OFFICE ABHISHEK RAM VINAY RAM 9:00 6:00 11 G Shift
AREA
VISCERA TIRUMILAVAM VIKASH 9:00 6:00 20 G Shift
VISCERA ABHISHEK VIKASH 9:00 6:00 20 G Shift
VISCERA VIJAYPRABHU VIKASH 9:00 6:00 20 G Shift
ROAD
AREA PONNIVALAM M SUBHASH 9:00 6:00 G Shift

NEAR
MAIN PONNIVALAM SOURABH 9:00 6:00 G Shift
GATE
PIPE
VIJAYPRABHU AVDOOT 9:00 6:00 30 G Shift
RACK
PIPE ABHISHEK AVDOOT 9:00 6:00 30 G Shift
RACK
PIPE
RACK VIJAYPRABHU AVDOOT 9:00 6:00 30 G Shift
PIPE
RACK, DINESHKUMAR GANESH DAS 18:00 22:30 6 B Shift
VISCERA
PROJECT DINESHKUMAR GANESH DAS 18:00 22:30 10 B Shift
AREA

NEAR
NORTH
SIDE DINESHKUMAR GANESH DAS 18:00 22:30 5 B Shift
COMPO
UND
WALL

NEAR
NORTH
SIDE
DINESHKUMAR GANESH DAS 18:00 22:30 2 B Shift
COMPO
UND
WALL

NEAR
MAIN
GATE PONNIVALAM SOURABH 9:00 6:00 7 G Shift
PARKING

NEAR
MAIN
PONNIVALAM SOURABH 9:00 6:00 G Shift
GATE
PARKING

UTILITY
BUILDIN
G,
COMPO
PONNIVALAM SOURABH 9:00 6:00 4 G Shift
UND
WALL
PROJECT
AREA

TEMPOR
ARY PONNIVALAM M SUBHASH 9:00 6:00 G Shift
ROAD

MARS
PANEL ABHISHEK RAM VINAY RAM 9:00 6:00 7 G Shift
ROOM
MARS
PANEL RAJSHEKHARAN RAM VINAY RAM 9:00 6:00 3 G Shift
ROOM
PUMP
ROOM, ABHISHEK DHARMARAJU 9:00 6:00 10 G Shift
UTILITY
SUBSTAT ABHISHEK DHARMARAJU 9:00 6:00 12 G Shift
ION
UTILITY,
SUBSTAT TIRUMILAVAM DHARMARAJU 9:00 6:00 15 G Shift
ION
VISCERA ABHISHEK VIKASH 9:00 6:00 10 G Shift
VISCERA TIRUMILAVAM VIKASH 9:00 6:00 6 G Shift
VISCERA TIRUMILAVAM VIKASH 9:00 6:00 10 G Shift

NEAR
NORTH
SIDE DINESHKUMAR GANESH DAS 18:00 22:30 6 B Shift
COMPO
UND
WALL

NEAR
NORTH
SIDE
DINESHKUMAR GANESH DAS 18:00 22:30 1 B Shift
COMPO
UND
WALL

VICERA,
PIPE DINESHKUMAR GANESH DAS 18:00 22:30 6 B Shift
RACK
VICERA,
UTILITY DINESHKUMAR GANESH DAS 18:00 22:30 10 B Shift

PROJECT
AREA S SURESH SOURABH 7:00 9:00 2

EXCAVAT
ION &
S SURESH SOURABH 7:00 9:00 10
PROJECT
AREA

TEMPOR
ARY S SURESH SOURABH 7:00 9:00 5
ROAD
PROJECT
AREA S SURESH RAM VINAY RAM 7:00 9:00 1
PROJECT
AREA S SURESH RAM VINAY RAM 7:00 9:00 4

NORTH
SIDE
COMPO S SURESH M SUBHASH 7:20 3:00 11 A Shift
UND
WALL

NORTH
SIDE
COMPO S SURESH M SUBHASH 7:20 3:00 11 A Shift
UND
WALL

PIPE ABHISHEK AVDOOT 9:00 6:00 4 G Shift


RACK
LIQUID
TANK TIRUMILAVAM AVDOOT 9:00 6:00 4 G Shift
FARM
LIQUID
TANK RAJSHEKHARAN AVDOOT 9:00 6:00 4 G Shift
FARM

SUBSTAT
ION,
UTILITY, ABHISHEK DHARMARAJU 9:00 6:00 15 G Shift
PUIMP
ROOM,

PUMP
ROOM
ABHISHEK DHARMARAJU 9:00 6:00 15 G Shift

SUBSTAT
ION
TIRUMILAVAM DHARMARAJU 9:00 6:00 15 G Shift

PROJECT RAJSHEKHARAN RAM VINAY RAM 9:00 6:00 22 G Shift


AREA
PROJECT RAJSHEKHARAN RAM VINAY RAM 9:00 6:00 2 G Shift
AREA
VISCERA ABHISHEK VIKASH 9:00 6:00 20 G Shift
VISCERA TIRUMILAVAM VIKASH 9:00 6:00 20 G Shift

ROAD
PROJECT
AREA,
DINESHKUMAR E ANAND 15:00 22:30 12 B Shift
VISCERA,
PIPE
RACK
VISCERA,
PIPE
RACK 10, DINESHKUMAR E ANAND 15:00 22:30 6 B Shift
PUMP
HOUSE

