F2 270 2290
F3 -270 2290
F4 1780 2150
F5 -1780 2150
℄ ℄
TUNNEL AXIS VERTICAL ROAD AXIS
TUNNEL AXIS VERTICAL ROAD AXIS
30
30
0
0
R4
R4
92
92
0
0
GEOTEXTILE AND WATER
GEOTEXTILE AND WATER
PROOFING
PROOFING
F8
500 3500 3500 500 F8
500 3500 3500 500
60
R70 60
R70
3216
3216
F1 0
R554 F1 0
R554
300mm THICK CAST IN SITU
300mm THICK CAST IN SITU
INNER CONCRETE LINING
INNER CONCRETE LINING
750 F3 F2 750
750 F3 F2 750
F5 F4
F5 F4
1916
2290
1916
2290
SLOTTED CHANNEL (CAST FROM AT PRECAST CONCRETE
ELEMENT SLOTTED CHANNEL (CAST FROM AT PRECAST CONCRETE
CONCRETE) 1020 ELEMENT
CONCRETE) 1020
1010
2% 1010
2% F7 2.5% F0 2.5% F6 2%
2% F7 2.5% F0 2.5% F6
550
550
CABLE DUCT SIDEWALL DRAINAGE EMBEDDED
CABLE DUCT SIDEWALL DRAINAGE EMBEDDED
IN POROUS CONCRETE
180
IN POROUS CONCRETE
180
MORTAR BED
MORTAR BED
1100
1100
100MM
1100
1100
100MM
CONCRETE M30 CONCRETE M30
LONGITUDINAL DRAINAGE
LONGITUDINAL DRAINAGE
PIPE HOLE
PIPE HOLE
MORTAR BED 100mm
1390 1390 MORTAR BED 100mm
1390 1390