N0 Project promoter Administration Project description Cost of the project Locality Matured

Construction and equipment of a block of


1 KONYE COUNCIL MINEDUB classrooms at GS Ikiliwindi-Ejupindi in konye 28,769,361 GS Ikiliwindi-Ejupindi Matured

Construction and equipment of a block of


2 KONYE COUNCIL MINEDUB classrooms at GS Ikiliwindi-Kobe in konye 28,023,750 GS Ikiliwindi-Kobe Matured

3 KONYE COUNCIL MINEDUB The construction of two classrooms at GS KOKAKA 21,000,000 GS KOKAKA Matured

4 KONYE COUNCIL MINEDUB The equipment of GS KOKAKA with (60)benches 1,800,000 GS KOKAKA Matured

Equipment of GS Kokaka with two teachers' chairs


5 KONYE COUNCIL MINEDUB 250,000 GS KOKAKA Matured
and tables and cupboards

Construction of a block of two latrine with six


6 KONYE COUNCIL MINEDUB 5,773,370 KONYE Matured
compartments at G.S GS Ikiliwindi-Kobe in konye

Construcrion and Equipment of a block of two


7 KONYE COUNCIL MINEDUB 28,769,361 KONYE Matured
classrooms at GS DIKORO

8 KONYE COUNCIL MINEDUB The construction of Nursery blocks at GNS IBEMI 25,000,000 KONYE Matured

139,385,842
the construction of potable supply Scheme at
9 KONYE COUNCIL MINEE 49,999,995 KONYE Matured
DIONGO
10 KONYE COUNCIL MINEE Provision of solar street light in Konye town 100,000,000 Konye town Matured
Provision of solar electricity to the District hospital
11 KONYE COUNCIL MINEE 48,034,113 Konye town Matured
of Konye
198,034,108

12 KONYE COUNCIL MINCOM Equipment of the konye council community Radio 39,971,400 KONYE COUNCIL Matured

39,971,400
Construction of an integrated center at matondo IIin matondo IIin konye
13 KONYE COUNCIL MINSANTE 50,000,000 Matured
konye council area council area
Construction of an integrated center at Wone in Wone in konye council
14 KONYE COUNCIL MINSANTE 50,000,000 Matured
konye council area area
100,000,000
Construction of a bridge (20m long, 03 high, and 06
15 KONYE COUNCIL MINTP wideI) across River konye at the konye District 197,240,216 KONYE Matured
hospital street

16 KONYE COUNCIL MINTP Rehabilitation of streets in Mbakwa supe in Konye 52,271,500 Mbakwa supe Matured

streets (Mungo street


0.553km, water side
Tarrimg of (1.721km long by 6m wide) streets
street 0.392km,
(Mungo street 0.553km, water side street 0.392km,
17 KONYE COUNCIL MINTP 343,492,446 Masenge street Matured
Masenge street 0.105km,GHS street 0.431km and 0.105km,GHS street
Malende street
0.431km and Malende
street

streets (Mungo street


0.553km, water side
Tarrimg of (1.229km long by 6m wide) streets
street 0.392km,
(Educat street 0.23km, church-Mboka Mo street
18 KONYE COUNCIL MINTP 246,386,501 Masenge street Matured
0.3287km, Mbiako street 0.128km,Tina street 0.217 0.105km,GHS street
in Mbakwa supe in konye council area
0.431km and Malende
street

839,390,663
1,316,782,013
N0 Project promoter Administration Project description Cost of the project Locality Matured
Organisation of annual cultural festival
1 KUMBA I COUNCIL MINAC ( annually) 25,000,000 KUMBA Matured

Training and empowering of 25 vulnerable persons


on income generating activities (shoe repairs, beats
2 KUMBA I COUNCIL MINAS transformation, hairdressing, small scale business…) 4,500,000 KUMBA Matured
(annually)
29,500,000
construction of a grand stand in the Kumba II
3 KUMBA II COUNCIL MINDDEVEL council area 20,969,504 KUMBA Matured

20,969,504
Tarring of 2.0km of earth road from Alaska street to
4 KUMBA I COUNCIL MINDHU the projected bridge at Kumba water- fonmenky 490,684,236 KUMBA Matured
street.
490,684,236

5 KUMBA I COUNCIL MINEDUB Construction of a block of 02 classrooms at G.S Diffa 21,000,000 DIFFA Matured

Construction of a block of 2 classroom at


6 KUMBA I COUNCIL MINEDUB 25,000,000 Kumba Mbeng II Matured
Government Nursery School Kumba-Mbeng II
Construction of a block of 2 classrooms at GS
7 KUMBA I COUNCIL MINEDUB 21,000,000 NKALIMAKUM Matured
NKALIMAKUM
Construction of a block of 2 classrooms at GS
8 KUMBA II COUNCIL MINEDUB 21,000,000 EKEMBA Matured
EKEMBA
Production of 700 school benches to GS Kossala GS Kossala,
9 KUMBA II COUNCIL MINEDUB 22,000,000 Matured
Pulletin, GS Ekemba Pulletin,Ekamba
110,000,000
installation of 200 solar powered street lights within
10 KUMBA I COUNCIL MINEE 359,431,425 KKUMBA Matured
Kumba I subdivision
installation of 200 solar powered street lights within
11 KUMBA I COUNCIL MINEE 200,000,000 KUMBA Matured
Kumba I subdivision
construction of 03 boreholes at Differ Kake I and
12 KUMBA I COUNCIL MINEE 25,500,000 KUMBA Matured
Kake II quarters in Kumba 1 council area
Installation of 200 solar powered street lights,
13 KUMBA I COUNCIL MINEE 359,431,425 KUMBA Matured
(phase I)
Construction of 02 boreholes in the quarters; at
Makata III,
14 KUMBA I COUNCIL MINEE Makata III and MakataV withinKumba I Council il 17,000,000 Matured
area. Makata V