PMC
NEAR
COMPU DINESHKUMAR 15:00 22:30 2 B Shift
E ANAND
ND WALL

NORTH
SIDE
COMPO
UND S SURESH M SUBHASH 7:15 3:00 8 A Shift
WALL,
ROAD

PROJECT
AREA,
NORTH
SIDE S SURESH M SUBHASH 7:15 3:00 8 A Shift
COMPO
UND
WALL

PROJECT
ROAD S SURESH M SUBHASH 7:15 3:00 8 A Shift
AREA

UTILITY,
SUBSTAT
ION, S SURESH DHARMARAJU 8:30 5:30 10 G Shift
PUMP
ROOM

OFFICE
AREA
TIRUMILAVAM RAM VINAY RAM 8:30 5:30 16 G Shift

OFFICE TIRUMILAVAM RAM VINAY RAM 8:30 5:30 16 G Shift


AREA
UTILITY
SUBSTAT S SURESH DHARMARAJU 8:30 5:30 20 G Shift
ION
UTILITY
SUBSTAT S SURESH DHARMARAJU 8:30 5:30 20 G Shift
ION
VISCERA S SURESH VIKASH 8:30 5:30 12 G Shift
VISCERA S SURESH VIKASH 8:30 5:30 12 G Shift
VISCERA TIRUMILAVAM VIKASH 8:30 5:30 2 G Shift
LIQUID
TANK S SURESH AVDOOT 8:30 5:30 4 G Shift
FARM
PIPE
RACK 5, S SURESH AVDOOT 8:30 5:30 3 G Shift
11
PIPE
RACK 5, S SURESH AVDOOT 8:30 5:30 3 G Shift
11

PIPE
RACK,
LIQUID DINESHKUMAR E ANAND 15:00 22:30 12 B Shift
TANK,
VISCERA

PIPE
RACK,
LIQUID DINESHKUMAR E ANAND 15:00 22:30 6 B Shift
TANK,
VISCERA

STACK
YARD,
DINESHKUMAR E ANAND 15:00 22:30 2 B Shift
ROAD
AREA

NEAR
NORTYH
SIDE ABHISHEK GANESH DAS 6:45 3:00 5 A Shift
COMPO
UND
WALL

NEAR
NORTYH
SIDE ABHISHEK GANESH DAS 6:45 3:00 5 A Shift
COMPO
UND
WALL

PROJECT
AREA ABHISHEK GANESH DAS 6:45 3:00 8 A Shift
ROAD
PROJECT
AREA ABHISHEK GANESH DAS 6:45 3:00 8 A Shift
ROAD
WORK

STEEL
YARD &
PROJECT
ABHISHEK RAM VINAY RAM 9:00 6:00 4 G Shift
AREA

NEAR
SCRAP ABHISHEK ALAM 9:00 6:00 4 G Shift
YARD

UTILITY
& ABHISHEK DHARMARAJU 9:00 6:00 2 G Shift
SUBSTAT
ION

UTILITY
&
SUBSTAT
ABHISHEK DHARMARAJU 9:00 6:00 20 G Shift
ION
PUMP
HOUSE
ABHISHEK DHARMARAJU 9:00 6:00 G Shift

TEMPOR
ARY ABHISHEK SOURABH 9:00 6:00 8 G Shift
ROAD

VISCERA ABHISHEK VIKASH 9:00 6:00 16 G Shift

VISCERA ABHISHEK VIKASH 9:00 6:00 G Shift


VISCERA TIRUMILAVAM VIKASH 9:00 6:00 G Shift
PIPE ABHISHEK AVDOOT 9:00 6:00 2 G Shift
RACK
PIPE
RACK
ABHISHEK AVDOOT 9:00 6:00 10 G Shift

PIPE ABHISHEK AVDOOT 9:00 6:00 7 G Shift


RACK

PIPE
RACK,
LIQUID
TANK, DINESHKUMAR E ANAND 15:00 22:30 12 B Shift
VISCERA,
SUBSTAT
ION
PIPE
RACK,
LIQUID DINESHKUMAR E ANAND 15:00 22:30 6 B Shift
TANK,
VISCERA

STACK
YARD,
UTILITY, DINESHKUMAR E ANAND 15:00 22:30 2 B Shift
ROAD
AREA

TEMPOR
ARY S SURESH GANESH DAS 6:30 3:00 10 A Shift
ROAD

TEMPOR
ARY S SURESH GANESH DAS 6:30 3:00 10 A Shift
ROAD

NORTH
SIDE
COMPO
UND S SURESH M SUBHASH 6:30 3:00 10 A Shift
WALL/
PROJECT
AREA

NORTH
SIDE
COMPO
UND S SURESH GANESH DAS 6:30 3:00 10 A Shift
WALL/
PROJECT
AREA

PUMP
ROOM ,
UTILITY, S SURESH DHARMARAJU 9:00 6:00 40 G Shift
SUBSTAT
ION
SUBSTAT
ION
TIRUMILAVAM DHARMARAJU 9:00 6:00 40 G Shift

PIPE
S SURESH AVDOOT 9:00 6:00 15 G Shift
RACK
PIPE S SURESH AVDOOT 9:00 6:00 30 G Shift
RACK
PIPE S SURESH AVDOOT 9:00 6:00 30 G Shift
RACK
VISCERA S SURESH AVDOOT 9:00 6:00 30 G Shift
VISCERA S SURESH AVDOOT 9:00 6:00 30 G Shift
STACK
YARD,
PROJECT DINESHKUMAR 15:00 22:30 10 B Shift
E ANAND
AREA
STACK
DINESHKUMAR E ANAND 15:00 22:30 B Shift
YARD
VISCERA DINESHKUMAR HIMANGHU 15:00 22:30 8 B Shift
VISCERA DINESHKUMAR HIMANGHU 15:00 22:30 B Shift
SUBSTAT ABHISHEK DHARMARAJU 9:00 6:00 35 G Shift
ION
SUBSTAT
ION
ABHISHEK DHARMARAJU 9:00 6:00 35 G Shift

