Structured What-If Technique Analysis

Facility/Operation/Process: Air Compressor Heat Exchanger


Date: August 07, 2017 Team: Saud Al-Oqbi / Saefudin / Carlos / Mohammed Aref

ID # What-If… Causes Consequences Controls Recommendations


Air release at high
pressure by process
Personal injudy 1.A.1 Create a maintenance
1.A Not properly isolated in process air suction and No existing control
leading LTI procedure
side when opening the tube discharge is not fully
sheet cover closed
Air release at high
1.B.1 Insuring LOTO
pressure by Personal injudy
1.B **same** No existing control procedure for applying before
compressor is not leading LTI
starting the job
locked out

Uncontrol movement of hand Not using proper Personal injudy 2.1 Include using power tools
2 No existing control
tools tools leading LTI in maintenance procedure

The tube shhet 3.1 Developing a


The tube sheet coved failed Personal injudy
3 cover is not secured No existing control dismentalling procedure for
down leading LTI
after removing the the H.E

4.1 equip the motor with


Boken wire during tube pundle tube pundle twest Personal injudy
4 No existing control overload function and make
pulling / inserting lead to wire cut leading LTI
sure ist operational