BARRA_1 BARRA_ 2
LINEA-1
LINEA_1-2
LINEA_2 LINEA-3
L 1-3 LINEA_2-3
BARRA_3
CARGA BARRA 3
Project: TALLER 1
UPS
JORGE FREIRE ROSALES Graphic: VENTANA
ANALISIS FALLA
Date: 12/11/2021
PowerFactory 15.1.7 Annex:
TALLER #2 - DIGSILENT (DS-T2).IntPrj
TALLER #2 - DIGSILENT (1).IntPrj
Grid: VENTANA Study Case: Study Case
Equipment: Lines Annex: / 1
Name From To Type Cross-Sec. Num- R X B Distance In Der.
Busbar Busbar [mm^2] ber [Ohm/km] [Ohm/km] [uS/km] [km] [kA] factor
LINEA-1 BARRA_1 BARRA_ 2 LINEA_1-2 0.00 1 0.0800 0.2400 0.0000 25.000 0.530 1.00
LINEA-3 BARRA_ 2 BARRA_3 LINEA_2-3 0.00 1 0.0600 0.0180 0.0000 25.000 0.530 1.00
LINEA_2 BARRA_1 BARRA_3 L 1-3 0.00 1 0.0200 0.0600 0.0000 25.000 0.530 1.00
Grid: VENTANA Study Case: Study Case
Equipment: Loads Annex: / 2
Out S P No
of P Q Voltage System of
Name Busbar Service Type Q cosphi [p.u.] Type Phases Conn.
CARGA BARRA BARRA_ 2 No 25.00 MVA 0.85 69.00
CARGA BARRA BARRA_3 No 25.00 MVA 0.85 69.00
Grid: VENTANA Study Case: Study Case
Equipment: Synchronous Machines Annex: / 3
Name Type Num- Sn Un cos xd" xd"sat. R2 x2 R0 x0 Re xe
Busbar ber [MVA] [kV] phi [p.u.] [p.u.] [p.u.] [p.u.] [p.u.] [p.u.] [Ohm ] [Ohm ]
G 1 BARRA_1 G1 1 100.00 69.00 0.85 0.20 0.20 0.000 0.200 0.000 0.100 0.000 0.000
G2 BARRA_ 2 G2 1 100.00 69.00 0.85 0.20 0.20 0.000 0.200 0.000 0.100 0.000 0.000
Grid: VENTANA Study Case: Study Case
Equipment: Terminals Annex: / 4
Name Inside Type Un System No. of Ithlim Iplim
Element [kV] Type Phases [kA] [kA]
BARRA_ 2 B2 69.00 AC 3 0.00 0.00
BARRA_1 B1 69.00 AC 3 0.00 0.00
BARRA_3 B3 69.00 AC 3 0.00 0.00
DIgSILENT Project:
PowerFactory
15.1.7 Date: 12/11/2021
Grid: VENTANA System Stage: VENTANA Study Case: Study Case Annex: / 1
Grid: VENTANA Summary
No. of Substations 0 No. of Busbars 3 No. of Terminals 0 No. of Lines 3
No. of 2-w Trfs. 0 No. of 3-w Trfs. 0 No. of syn. Machines 2 No. of asyn.Machines 0
No. of Loads 2 No. of Shunts 0 No. of SVS 0
Generation = 42.78 MW 27.01 Mvar 50.59 MVA
External Infeed = 0.00 MW 0.00 Mvar 0.00 MVA
Inter Grid Flow = 0.00 MW 0.00 Mvar
Load P(U) = 42.50 MW 26.34 Mvar 50.00 MVA
Load P(Un) = 42.50 MW 26.34 Mvar 50.00 MVA
Load P(Un-U) = 0.00 MW 0.00 Mvar
Motor Load = 0.00 MW 0.00 Mvar 0.00 MVA
Grid Losses = 0.28 MW 0.67 Mvar
Line Charging = 0.00 Mvar
Compensation ind. = 0.00 Mvar
Compensation cap. = 0.00 Mvar
Installed Capacity = 170.00 MW
Spinning Reserve = 127.22 MW
Total Power Factor:
Generation = 0.85 [-]
Load/Motor = 0.85 / 0.00 [-]