LIQUID
TANK ABHISHEK AVDOOT 9:00 6:00 10 G Shift
FARM
LIQUID
TANK ABHISHEK AVDOOT 9:00 6:00 10 G Shift
FARM
LIQUID
TANK ABHISHEK AVDOOT 9:00 6:00 10 G Shift
FARM

NORTH
SIDE
COMPO S SURESH GANESH DAS 9:00 3:00 6 A Shift
UND
WALL

NORTH
SIDE
COMPO S SURESH GANESH DAS 9:00 3:00 6 A Shift
UND
WALL
PROJECT
AREA S SURESH M SUBHASH 9:00 3:00 6 A Shift
ROAD
PROJECT
AREA S SURESH M SUBHASH 9:00 3:00 6 A Shift
ROAD
VISCERA ABHISHEK VIKASH 9:00 6:00 8 G Shift
VISCERA ABHISHEK VIKASH 9:00 6:00 8 G Shift
OFFICE
AREA
ABHISHEK RAM VINAY RAM 9:00 6:00 6 G Shift

STACK
YARD,
PROJECT DINESHKUMAR 15:00 22:30 10 B Shift
E ANAND
AREA

STACK
YARD, DINESHKUMAR E ANAND 15:00 22:30 B Shift
PROJECT
AREA
SUBSTAT DINESHKUMAR HIMANGHU 15:00 22:30 8 B Shift
ION

NORTH
SIDE OF
COMPO S SURESH M SUBHASH 7:00 3:00 7 A Shift
UND
WALL

NORTH
SIDE
ROAD, S SURESH M SUBHASH 7:00 3:00 3 A Shift
COMPO
UND
WALL

SUBSATA
TION
ABHISHEK DHARMARAJU 9:00 6:00 G Shift

SUBSTAT ABHISHEK DHARMARAJU 9:00 6:00 G Shift


ION
SUBSTAT ABHISHEK DHARMARAJU 9:00 6:00 G Shift
ION

PIPE
RACK,
LIQUID S SURESH AVDOOT 9:00 6:00 G Shift
TANK
FARM
PIPE
RACK,
LIQUID S SURESH AVDOOT 9:00 6:00 G Shift
TANK
FARM

PROJECT
ROAD ABHISHEK SOURABH 9:00 6:00 G Shift
AREA
UTILITY ABHISHEK SOURABH 9:00 6:00 G Shift
UTILITY ABHISHEK AVDOOT 9:00 6:00 G Shift
VISCERA S SURESH HIMANGHU 9:00 6:00 G Shift
VISCERA RAJSHEKHARAN AVDOOT 9:00 6:00 G Shift

OFFICE ABHISHEK RAM VINAY RAM 9:00 6:00 G Shift


AREA
VISCERA S SURESH HIMANGHU 9:00 6:00 G Shift
STACK
YARD,
PROJECT DINESHKUMAR 15:00 22:30 15 B Shift
E ANAND
AREA

STACK
YARD,
DINESHKUMAR E ANAND 15:00 22:30 B Shift
PROJECT
AREA

SUBSTAT
ION &
PROJECT GANESH DAS 9:00 1:00 10 G Shift
AREA

NORTH
SIDE
ROAD/C S SURESH M SUBHASH 7:00 3:00 A Shift
OMPOU
ND WALL

NORTH
SIDE
ROAD/C S SURESH M SUBHASH 7:00 3:00 A Shift
OMPOU
ND WALL

TEMPOR
ARY DINESHKUMAR M SUBHASH 9:00 6:00 2 G Shift
ROAD
OFFICE
AREA S SURESH RAM VINAY RAM 9:00 6:00 6 G Shift

OFFICE
S SURESH RAM VINAY RAM 9:00 6:00 2 G Shift
AREA
SUBSTAT ABHISHEK DHARMARAJU 9:00 6:00 30 G Shift
ION
PUMP ABHISHEK DHARMARAJU 9:00 6:00 5 G Shift
ROOM

VISCERA DINESHKUMAR HIMANGHU 9:00 6:00 3 G Shift

VISCERA DINESHKUMAR HIMANGHU 9:00 6:00 20 G Shift


VISCERA DINESHKUMAR HIMANGHU 9:00 6:00 3 G Shift
VISCERA DINESHKUMAR HIMANGHU 9:00 6:00 15 G Shift

PIPE ABHISHEK AVDOOT 9:00 6:00 2 G Shift


RACK
LIQUID
TANK ABHISHEK AVDOOT 9:00 6:00 5 G Shift
FARM
LIQUID
TANK ABHISHEK AVDOOT 9:00 6:00 2 G Shift
FARM

STACK
YARD,
PROJECT TIRUMILAVAM E ANAND 15:00 22:30 12 B Shift
AREA
ROAD

STACK
YARD
TIRUMILAVAM E ANAND 15:00 22:30 B Shift

COMPO
UND GANESH DAS 6:30 3:00 11 A Shift
WALL

COMPO
UND
WALL/ GANESH DAS 6:30 3:00 11 A Shift
STACK
YARD

VISCERA S SURESH HIMANGHU 9:00 6:00 3 G Shift

VISCERA S SURESH HIMANGHU 9:00 6:00 15 G Shift


VISCERA S SURESH HIMANGHU 9:00 6:00 25 G Shift

LIQUID
TANK S SURESH AVDOOT 9:00 6:00 G Shift
FARM
LIQUID
TANK S SURESH AVDOOT 9:00 6:00 G Shift
FARM
LIQUID
TANK S SURESH AVDOOT 9:00 6:00 G Shift
FARM
OFFICE
AREA
ABHISHEK RAM VINAY RAM 9:00 6:00 G Shift

