Subject: Specification
Date: July 26, 2021
Owner: Mary Grace Peru Dulay
Architect: Sean Andrew Soriano
1. GENERAL
All works in this project shall be done in accordance with the latest edition of
National Building Code of the Philippines (PD 1096) and its implementing rules and
regulation, Philippine Electrical Code, Plumbing Code of the Philippines, National
Structural Code of the Philippines. Use appropriate Personal Protective Equipment
and worn by the Workmen.
B. Safety Measures
The Contractor shall be responsible for safety of all workmen and other persons
entering the Works and shall at his own expense take all measures, subject to the
Engineer’s approval, necessary to ensure their safety. Such measures shall include
but not limited to:
o Appropriate personal protective equipment (helmet, dusk mask, safety
shoes and hand gloves) must be provided and worn by Workmen;
o First Aid Cabinet must be fully equipped and readily available for
treatment of sickness and injuries; Provide safety and emergency
regulations for fire and electric shock prevention;
o Safe control of flowing water; and Conduct regular safety meeting.
D. Ceiling
- Ceiling framing shall be 2”x2” @ 24” O.C. both ways with standard accessories of
metal furrings.
- 12mm thick gypsum board.
- Provide manholes for maintenance.
E. Roofing
- Roofing shall be gauge #22 or #24 rib-type sheets.
- Provide insulations.
- Use plain G.I. sheets for flashing.
F. Lumber
- Lumber shall be approved quality of their respective kinds required for various parts
of the works, well-seasoned, thoroughly drr and free from loose knots, saps, shakes
and other imperfections.
o Yakal
o Aptitong
o Narra
o Tanguile
G. Plumbing works
- Use 13mm for water supply atleast PPR.
- Rough-in sanitary drainage be schedule 40 or approved equal
- Verify plumbing plan for the other details
H. Painting
- Use Boysen/Davies or any approved equal
- Interior wall shall be applied with one (1) primer and two (2) final coats. Either flat
latex or semi-gloss.
- Ceiling shall be applied first coat primer and two coats of final coats. Flat latex.
I. Hardwares
- All locksets shall be approved quality in their respective kind.
- Use 4 pcs of hinges for every door. Exterior door shall be provided with deadbolt or
barrel bolt.
J. Termite Control
- Termite control is a method to prolong and protect structures from termite
infestation. Soil poisoning is the process wherein the soil is treated with chemical
solutions to control and prevent the entry of termite into the structure. After
excavation, soil treatment must be done. The bottom surface and the sides of the
excavation made from masonry foundation and basements shall be treated with
termite concentrate at a rate of 5 L/sq.m surface area or as specified by the product
data.
L. REMOVAL OF FORMWORKS
- Formworks shall be carefully removed without shock or disturbance to the concrete.
No formworks shall be removed until the concrete has attained sufficient strength to
support its own weight and any loads that maybe placed on it. Side forms of beams
and girder maybe removed earlier than the bottom forms but the additional posts or
shoring must be placed under the beam or girder until its attains the sufficient
strength., are given below:
Nothing follows