Construction of 03 boreholes in the quarters Makata


MAKATA, Makiti,
15 KUMBA I COUNCIL MINEE (1), Makiti (1) and Ngamalikum I (1) in Kumba I 25,500,000 Ngamilikum Matured
Council area.
equipping of kumba 11 street with solar panels
16 KUMBA II COUNCIL MINEE phase 11 130,000,000 KUMBA 11 Matured

1,116,862,850
Keeping kumba I council area clean through
17 KUMBA I COUNCIL MINEPDED collection and enforcement of the ban on plastic 4,000,000 KUMBA Matured
waste for 2021 - 2023
4,000,000
Construction of a slaughter house at KAKE I in
18 KUMBA I COUNCIL MINEPIA Kumba I 45,575,496 KUMBA Matured

Building Plan for the construction of communal


19 KUMBA II COUNCIL MINEPIA Aninals feed processing Center for rears groups at 50,250,647 Ekemue I Matured
Ekemue I
construction of a poultry farm in the Kumba II
20 KUMBA II COUNCIL MINEPIA 17,431,420 kumba Matured
council area
113,257,563
Construction of a fence at Bukwemue I.H.C, Kumba
21 KUMBA I COUNCIL MINSANTE 64,462,364 Bukwemue Matured
1.
Equipment for the Bukweme IHC in Kumba I
22 KUMBA I COUNCIL MINSANTE 9,000,000 kumba I Matured
Subdivision
23 KUMBA II COUNCIL MINSANTE Contruction of a mortuary at Kossala IHC 42,748,110 KOSSALA IHC Matured
116,210,474

24 KUMBA I COUNCIL MINSEP Organisation annual sporting competition (annually) 4,000,000 KUMBA Matured

4,000,000

25 KUMBA I COUNCIL MINTP Rehabilitation of 1.5 km road to Lake BarombiMbo 40,472,735 Barombi Mbo Matured

Construction of a 12m long bridge crossing over


bonakama and
26 KUMBA I COUNCIL MINTP kumba water at quarter head street-Bonakama 127,311,038 Matured
kumba III
linking Kumba III
Construction of a Bridge at Kumba Town-beny
27 KUMBA I COUNCIL MINTP 259,028,742 Kossala Matured
ground-Kossala (phase II)

Rehabilitation of 2.0 km of earth road from


Meboka, Makiti,
28 KUMBA I COUNCIL MINTP Congelcam through Meboka Junction to Nkamlikum 30,710,691 Matured
makata
junction below high court, Makiti-Makata Quarter

Rehabilitation of 2.5km of earth road at


29 KUMBA I COUNCIL MINTP Nkamudikum II Quarter(cassava farm junction I and 36,192,852 Nkamudikum II Matured
II to downstream) at Nkamlikum II Quarter

Construction of double box culvert at Cassava farm


30 KUMBA I COUNCIL MINTP 23,541,858 Nkamudikum II Matured
Nkamalikum II Quarter
517,257,916
2,522,742,543
N0 Project promoter Administration Project description Cost of the project Locality Matured
Construction of two classrooms at GSS EKEMBA in
1 PRINCIPAL MINESEC 21,000,000 EKEMBA Matured
Kumba II Subdivision
21,000,000
21,000,000
N0 Project promoter Administration Project description Cost of the project Locality Matured
Support to the vulnerable poupulation at Mbonge
1 MBONGE MINAS council 3,700,000 MBONGE Matured

Financial support to vulnerable population Mbonge


2 MBONGE MINAS council 2,000,000 MBONGE COUNCIL Matured

5,700,000
3 MBONGE MINEDUB construction of a Nursery block -Big Nganjo 25,000,000 Big Nganjo Matured

4 MBONGE MINEDUB Construction of two classrooms at GPS MBONGE 21,000,000 MBONGE Matured

46,000,000
construction a borehole at the cultural centre -Big
5 MBONGE MINEE 8,000,000 Big Nganjo Matured
Nganjo
construction a borehole at the IHC centre -Big
6 MBONGE MINEE 8,500,000 Big Nganjo Matured
Nganjo

7 MBONGE MINEE Construction of borehole at GPS Mbonge Marumba 8,500,000 Mbonge Matured

8 MBONGE MINEE Construction of a borehole at Mbonge Market 8,000,000 MBONGE Market Matured
33,000,000
Support to the organisation the most attractive
9 MBONGE MINEPIA 2,500,000 MBONGE Matured
livestock reaser Mbonge council
Support to the organisation the most attractive
10 MBONGE MINEPIA 2,500,000 MBONGE Matured
livestock reaser Mbonge council
5,000,000
89,700,000