TEMPOR
ARY DINESHKUMAR SOURABH 9:00 6:00 G Shift
ROAD
PUMP ABHISHEK DHARMARAJU 9:00 6:00 5 G Shift
ROOM
SUBSTAT ABHISHEK DHARMARAJU 9:00 6:00 5 G Shift
ION
FUTURE
PARKING PONNIVALAM E ANAND 15:00 22:30 17 B Shift
AREA
FUTURE
PARKING PONNIVALAM E ANAND 15:00 22:30 B Shift
AREA
UTILITY PONNIVALAM AVDOOT 18:00 20:00 9 B Shift
STACK
YARD,
PROJECT S SURESH M SUBHASH 6:30 3:00 13 A Shift
AREA

STACK
YARD,
PROJECT S SURESH M SUBHASH 6:30 3:00 A Shift
AREA

PROJECT
AREA S SURESH GANESH DAS 6:30 3:00 6 A Shift
ROAD

TEMPRA
RY ROAD DINESHKUMAR SOURABH 9:00 6:00 6 G Shift
AREA
VISCERA RAJSHEKHARAN HIMANGHU 9:00 6:00 6 G Shift

VISCERA DINESHKUMAR HIMANGHU 9:00 6:00 6 G Shift

VISCERA RAJSHEKHARAN HIMANGHU 9:00 6:00 6 G Shift


SUBSTAT
ION
ABHISHEK DHARMARAJU 9:00 6:00 15 G Shift

PUMP
ROOM,
PIPE
ABHISHEK DHARMARAJU 9:00 6:00 10 G Shift
RACK
LIQUID
TANK
ABHISHEK AVDOOT 9:00 6:00 8 G Shift

LIQUID ABHISHEK AVDOOT 9:00 6:00 2 G Shift


TANK
LIQUID ABHISHEK AVDOOT 9:00 6:00 6 G Shift
TANK
OFFICE
AREA
RAJSHEKHARAN RAM VINAY RAM 9:00 6:00 5 G Shift

UTILITY ABHISHEK AVDOOT 9:00 6:00 10 G Shift


FUTURE
PARKING PONNIVALAM E ANAND 15:00 22:30 14 B Shift
AREA

FUTURE
PARKING
YARD,
NORTTH PONNIVALAM E ANAND 15:00 22:30 B Shift
SIDE
COMPO
UND
WALL

STACK
YARD/
NORTH
SIDE S SURESH GANESH DAS 6:30 3:00 13 A Shift
COMPO
UND
WALL
STACK
YARD/
NORTH
SIDE S SURESH GANESH DAS 6:30 3:00 13 A Shift
COMPO
UND
WALL

PROJECT
ROAD ABHISHEK M SUBHASH 9:00 6:00 2 A Shift
AREA
PROJECT
ROAD ABHISHEK M SUBHASH 9:00 6:00 2 A Shift
AREA
LIQUID ABHISHEK AVDOOT 9:00 6:00 2 A Shift
TANK
LIQUID ABHISHEK AVDOOT 9:00 6:00 7 A Shift
TANK
LIQUID
TANK
ABHISHEK AVDOOT 9:00 6:00 7 A Shift

VISCERA DINESHKUMAR HIMANGHU 9:00 6:00 G Shift

SUBSTAT
ION, ABHISHEK DHARMARAJU 9:00 6:00 20 G Shift
PUMP
ROOM

TEMPOR
ARY DINESHKUMAR SOURABH 9:00 6:00 9 G Shift
ROAD

VISCERA DINESHKUMAR HIMANGHU 9:00 6:00 G Shift

UTILITY
CHIMNA S SURESH AVDOOT 9:00 6:00 G Shift
Y
SUBSTAT 9:00 6:00 G Shift
ION
SUBSTAT
ION
TIRUMILAVAM ALAM 9:00 6:00 G Shift

