TALLER 1

UNIVERSIDAD POLITECNICA SALESIANA

JORGE FREIRE ROSALES


DIgSILENT
G1 CARGA BARRA 2
G1
~ G2
SG G2
~
SG

BARRA_1 BARRA_ 2

LINEA-1
LINEA_1-2

LINEA_2 LINEA-3
L 1-3 LINEA_2-3

BARRA_3

CARGA BARRA 3

Project: TALLER 1
UPS
JORGE FREIRE ROSALES Graphic: VENTANA
ANALISIS FALLA
Date: 12/11/2021
PowerFactory 15.1.7 Annex:
TALLER #2 - DIGSILENT (DS-T2).IntPrj
TALLER #2 - DIGSILENT (1).IntPrj
Grid: VENTANA Study Case: Study Case
Equipment: Lines Annex: / 1
Name From To Type Cross-Sec. Num- R X B Distance In Der.
Busbar Busbar [mm^2] ber [Ohm/km] [Ohm/km] [uS/km] [km] [kA] factor
LINEA-1 BARRA_1 BARRA_ 2 LINEA_1-2 0.00 1 0.0800 0.2400 0.0000 25.000 0.530 1.00
LINEA-3 BARRA_ 2 BARRA_3 LINEA_2-3 0.00 1 0.0600 0.0180 0.0000 25.000 0.530 1.00
LINEA_2 BARRA_1 BARRA_3 L 1-3 0.00 1 0.0200 0.0600 0.0000 25.000 0.530 1.00
Grid: VENTANA Study Case: Study Case
Equipment: Loads Annex: / 2
Out S P No
of P Q Voltage System of
Name Busbar Service Type Q cosphi [p.u.] Type Phases Conn.
CARGA BARRA BARRA_ 2 No 25.00 MVA 0.85 69.00
CARGA BARRA BARRA_3 No 25.00 MVA 0.85 69.00
Grid: VENTANA Study Case: Study Case
Equipment: Synchronous Machines Annex: / 3
Name Type Num- Sn Un cos xd" xd"sat. R2 x2 R0 x0 Re xe
Busbar ber [MVA] [kV] phi [p.u.] [p.u.] [p.u.] [p.u.] [p.u.] [p.u.] [Ohm ] [Ohm ]
G 1 BARRA_1 G1 1 100.00 69.00 0.85 0.20 0.20 0.000 0.200 0.000 0.100 0.000 0.000
G2 BARRA_ 2 G2 1 100.00 69.00 0.85 0.20 0.20 0.000 0.200 0.000 0.100 0.000 0.000
Grid: VENTANA Study Case: Study Case
Equipment: Terminals Annex: / 4
Name Inside Type Un System No. of Ithlim Iplim
Element [kV] Type Phases [kA] [kA]
BARRA_ 2 B2 69.00 AC 3 0.00 0.00
BARRA_1 B1 69.00 AC 3 0.00 0.00
BARRA_3 B3 69.00 AC 3 0.00 0.00
DIgSILENT Project:
PowerFactory
15.1.7 Date: 12/11/2021

Load Flow Calculation Grid Summary


AC Load Flow, balanced, positive sequence Automatic Model Adaptation for Convergence No
Automatic Tap Adjust of Transformers No Max. Acceptable Load Flow Error for
Consider Reactive Power Limits No Nodes 1.00 kVA
Model Equations 0.10 %

Grid: VENTANA System Stage: VENTANA Study Case: Study Case Annex: / 1
Grid: VENTANA Summary
No. of Substations 0 No. of Busbars 3 No. of Terminals 0 No. of Lines 3
No. of 2-w Trfs. 0 No. of 3-w Trfs. 0 No. of syn. Machines 2 No. of asyn.Machines 0
No. of Loads 2 No. of Shunts 0 No. of SVS 0
Generation = 42.78 MW 27.01 Mvar 50.59 MVA
External Infeed = 0.00 MW 0.00 Mvar 0.00 MVA
Inter Grid Flow = 0.00 MW 0.00 Mvar
Load P(U) = 42.50 MW 26.34 Mvar 50.00 MVA
Load P(Un) = 42.50 MW 26.34 Mvar 50.00 MVA
Load P(Un-U) = 0.00 MW 0.00 Mvar
Motor Load = 0.00 MW 0.00 Mvar 0.00 MVA
Grid Losses = 0.28 MW 0.67 Mvar
Line Charging = 0.00 Mvar
Compensation ind. = 0.00 Mvar
Compensation cap. = 0.00 Mvar
Installed Capacity = 170.00 MW
Spinning Reserve = 127.22 MW
Total Power Factor:
Generation = 0.85 [-]
Load/Motor = 0.85 / 0.00 [-]