OFFICE ABHISHEK RAM VINAY RAM 9:00 6:00 7 G Shift


AREA
UTILITY
CHIMNA S SURESH AVDOOT 9:00 6:00 G Shift
Y
UTILITY
CHIMNA S SURESH AVDOOT 9:00 6:00 G Shift
Y

FUTURE
PARKING
YARD,
NORTTH PONNIVALAM E ANAND 15:00 22:30 14 B Shift
SIDE
COMPO
UND
WALL

FUTURE
PARKING
YARD,
NORTTH PONNIVALAM E ANAND 15:00 22:30 14 B Shift
SIDE
COMPO
UND
WALL

S SURESH M SUBHASH 9:00 6:00 G Shift

VISCERA DINESHKUMAR HIMANGHU 9:00 6:00 G Shift

SUBSTAT ABHISHEK DHARMARAJU 9:00 6:00 G Shift


ION

UTILITY,
CHIMNY S SURESH AVDOOT 9:00 6:00 5 G Shift

PIPE
RACK S SURESH AVDOOT 9:00 6:00 G Shift
ROAD
UTILITY,
CHIMNY S SURESH AVDOOT 9:00 6:00 G Shift

NORTH
SIDE
COMPO ABHISHEK GANESH DAS 9:00 6:00 G Shift
UND
WALL

NORTH
SIDE
COMPO ABHISHEK GANESH DAS 9:00 6:00 G Shift
UND
WALL

OFFICE ABHISHEK RAM VINAY RAM 9:00 6:00 G Shift


AREA

VISCERA DINESHKUMAR HIMANGHU 9:00 6:00 G Shift

VISCERA PONNIVALAM HIMANGHU 9:00 6:00 G Shift

NORTHSI
DE
COMPO S SURESH GANESH DAS 6:00 03:00 11 A Shift
UND
WALL,

NORTHSI
DE
COMPO S SURESH GANESH DAS 6:00 03:00 3 A Shift
UND
WALL,

STEEL
YARD, TIRUMILAVAM RAM VINAY RAM 9:00 06:00 7 G Shift
OFFICE
AREA

VISCERA 9:00 06:00 G Shift

VISCERA 9:00 06:00 G Shift

VISCERA PONNIVALAM AVDOOT 9:00 06:00 4 G Shift


LIQUID
TANK,
PONNIVALAM AVDOOT 9:00 06:00 4 G Shift
PIPE
RACK
UTILITY DINESHKUMAR DHARMARAJU 9:00 06:00 5 G Shift
PUMP
ROOM, S SURESH DHARMARAJU 9:00 06:00 5 G Shift
PIPE
RACK

VISCERA DINESHKUMAR HIMANGHU 9:00 06:00 5 G Shift

PUMP
HOUSE S SURESH M SUBHASH 9:00 06:00 5 G Shift
ROAD

FUTURE
PARKING
, NORTH
SIDE ABHISHEK E ANAND 15:00 22:30 2 B Shift
COMPO
UND
WALL

FUTURE
PARKING
, NORTH
SIDE ABHISHEK E ANAND 15:00 22:30 8 B Shift
COMPO
UND
WALL

UTILITY,
SUBSTAT ABHISHEK HIMANGHU 18:00 22:00 10 B Shift
ION

NORTHSI
DE
COMPO ABHISHEK M SUBHASH 7:00 3:00 12 A Shift
UND
WALL,

VISCERA ABHISHEK HIMANGHU 9:00 6:00 19 G Shift


VISCERA ABHISHEK HIMANGHU 9:00 6:00 19 G Shift

VISCERA ABHISHEK HIMANGHU 9:00 6:00 5 G Shift

LIQUID
TANK
PONNIVALAM AVDOOT 9:00 6:00 4 G Shift

LIQUID PONNIVALAM AVDOOT 9:00 6:00 8 G Shift


TANK

PROJECT
AREA
PONNIVALAM SOURABH 9:00 6:00 3 G Shift

PROJECT PONNIVALAM SOURABH 9:00 6:00 3 G Shift


AREA

SUBSTAT
ION,
PUMPRO ABHISHEK DHARMARAJU 9:00 6:00 37 G Shift
OM,
UTILITY

OFFICE
AREA
PONNIVALAM RAM VINAY RAM 9:00 6:00 9 G Shift

NORTH
SIDE
COMPO ABHISHEK E ANAND 15:00 22:30 2 B Shift
UND
WALL

NORTH
SIDE
COMPO ABHISHEK E ANAND 15:00 22:30 8 B Shift
UND
WALL
VISCERA S SURESH HIMANGHU 18:00 21:00 11 B Shift
VISCERA S SURESH HIMANGHU 18:00 21:00 11 B Shift
VISCERA S SURESH HIMANGHU 18:00 21:00 4 B Shift
OFFICE
AREA PONNIVALAM RAM VINAY RAM 9:15 6:00 10 G Shift

SUBSTAT ABHISHEK ALAM 9:00 6:00 9 G Shift


ION

SUBSTAT ABHISHEK ALAM 9:00 6:00 9 G Shift


ION
SUBSTAT
ION,
UTILITY, ABHISHEK DHARMARAJU 9:00 6:00 29 G Shift
PUMP
ROOM

PUMP ABHISHEK DHARMARAJU 9:00 6:00 29 G Shift


ROOM

LIQUID TIRUMILAVAM AVDOOT 9:00 6:00 3 G Shift


TANK

LIQUID TIRUMILAVAM AVDOOT 9:00 6:15 5 G Shift


TANK

LIQUID TIRUMILAVAM AVDOOT 9:00 6:15 3 G Shift


TANK

LIQUID TIRUMILAVAM AVDOOT 9:00 6:15 2 G Shift


TANK

NORTH
SIDE
COMPO PONNIVALAM SOURABH 9:00 6:15 7 G Shift
UND
WALL

NORTH
SIDE
COMPO PONNIVALAM SOURABH 9:00 6:15 5 G Shift
UND
WALL

VISCERA PONNIVALAM HIMANGHU 9:00 6:00 20 G Shift

VISCERA PONNIVALAM HIMANGHU 9:00 6:00 13 G Shift

VISCERA PONNIVALAM HIMANGHU 9:00 6:00 11 G Shift

PROJCT ABHISHEK M SUBHASH 6:30 3:00 A Shift


AREA
TEMOPA ABHISHEK M SUBHASH 6:30 3:00 A Shift
RY ROAD

TEMOPA ABHISHEK M SUBHASH 6:30 3:00 3 A Shift


RY ROAD

PM
OFFICE
AREA,
TEMPOR S SURESH GANESH DAS 15:00 22:30 2 B Shift
ARY
ROAD

PM
OFFICE
AREA,
S SURESH GANESH DAS 15:00 22:30 8 B Shift
TEMPOR
ARY
ROAD

LIQUID
TANK, S SURESH AVDOOT 18:00 19:35 5 B Shift
UTILITY
STORE S SURESH HIMANGHU 17:30 19:30 6 B Shift

TEMOPA ABHISHEK M SUBHASH 6:00 3:00 6 A Shift


RY ROAD

TEMOPA ABHISHEK M SUBHASH 6:00 3:00 6 A Shift


RY ROAD

PROJECT
AREA ABHISHEK M SUBHASH 6:00 3:00 6 A Shift
ROAD

UTILITY,
SUBSTAT
ION, PONNIVALAM DHARMARAJU 9:00 6:00 30 G Shift
PUMP
ROOM

PUMP
ROOM PONNIVALAM DHARMARAJU 9:00 6:00 5 G Shift

OFFICE
AREA PONNIVALAM RAM VINAY RAM 9:00 6:00 7 G Shift

VISCERA ABHISHEK HIMANGHU 9:00 6:00 G Shift


VISCERA ABHISHEK HIMANGHU 9:00 6:00 G Shift

VISCERA ABHISHEK HIMANGHU 9:00 6:00 G Shift

SUBSTAT ABHISHEK ALAM 9:00 6:00 4 G Shift


ION

SUBSTAT ABHISHEK ALAM 9:00 6:00 5 G Shift


ION
LIQUID
TANK, ABHISHEK AVDOOT 9:00 6:00 G Shift
PIPE
RACK

LIQUID
TANK, ABHISHEK AVDOOT 9:00 6:00 G Shift
PIPE
RACK

LIQUID
TANK, ABHISHEK AVDOOT 9:00 6:00 G Shift
PIPE
RACK

NORTH
SIDE
COMPO PONNIVALAM SOURABH 9:00 6:00 G Shift
UND
WALL

NORTH
SIDE
COMPO PONNIVALAM SOURABH 9:00 6:00 G Shift
UND
WALL

TEMPOR
ARY ABHISHEK M SUBHASH 6:30 3:00 7 A Shift
ROAD

TEMPOR
ARY ABHISHEK M SUBHASH 6:30 3:00 3 A Shift
ROAD
SUBSTAT TIRUMILAVAM ALAM 9:00 6:00 7 G Shift
ION

SUBSTAT TIRUMILAVAM ALAM 9:00 6:00 G Shift


ION

PUMP ABHISHEK DHARMARAJU 9:00 6:00 G Shift


HOUSE

SUBSTAT
ION,
PUMP ABHISHEK DHARMARAJU 9:00 6:00 G Shift
ROOM,
UTILITY

OFFICE TIRUMILAVAM RAM VINAY RAM 9:00 6:00 7 G Shift


AREA

NORTH
SIDE
COMPO
UND PONNIVALAM SOURABH 9:00 6:00 G Shift
WALL,
RCC
ROAD

NORTH
SIDE
COMPO PONNIVALAM SOURABH 9:00 6:00 G Shift
UND
WALL

LIQUID
TANK, PONNIVALAM AVDOOT 9:00 6:00 5 G Shift
PIPE
RACK

VISCERA PONNIVALAM HIMANGHU 9:00 6:00 8 G Shift

VISCERA PONNIVALAM HIMANGHU 9:00 6:00 25 G Shift


VISCERA PONNIVALAM HIMANGHU 9:00 6:00 15 G Shift

VISCERA PONNIVALAM HIMANGHU 9:00 6:00 3 G Shift


LIQUID
TANK, PONNIVALAM HIMANGHU 9:00 6:00 10 G Shift
PIPE
RACK

TEMOPA
S SURESH GANESH DAS 15:00 22:30 19 B Shift
RY ROAD

TEMOPA
RY ROAD S SURESH GANESH DAS 15:00 22:30 1 B Shift

UTILITY S SURESH DHARMARAJU 18:00 20:00 30 B Shift

TEMOPA ABHISHEK M SUBHASH 6:30 3:00 3 A Shift


RY ROAD

TEMOPA ABHISHEK M SUBHASH 6:30 3:00 5 A Shift


RY ROAD

PROJECT ABHISHEK M SUBHASH 6:30 3:00 3 A Shift


AREA
SUBSTAT PONNIVALAM ALAM 9:00 6:00 8 G Shift
ION
SUBSTAT PONNIVALAM ALAM 9:00 6:00 8 G Shift
ION
OFFICE PONNIVALAM RAM VINAY RAM 9:00 6:00 8 G Shift
AREA
PUMP DINESHKUMAR DHARMARAJU 9:00 6:00 10 G Shift
ROOM

UTILITY,
SUBSTAT
ION, DINESHKUMAR DHARMARAJU 9:00 6:00 30 G Shift
PUMP
ROOM

LIQUID
TANK, DINESHKUMAR AVDOOT 9:00 6:00 5 G Shift
PIPE
RACK
LIQUID
TANK,
DINESHKUMAR AVDOOT 9:00 6:00 5 G Shift
PIPE
RACK
PROJECT DINESHKUMAR SOURABH 9:00 6:00 4 G Shift
AREA
PROJECT
AREA DINESHKUMAR SOURABH 9:00 6:00 4 G Shift
ROAD

VISCERA PONNIVALAM AVDOOT 9:00 6:00 6 G Shift

TEMPOR
S SURESH GANESH DAS 15:00 22:30 22 B Shift
ARY
ROAD

TEMPOR
ARY S SURESH GANESH DAS 15:00 22:30 1 B Shift
ROAD
OFFICE
AREA S SURESH GANESH DAS 16:00 17:30 3 B Shift
UTILITY S SURESH HIMANGHU 18:00 22:00 15 B Shift
VISCERA S SURESH HIMANGHU 17:30 22:00 2 B Shift

VISCERA S SURESH HIMANGHU 15:00 22:00 5 B Shift

VISCERA S SURESH HIMANGHU 15:00 22:00 3 B Shift

VISCERA S SURESH HIMANGHU 15:00 22:00 4 B Shift

TEMPOR
ARY PONNIVALAM M SUBHASH 6:00 3:00 4 A Shift
ROAD

TEMPOR
ARY PONNIVALAM M SUBHASH 6:00 3:00 5 A Shift
ROAD

PROJECT
AREA PONNIVALAM M SUBHASH 6:00 3:00 5 A Shift
ROAD
OFFICE TIRUMILAVAM RAM VINAY RAM 9:15 6:15 7 G Shift
AREA

SUBSTAT
ION,
UTILITY, DINESHKUMAR DHARMARAJU 9:00 6:00 34 G Shift
PUMP
ROOM
UTILITY DINESHKUMAR DHARMARAJU 9:00 6:00 34 G Shift
PUMP
ROOM,
DINESHKUMAR DHARMARAJU 9:00 6:00 34 G Shift
SUBSTAT
ION

LIQUID
DINESHKUMAR AVDOOT 9:00 6:00 12 G Shift
TANK

LIQUID
DINESHKUMAR AVDOOT 9:00 6:00 12 G Shift
TANK

LIQUID
DINESHKUMAR AVDOOT 9:00 6:00 12 G Shift
TANK

VISCERA PONNIVALAM HIMANGHU 9:00 6:00 3 G Shift

VISCERA PONNIVALAM HIMANGHU 9:00 6:00 4 G Shift

VISCERA PONNIVALAM HIMANGHU 9:00 6:00 16 G Shift

VISCERA PONNIVALAM HIMANGHU 9:00 6:00 9 G Shift

ROAD
AREA,
SUBSTAT TIRUMILAVAM SOURABH 9:00 6:00 8 G Shift
ION,
PUMP
ROOM

ROAD
AREA,
SUBSTAT TIRUMILAVAM SOURABH 9:00 6:00 4 G Shift
ION,
PUMP
ROOM

PIPE
S SURESH GANESH DAS 18:00 22:30 5 B Shift
RACK
TEMPOR
ARY S SURESH GANESH DAS 18:00 22:30 1 B Shift
ROAD
LIQUID S SURESH AVDOOT 18:00 20:15 8 B Shift
TANK
LIQUID
TANK S SURESH AVDOOT 18:00 20:15 8 B Shift
VISCERA S SURESH HIMANGHU 18:00 20:00 3 B Shift
VISCERA S SURESH HIMANGHU 18:00 20:00 5 B Shift

NORTH
SIDE
COPOUN S SURESH GANESH DAS 6:20 22:30 7 B Shift
D WALL

NORTH
SIDE
S SURESH GANESH DAS 6:20 22:30 1 B Shift
COPOUN
D WALL

SUBSTAT
ION,
LIQUID TIRUMILAVAM GANESH DAS 9:00 1:00 33 G Shift
TANK,
VISCERA

SUBSTAT TIRUMILAVAM ALAM 9:00 1:00 2 G Shift


ION
SUBSTAT TIRUMILAVAM ALAM 9:00 1:00 2 G Shift
ION

VISCERA S SURESH HIMANGHU 8:30 17:30 19 G Shift

VISCERA S SURESH HIMANGHU 8:30 17:30 2 G Shift

VISCERA S SURESH HIMANGHU 8:30 17:30 5 G Shift

VISCERA S SURESH HIMANGHU 8:30 17:30 4 G Shift

UTILITY S SURESH AVDOOT 8:00 17:00 37 G Shift

UTILITY S SURESH AVDOOT 8:00 17:00 37 G Shift


WEST
SIDE
ROAD / DINESHKUMAR SOURABH 7:45 6:00 6 G Shift
PROJECT
AREA

WEST
SIDE
ROAD / DINESHKUMAR SOURABH 7:45 6:00 2 G Shift
PROJECT
AREA

SUBSTAT
ION/ PONNIVALAM AVDOOT 8:00 5:00 27 G Shift
PUMP
ROOM
OFFICE PONNIVALAM RAM VINAY RAM 9:15 6:15 6 G Shift
AREA

TEMPOR
ARY
ROAD & DINESHKUMAR RAJNEESH 8:45 5:45 18 G Shift
PMC
OFFICE

OFFICE
AREA / S SURESH RAM VINAY RAM 8:40 6:15 8 G Shift
STEEL
YARD
NEAR
DINESHKUMAR G NAGARJUNA 8:30 5:30 4 G Shift
UTILITY

NEAR
UTILITY DINESHKUMAR
G NAGARJUNA 8:30 5:30 2 G Shift

NEAR
PUMP
ROOM &
SUBSTAT DINESHKUMAR SOURABH 8:30 5:30 5 G Shift
ION
NORTH
SIDE
NEAR
PUMP
ROOM &
SUBSTAT DINESHKUMAR SOURABH 8:30 5:30 2 G Shift
ION
NORTH
SIDE

UTILITY S SURESH DHARMARAJU 8:30 5:30 G Shift

PUMP
ROOM, S SURESH DHARMARAJU 8:30 5:30 10 G Shift
SUBSTAT
ION

UTILITY S SURESH DHARMARAJU 8:30 5:30 6 G Shift

LIQUID S SURESH AVDOOT 8:40 5:40 3 G Shift


TANK

LIQUID S SURESH AVDOOT 8:40 5:40 3 G Shift


TANK

VISCERA S SURESH HIMANGHU 8:30 5:30 10 G Shift

VISCERA S SURESH HIMANGHU 8:30 5:30 2 G Shift

VISCERA S SURESH HIMANGHU 8:30 5:30 10 G Shift

VISCERA S SURESH HIMANGHU 8:30 5:30 10 G Shift

PIPE S SURESH SHARAD 9:00 6:00 2 G Shift


RACK

PIPE S SURESH SHARAD 9:00 6:00 3 G Shift


RACK

SUBSTAT TIRUMILAVAM ALAM 9:00 6:00 G Shift


ION

SUBSTAT RAJSHEKHARAN ALAM 9:00 6:00 4 G Shift


ION
NORTH
SIDE
COMPO DINESHKUMAR DINESHKUMAR SINGH 8:30 5:30 4 G Shift
UND
WALL

WEST
SIDE OF DINESHKUMAR M SUBHASH 8:30 5:30 4 G Shift
ROAD

NORTH
SIDE
COMPO DINESHKUMAR M SUBHASH 8:30 5:30 G Shift
UND
WALL

NEAR
NORTH
COMPO ABHISHEK SOURABH 6:30 3:00 2 A Shift
UND
WALL
AREA

NEAR
NORTH
COMPO ABHISHEK SOURABH 6:30 3:00 7 A Shift
UND
WALL
AREA

UTILITY DINESHKUMAR G NAGARJUNA 9:00 6:00 G Shift

UTILITY DINESHKUMAR G NAGARJUNA 9:00 6:00 G Shift

PUMP
ROOM
NORTH DINESHKUMAR M SUBHASH 9:00 6:00 7 G Shift
& WEST
SIDE

TEMPOR
ARY
ROAD DINESHKUMAR RAJNEESH 9:00 6:00 18 G Shift
AREA /
PARKING

PIPE DINESHKUMAR G NAGARJUNA 9:00 6:00 2 G Shift


RACK
STEEL ABHISHEK RAM VINAY RAM 9:00 6:00 8 G Shift
YARD
UTILITY ABHISHEK B VENKATESH 9:00 6:00 G Shift

UTILITY TIRUMILAVAM B VENKATESH 9:00 6:00 G Shift

SUBSTAT TIRUMILAVAM ALAM 9:00 6:00 5 G Shift


ION
SUBSTAT TIRUMILAVAM ALAM 9:00 6:00 5 G Shift
ION
PIPE
RACK
DINESHKUMAR DINESHKUMAR SINGH 9:00 6:00 3 G Shift
NORTH
SIDE
PIPE ABHISHEK DHARMARAJU 9:00 6:00 G Shift
RACK
PIPE ABHISHEK DHARMARAJU 9:00 6:00 G Shift
RACK

VISCERA ABHISHEK HIMANGHU 9:00 6:00 7 G Shift

VISCERA ABHISHEK HIMANGHU 9:00 6:00 7 G Shift

VISCERA ABHISHEK HIMANGHU 9:00 6:00 2 G Shift

VISCERA ABHISHEK HIMANGHU 9:00 6:00 11 G Shift

SUBSTAT ABHISHEK SHARAD 9:00 6:00 G Shift


ION

SUBSTAT ABHISHEK SHARAD 9:00 6:00 G Shift


ION
LIQUID
TANK, ABHISHEK AVDOOT 9:00 6:00 3 G Shift
PIPE
RACK

LIQUID
TANK, ABHISHEK AVDOOT 9:00 6:00 7 G Shift
PIPE
RACK
PIPE
RACK DINESHKUMAR G NAGARJUNA 4:00 6:00 3 B Shift

NORTH
SIDE
COMPO S SURESH GANESH DAS 15:00 22:30 6 B Shift
UND
WALL

NORTH
SIDE
COMPO S SURESH GANESH DAS 15:00 22:30 1 B Shift
UND
WALL

NORTH
COMPO ABHISHEK SOURABH 6:30 3:00 6 A Shift
UND
WALL

NORTH
COMPO ABHISHEK SOURABH 6:30 3:00 5 A Shift
UND
WALL
STEEL ABHISHEK RAM VINAY RAM 9:00 6:00 5 G Shift
YARD
TEMPOR
ARY DINESHKUMAR RAJNEESHKUMAR 9:00 6:00 14 G Shift
ROAD

PIPE
RACK,
DINESHKUMAR G NAGARJUNA 9:00 6:00 5 G Shift
PUMP
ROOM

UTILITY TIRUMILAVAM B VENKATESH 9:00 6:00 20 G Shift

SUBSTAT DINESHKUMAR DHARMARAJU 9:00 6:00 15 G Shift


ION

PIPE
RACK,
RAW DINESHKUMAR SHARAD 9:00 6:00 2 G Shift
WATER
TANK

PIPE
RACK,
RAW DINESHKUMAR SHARAD 9:00 6:00 2 G Shift
WATER
TANK
SUBSTAT ABHISHEK ALAM 9:00 6:00 5 G Shift
ION
SUBSTAT ABHISHEK ALAM 9:00 6:00 5 G Shift
ION
LIQUID
TANK, TIRUMILAVAM AVDOOT 9:00 6:00 5 G Shift
PIPE
RACK
LIQUID TIRUMILAVAM AVDOOT 9:00 6:00 5 G Shift
TANK

PUMP
ROOM
NORTH DINESHKUMAR M SUBHASH 9:00 6:00 6 G Shift
& WEST
SIDE

PUMP
ROOM
NORTH ABHISHEK HIMANGSHU 9:00 6:00 30 G Shift
& WEST
SIDE

PUMP
ROOM
NORTH ABHISHEK HIMANGSHU 9:00 6:00 30 G Shift
& WEST
SIDE

NORTH
SIDE
COMPO S SURESH DINESHKUMAR SINGH 15:00 22:30 4 B Shift
UND
WALL

NORTH
SIDE
COMPO S SURESH DINESHKUMAR SINGH 15:00 22:30 1 B Shift
UND
WALL
UTILITY S SURESH DINESHKUMAR SINGH 18:20 22:30 5 B Shift

VISCERA S SURESH HIMANGSHU 18:00 20:00 5 B Shift